warranty work >> ensuring quality for years to come

warranty work >> ensuring quality for years to come

When you’re building rapidways for generations to enjoy, it’s important to make sure that the end product is what we want.

Everything – from the paving stones on the sidewalk, to the glass in the canopies, to the red asphalt – is tested, inspected and verified by qualified engineers with a keen eye for detail. Anything that doesn’t make the grade is placed on a “deficiencies list” that the builder is responsible to remedy. That’s why you may see occasional construction activity in the first couple of years after infrastructure projects are done.

Project managers of infrastructure projects call this the warranty work phase – an opportunity to catch any issues so that they can be fixed while the infrastructure is still under warranty. It often takes all the seasons in a full year to see how things weather in our climate or perform once in use.

Much like when you buy a new house, it can take one or two years for the foundations to settle, and for you to make note of where the finishes are less than desirable. Then the contractor comes back to fix all the nail pops and cracks in the drywall, fill any gaps in the molding and repaint where necessary. It ensures that you are happy with the work, and you get the most out of your home. Warranty work is the same idea for our facilities, stations and rapidways.

On Davis Drive, we’re starting with the grinding and smoothing out of curbs, fixing paint finishes and filling small cracks, and of course taking note of anything else that needs work.

Whether you’re a regular transit rider, or are considering your first trip on the rapidway, know that we are working hard to provide you with a quality experience and infrastructure that’s built to last.

 

Categories
Construction

working in harmony with the weather

working in harmony with the weather

As Canadians, we tend to be a little bit obsessed with the weather, and no wonder. With such extreme fluctuations, our climate affects everything we do: our commutes, our weekend plans and our way of life. Watching the Weather Network is one of our national pastimes, right up there with hockey.

At vivaNext, our crews work in all kinds of weather to build a rapid transit system for York Region.

When the sun shines, crews push forward to get the job done. But when the forecast is for thunderstorms, extreme heat or cold, heavy rain or snow, our crew leaders have to assess the situation and decide whether or not to work. Then they make a call, for the safety of their people and the success of the project.

extreme heat

At this time of year, extreme heat poses a major weather hazard. Paving when it’s 35°C can be dangerous for the health of our crews, and plain miserable as well. However, a worker in a trench below ground may find it cool enough to work in extreme heat.

thunderstorms

Lightning and thunder are a no-go from a safety perspective. But as we all know, the weather report is a changeable beast. When the forecast is thunderstorms, contractors building vivaNext rapidways have to make tough decisions. They can bring their crews out and then find it’s too stormy to work. Or they can call off work for the day, only to find the storm never comes and a perfectly good working day is lost. The decision comes down to safety.

rain

Crews can pave in light rain for one or two days, but eventually wetness takes a toll. A tarp or cover can be used when pouring concrete in the rain, while waiting for it to cure. The safety of the men and women working on vivaNext projects is a top priority. Rain can make construction sites slippery, muddy and dangerous, and pose undue hazards.

underground weather

The weather underground is another factor. While it may be sunny and warm where we are, temperatures drop below ground.  Digging frozen ground can be a challenge and can damage equipment.

the bottom line

When our crew leaders decide not to work in bad weather, they’re thinking of the safety of the men and women they lead, and the success of the project.

Crews take advantage of Mother Nature by capitalizing on the good weather to drive vivaNext rapidway construction forward and we are happy to report we have had a great start to the construction season this year!

The result will be a transit network York Region will be proud to call its own, a legacy that keeps our communities moving forward into the future.