This has been a really cold winter so far, and there’s still a lot more winter to come.  Fortunately for our viva riders on the newly opened Highway 7 rapidway, keeping you warm was one of our priorities when we designed the new median stations.  Like everything else with vivaNext, a lot of engineering analysis and planning was done to ensure the enclosures provide the right level of comfort in the winter.  Here’s the background.

When we opened the prototype vivaNext station at Enterprise and Warden, we used a well-regarded heater that our original analysis showed would keep things adequately warm.  But at 1000 watts, the heater wasn’t quite powerful enough to provide the level of comfort we wanted to achieve.  So when it came time to design the shelters for the larger rapidway program, we went back to the drawing board.

First, we determined how warm we wanted to make the shelters. Given that most people are only waiting for a few minutes, we didn’t want to make the shelters so warm that people would need to take off their coats.  Bearing this in mind, we decided that the right target would be to heat the shelters to 10 degrees Celsius.

Next, we needed to find a technology that would be energy efficient: with the enclosures’ semi-outdoor design, using traditional space heaters would, in addition to requiring exhaust systems and airflow, be very inefficient. We decided to use radiant heaters, which work by projecting heat energy directly onto the people in the shelter (if you’ve watched your kids play hockey at a rink, you’ll know how effective this kind of heater can be).  Another benefit is that radiant heaters quickly ramp up to full power but can be shut off quickly as well, conserving energy.

Last, we needed to determine how many heaters we’d need to install to achieve our target temperature.  We did a computer simulation of the bus shelter, programming in local weather data to assess the thermal conditions in the shelter for every hour throughout a typical year.  The model took into consideration the concrete and glass design of the shelter, as well as replicating wind speeds and temperatures.

Using all this information, we decided that four heaters, each providing 3000 watts of power, would be sufficient to achieve the 10 degrees target: that’s 12,000 watts per enclosure (a typical electric fireplace is between 750 and 1500 watts). Sensors on the units detect when someone walks into the enclosure, starting the heater; if the sensors don’t detect any other movement, the heaters will shut off after 30 minutes.   And to help keep the warmth in the enclosures, we’ve installed push buttons on the doors so they close automatically, as well as installing winter covers over the ventilation louvers on the doors.

We hope you are pleased with the comfort we’ve been able to design into the shelters, and are happy to make winter a little warmer for our viva riders.

 

Categories
General Uncategorized

harsh winters can be a challenge

It takes a special kind of person to work in construction. Not only do they have to keep up with the physical demands of the job, they also have to deal with the elements including our hot humid summers and very cold winters.

Canadian winters can be very ruthless with high wind chills, heavy snowfalls, freezing rain and extremely cold temperatures. We’ve already witnessed all of the above this winter and Jack Frost has shown no signs of letting up as 2013 went out like a lion and 2014 came in much the same. If you ventured outside during the recent deep freeze, you know just how unbearably cold it can get.

Despite the inconvenience of the freezing temperatures, our vivaNext projects continue to move along. Our contractors brave the elements all year long in order to keep construction progressing to achieve the end result, a faster more convenient rapid transit system that will serve the public for generations to come.

For those of us already counting down the days until spring [70 to be exact], remember that in a few short months, the leaves will be unfurling and the tulips will be poking up through the ground. Nothing lasts forever, not even winters in Canada, although some days it feels like spring is an eternity away.

We look forward to warmer weather and sunny skies not only so we can get out and enjoy our short lived Canadian summers but also so the vivaNext construction projects can continue full speed ahead in ideal weather conditions.

 

Categories
Construction General Live-work-play Urban Planning

managing the vivaNext plan

When I first joined the vivaNext team, it was pretty small since we were still at the early stages of our rapid transit program.  Now, with an overall team of nearly 78 at York Region Rapid Transit Corporation (YRRTC); and many more staff and experts allocated to the projects through the construction contractors, all these people are working on the vivaNext plan which is going flat out, with planning, procurement, design and construction activities underway concurrently.  Here’s the rundown on what we’re doing now, and a preview on some of our other projects you’ll hear more about soon.

The most visible parts of vivaNext – our rapidway construction projects on Highway 7 East and Davis Drive in Newmarket – are definitely a major focus for our team, but they’re only part of what we’ve got going on these days. Moving a major infrastructure project like a rapidway segment forward from the early design stages to the introduction of service requires years of careful planning and oversight, starting with preliminary design and environmental assessments years before construction can start.   The same general work plan is currently being followed for the remainder of the Highway 7 rapidway (opening next year) and along Davis Drive in Newmarket.  Project management for our active construction projects involves a large part of our team, including engineering, property, finance and communications staff.

In addition, we’re in the early stages of pre-construction for the rapidway on either side of the Vaughan Metropolitan Centre (VMC) on Highway 7, with final design work being completed for the VMC station itself, overtop of the TYSSE concourse for the subway.

At an earlier stage, but already demanding dedicated project teams, is the Yonge Street rapidways in Richmond Hill and Newmarket, and the rapidways that will be built along this major commuter line.

And because a rapid transit network needs more than new lanes, stations and streetscaping, we’ve also got a number of dedicated facilities to plan and build, which will provide the future vivaNext system with more capacity for passengers, bus maintenance, and commuter parking.  All of those components are currently under active development, requiring the involvement of project teams with property, design, engineering and financial expertise.  Our currently funded projects add up to a total program value of $3.2 billion, which will see us build 37 km of bus rapidways with 38 stations, an 8.6 km subway extension with six stations, an operations facilities, two bus terminals and multiple park ‘n ride facilities over the next five years in York Region.

Last but definitely not least, lots of activity is underway to secure funding for future segments starting with the extension to the Yonge Subway, which is the missing link needed to fully connect the vivaNext system to the broader GTHA transit network.

Everyone at YRRTC works on multiple projects, which allows us to share our knowledge across the program, identify what’s worked well in the past, and ensure that we build on success.   Collectively we’ve already amassed a lot of expertise, making design and construction refinements to future projects that reflect what we’ve learned so far.

We all work hard, but the enthusiasm we pick up from the community is so motivating, it’s hard to imagine doing anything more satisfying.  We know that with just a few kilometers of rapidway open along the Highway 7 East rapidway, transit travel times have already been reduced and traffic flows improved.  So we’re all looking forward to the major improvements that we’ll all get to enjoy, when the whole system is open in a few years from now.

Stay tuned for regular updates throughout 2014, it promises to be a significant year for transit.

 

Categories
Announcements General Uncategorized

changes in how you contact vivaNext

As of January 4, 2014, the extension numbers will be changing from four to five digits.

Don’t worry it’s not as cumbersome as it sounds, the only difference will be adding a “7” in front of all current four-digit extensions for all internal phone lines.  This change also applies to all York Region services identified below:

  • Court Services
  • Emergency Medical Services (in case of emergency, please dial 911)
  • Family and Children’s Services
  • Housing
  • Long-term Care
  • Economic Development
  • Police Services
  • Public Health
  • Regional roads
  • Social Assistance
  • Solid Waste Management
  • YRT/Viva
  • Water and sewage treatment

 

Categories
Community Events General Live-work-play

spending quality time with your loved ones

This holiday season we hope you have the opportunity to gather together, to share, reflect and renew the love and laughter that makes quality time with family and friends precious and meaningful.  York Region has a lot of great sites and events that you can explore on YRT\Viva transit lines over the holidays, from skating at the Markham Civic Centre outdoor rink, First Night Celebration in the Town of Richmond Hill, to the Winter Wonderland at the Riverwalk Commons in Newmarket.

Here at vivaNext, we are also taking this time to rest, relax and rejuvenate so come January we will be ready to jump into work.  The New Year will bring with it the continuation of construction on Davis Drive in Newmarket with road widening, utility relocation and paving.  The Highway 7 transformation in the City of Markham is continuing with utility relocation, boulevard streetscaping and paving. Work will also ramp up on the west side of Highway 7 into The City of Vaughan with retaining wall construction and utility relocations. And on Yonge Street in Richmond Hill and Newmarket, preparation for construction will start to take place.

Until then, please enjoy the season with those near and dear.  See you in the New Year.

Categories
Construction General Rapidways

as the cold wind blows…

Seems like just yesterday vivaNext was ramping up construction activities at the first sign of warmer temperatures and while the warmer weather was here this year, a lot of progress was made along the vivaNext corridors. We captured our developments and put together a short video to share the progress of the transformation for each corridor.

Building on our successes, we will keep the progress moving even as we wind down for the return of Old Man Winter. Although the weather specialists forecast a cold winter season, our vivaNext construction projects will continue as the snow flies and the cold wind blows.  Here’s a snapshot of what we’re going to be working on this winter along the vivaNext corridors and how we’ll manage to keep construction moving along even when the temperatures plunge.

In Newmarket, crews will continue storm sewer installation, utility relocations and underground ductbank [gathers together and encases telecommunication wires] installation along Davis Drive. The south side of western creek culvert near Niagara Street will be also be widened over the next several months.

In Markham, utility relocations will continue on South Town Centre Boulevard, Cedarland Drive and Warden Avenue. Some construction work will also continue on Highway 7 East in the centre median.

Along the Vaughan Metropolitan Centre [VMC] corridor, hydro, gas and telecommunications installations and relocations will continue. Work will also begin on the CN Bridge. Preliminary construction activity also continues in Vaughan along Highway 7 West from Helen Street to Edgeley Boulevard and from east of Bowes Road to Yonge Street, including parts of Bathurst Street and Centre Street.

On Yonge Street, surveying, geotechnical testing and utility locates will take place in Richmond Hill and Newmarket. In early 2014, the design-build contract of the Yonge Street rapidway will be awarded. Once the contract is awarded, rapidway construction will begin.

While construction continues outside, inside our contractors are preparing for a busy spring. They are finalizing designs, plans and schedules for next year so when the warm weather returns construction crews can hit the ground running.

To see the progress we’re making over the winter, follow us on Twitter and Facebook. You can also sign up for email notices at vivanext.com to keep you updated on the construction underway in your area.

Categories
Construction General Live-work-play

ol’ man winter is here… are you ready?

Yes, it’s that time of year again, winter arrives officially this weekend.  The weather reports are full of white stuff, and the frosty temperatures are here.  Now is the time to ensure you are extra vigilant and aware of your surroundings at intersections, crosswalks and in construction areas as you travel the roads in York Region.

Snow and ice wreak havoc on the traveling public, but disasters are largely preventable.  If poor weather is forecast, plan ahead and leave plenty of time to get to your destination.  Better yet, postpone unnecessary trips until the weather has improved. As always we encourage you to try transit in bad weather days, but if you are driving, keep your vehicle tuned up and be especially aware of your tire condition.  Snow tires are the best bet in the winter months, but regardless of tire type, be sure to check pressures and tread wear regularly.

The bottom line is that winter is a Canadian fact and we can’t change the weather.  All we can do is prepare for it and understand the inherent hazards.

Here are some safety tips to help navigate construction zones in the winter safely:

  • Obey the speed limit – You should be careful to obey the speed limit in construction zones, as many will be lower than normal.
  • Keep on the lookout for construction workers – One of the main reasons that construction zones can be so dangerous is that there are often people working on the side of the road. You will want to be very careful when you drive and try to be aware of any workers.
  • Watch for lane changes – Often in construction zones, the lanes move differently than normal. Especially at night, in bad weather, or when it is difficult to see, pay attention to where your lane goes.
  • Be especially careful if there is no shoulder – A lot of times, construction forces the closure of the shoulder.

Remember to always be aware of road conditions and those who are working in these zones. As you pass through the vivaNext projects, we know that our construction disrupts the life of pedestrians, transit riders and drivers, and we do everything we can to keep that to a minimum.

We hope that as you pass by our construction areas you’ll keep safety in mind!  Travel safe!

Categories
General Uncategorized

social and community responsibility

The holiday season is a time of year where our community calls on all of us to help out just a little bit more and think of those that are in need of some help.

Here at vivaNext, staff are proud to be actively involved with the York Region Children’s Aid Society holiday Heroes program.  The Holiday Heroes program helps by donating new toys, new clothing, new winter outerwear, toiletries, gift cards and food vouchers to the children and families served by the agency.

This year, we have joined together to personally sponsor a family of seven.  Over the past two weeks, staff has been collecting everything from toiletries, toys, educational materials, practical items for teens and tweens – things we sometimes take for granted but that can be luxuries to a youth on a tight budget.

This season there are so many charitable organizations and agencies that are in need of support, be it money, merchandise, food or time. Sometimes the goodwill of the holiday season brings about great things.

At this time of year we would like to call to mind all the volunteers who tirelessly give of themselves to make life that much brighter and happier for those within our communities.  Thank you!

 

Categories
General Uncategorized

tis the season to support your local businesses

It’s that time of year again, holiday decorations adorn windows and doors, festive music fills the air and it seems everyone’s in a rush to go somewhere.  With the holidays fast approaching, you may be feeling a little overwhelmed with what to get that special someone.  Don’t fret the businesses along the vivaNext corridors are here to help you find the perfect gift.

The shops and services on Highway 7 and Davis Drive will take the stress and worry out of your holiday shopping. Your local merchants will help you find that perfect treasure for those nearest and dearest and will help you cross everything off your holiday shopping list. While you’re out and about, take a break from shopping with a stop at one of your favourite restaurants. Why not hop aboard yrt/viva to get you to and from your destinations?

Once you’re done shopping and you’ve checked your list twice, pour a glass of eggnog and congratulate yourself on a job well done!  You got all your shopping done with a little help from your local businesses.

Support your local businesses this holiday season. Your neighbours look forward to seeing you!

 

    [poll id=”45″]

 

Categories
Announcements General

‘Holey’ ‘Moley’ tunnelling is complete!

photograph provided by The Toronto Transit Commission [TTC]

Here at vivaNext, we’re excited to announce that the Toronto-York Spadina Subway Extension (TYSSE) project has achieved another significant milestone – tunnelling for the project is 100% complete!

In the summer of 2011, the first Tunnel boring machine (TBM) “Holey” began boring from a launch shaft at the Downsview Park Station site. Since then, rain or shine, TBMs “Holey”, “Moley”, “Yorkie” and “Torkie” have been working hard and have collectively bored 6.4 kilometres of twin tunnels for the TYSSE project.

The final segment of tunnelling was finished when “Torkie” broke through the headwall at the Vaughan Metropolitan Centre (VMC) Station site, finishing the tenth and final tunnel drive for the project. This sets the stage for the next phase of work in the tunnels including installation of inverts and walkways, track, traction power, signals and communications systems.

With help from our friends at Toronto Transit Commission (TTC) we have some pretty cool photos and videos of the breakthrough to share with you on our website – see them here!

The TYSSE is an 8.6-kilometre extension of the TTC’s Yonge-University-Spadina subway line from Downsview Station to the VMC Station at Highway 7 in York Region.

Vaughan’s VMC station will be the northernmost station, connecting to a variety of other transit services. Situated in the future VMC development area, this station will act as a transportation hub, including convenient passenger pick-up and drop-off, a York Region Transit bus terminal, and connection to the viva rapidway running in dedicated lanes east and west along Highway 7.

Residents and visitors alike will enjoy the variety of transit options and mixed-use development offered in the VMC area. It will be a great place to work, shop or relax, and getting there will be easy whether you walk or ride transit.

Construction work for the TYSSE project is expected to be completed by fall 2016. Once the subway extension is completed, it will have 6 new subway stations (check out the TYSSE guide to station names) and 3 new commuter parking lots.

To learn more about the TYSSE project and sign up for construction notices, visit vivanext.com.