we’re preparing for spring [despite what groundhogs may say…]

we’re preparing for spring [despite what the groundhog may say…]

The groundhogs seem to be of differing opinions about when spring is coming. Of the big three – Wiarton Willie, Shubenacadie Sam and Punxsutawney Phil – one says winter is over, and two predict six more weeks.

We’re ready for spring to come at vivaNext, with lots of plans afoot to continue the transformation of York Region’s busiest roads to rapidways.

When spring has sprung and the ground has thawed, our crews will be ready to carry out their detailed construction plans.

We carry out construction in all seasons, but there are some things that need warmer temperatures, like road widening, paving and of course, planting! Planters will be installed along Yonge Street in Newmarket this spring. At our newly open Vaughan Metropolitan Centre Station, the planters are ready and waiting for a green touch, soon to be filled with greenery.

We’re paving the way to spring with information, preparing newsletters on our projects, and keeping our Board and local stakeholders updated. Subscribe to sign up for email updates today.

At this time of year, we’re looking forward to ramping up our work. It’s not long now, and whether the groundhogs are right or wrong, we’re ready for spring.

Categories
General Safety

a look forward >> fall and winter

a look forward >> fall and winter

We’re holding onto summer, but signs of fall are all around us. Kids waiting for buses in new jackets and boots, fall decorations in the stores, and even the geese are starting to head south.

We know many students walk and take our Viva buses to get to and from school, so we hope those who choose to drive remember to stay alert and keep an eye out for kids, especially at intersections and in construction zones.

Rapid transit construction continues this fall and winter in Newmarket, Richmond Hill and Vaughan. This December, students in Vaughan and at York University will have exciting new transit options, with Viva buses on the new Highway 7 rapidway taking riders to the subway extension – in service in December – along with a YRT bus terminal within walking distance.

Did you miss a few things on your back-to-school list? If so, be sure to check out the shops in our construction areas >> Shop 7, Shop Yonge, and Shop Bathurst & Centre!

 

Categories
Construction Rapidways Safety Uncategorized

let it snow!

Brrrr…..Winter decided to make an entrance this week! With the arrival of snow, our project teams put their winter maintenance plans into action.

With a bit of hard work and planning, the teams will ensure that our construction corridors are routinely maintained over the winter months to make sure everything is safe and secure, and that there is clear and easy access.

When our rapidway projects are in the construction phase, care and control of the corridor is transferred from York Region over to our constructor, but they need a little help maintaining the roads and sidewalks during the winter months.

They rely on our local municipalities [Vaughan, Richmond Hill and Newmarket] to assist with snow and ice clearing on the sidewalks, as well as York Region’s Roads branch to maintain the roadways.

With their specialized equipment and around-the-clock maintenance crews, the Municipalities and the Region are better equipped to handle whatever Mother Nature throws at us.

Before our teams can put their winter maintenance plans into action, we need to ensure that our construction corridors meet minimal maintenance standards. Traffic lanes and sidewalks are inspected to make sure they are wide enough to accommodate snow clearing machinery.

All sidewalks must be cleaned and potholes filled. Traffic barrels are inspected and cleaned so that they are visible at night.

Even though snow continues to fall outside, our construction crews will continue to work at building the rapidways in Newmarket, Richmond Hill and Vaughan.  Stay up-to-date on work in your area by subscribing to our updates. Happy shoveling!

 

Categories
General

winter scoop

winter scoop

Winter may have been a little delayed this year, but judging from the frigid temperature outside… it’s here. Although our construction crews might not be able to continue to work in this cold weather, some work is still being done. Even in construction areas, winter maintenance and road clearing will still be done throughout the winter months.

All of our rapidway projects are at different stages, either open or underway. Each piece of each project is unique, and detailed designs are refined before we even get started on construction. Then there’s always coordination to be done with utility companies and municipalities, so we work on that ahead of time to help construction go smoothly in the spring. When a project is almost done, there’s a lot of technical testing, plus communications to local residents and commuters throughout the project’s life.

Even when things slow down due to the weather outside, we’re busy inside. Construction management teams are carefully scheduling work for 2016, and designers are completing detailed plans.

As snow falls outside, your local municipality [e.g., Newmarket, Vaughan, Richmond Hill, Markham] will clear the sidewalks, York Region’s Roads branch is responsible for clearing the rapidway lanes [see their video!] and YRT/Viva operations staff look after the vivastation platforms.

We know that everyone wants to know what’s happening, so we’ll be sending out updates regularly. If you’d like to receive announcements and construction notices about work in your area, be sure to sign up for updates.  So… that’s the scoop for this winter – inside and out!

 

Categories
Rapidways Stations

rapidways in winter

rapidways in winter - Town Centre Station on Highway 7 East

It’s definitely winter! Nobody knows that better than outdoor maintenance crews. When there is snow and ice, York Region’s crews are on duty on our new Highway 7 East rapidway, clearing the way for rapid transit. In Markham, the rapidway travels down South Town Centre Boulevard and Cedarland Drive. The glass canopies at vivastations shelter Viva customers from light flurries, but when heavy snow or ice make an appearance, the heated enclosure is where you want to be.  To remove the snow at the stations, a contractor from YRT/Viva operations shovels and salts the vivastation platforms so that they’re safe for everyone. Sidewalks are usually a municipal responsibility, so the new sidewalks along the Highway 7 West rapidway are cleared by the City of Markham and Town of Richmond Hill.

.
Before the rapidway was built on Highway 7 East, sidewalks were few and far between, and there were smaller curb-side Viva stops. The street has now been transformed from a suburban freeway to a walkable urban street and transit route [with bike lanes!]. With the new facelift complete there are benefits for everyone and the same treatment is coming next year on Davis Drive!  Think spring!