Categories
Rapidways Stations Urban Planning

Finding your way from here to there

vivaNext - rapid transit this wayFor those of you who enjoy video or computer games (or for those who are of “a certain age” but have kids who like gaming), you may be familiar with the variety of games that involve being lost in a maze…you know the ones. You need to figure out where you are and how to get to the end (complete the level!), before something bad happens or the clock runs out. Being lost in a confusing maze can be fun when it’s a game and you’re in a virtual world.

In the real world however, feeling confused and trying to figure out which way to go in a public space, whether you’re in a shopping mall, an airport, or a transit station, is a lot less fun. At the very least, you may waste a lot of time and effort. At the worst, you may miss your connection. Helping people to navigate easily around public spaces, and in a transit environment in particular, is a specialized form of urban design called wayfinding; it’s something we take very seriously in our planning for vivaNext projects.

Our wayfinding design work began quite some time ago, as part of the overall design work for the vivaNext rapidway stations. We have a diverse range of Viva riders – people of all ages, abilities and languages – so vivaNext wayfinding needs to go well beyond simple signage. Wayfinding systems can use a number of elements, from architectural space to maps to signage to graphics, to help people figure out how to get where they want to go, in a safe way. As we design our rapidway stations and station intersections, including the cross-walks and platform layout, we always consider how people will use the stations. We want to make it as easy as possible for people to know which station they’re at, where to buy tickets, and which platform they need to be on.

One of the best parts of the vivaNext plan is the impact our stations will have on making local neighbourhoods even more attractive, providing landscaped and welcoming public spaces. Wayfinding will play a role in linking the rapidway stations with their surroundings. Our design team is working on strategies to ensure each station provides information about local destinations and connections.

So if you’re looking for the thrill of being lost, you’ll have to stick to gaming. Our design work isn’t complete, but from what I’ve already seen, getting around on Viva via the rapidways will always be safe, easy and convenient.

Categories
Rapidways Stations

first new vivastation is coming together!

Metal framework being raised into place at one of our new vivastation platforms
Metal framework being raised into place at one of our new vivastation platforms

The first vivastation designed for our new system of rapidways is becoming a reality. The arched metal framework for our new vivastation platforms at the intersection of Warden Avenue and Enterprise Drive has now been raised into place, and glass canopies will be added over the next few weeks.

This vivastation will be put into service next year, replacing the current Viva shelters at this location. Passengers using Warden Station can look forward to a new level of comfort next winter, with an enclosed, heated, and LED-lit section and an arched glass roof to shelter them as they get on and off our vehicles.

The new vivastation is located at the western gateway to Markham Centre, where a vibrant mix of activities will be available on the streets and squares where people live, work, shop and play. The first phases of residential construction are already underway.

I look forward to seeing the new station in service, and if you use this station, I hope you’ll let us know what you think.

Categories
Announcements Rapidways Stations Subways

Dale’s summer update

Dale's Summer Update

Whew! What a busy few months we’ve had here at the vivaNext headquarters!  No doubt a lot of people have been enjoying this great summer weather and taking a bit of a break… but for those of us here, it’s been full steam ahead.  Since we announced the news this past May that Metrolinx approved a revised capital funding schedule for the vivaNext rapidways, our office has been a hive of activity! Okay, I took a week off as well to enjoy this summer weather.

But here’s an exclusive peek behind the scenes of what’s happening with vivaNext projects.

Although it’s not a typical rapidway station, our new stop currently under construction at Enterprise and Warden in Markham will be the first place you’ll be able to try out our new, comfortably designed vivastation.  The concrete foundations are currently being put in for the station, and sometime in early fall we expect to receive the glass canopy from the fabricators.  After all the work that went into designing it, we can’t wait to see the vivastation in person!  We’ll keep you updated on the delivery dates and let you know more about how you can see it too!

Our crews are out and about along Davis Drive in Newmarket, with most work presently focused on pre-construction activities in preparation for the road widening.  We’ve been taking down some existing buildings, and working closely with Habitat for Humanity York Region and other organizations to ensure that every last piece of building material that can be reused or recycled is diverted from landfill.  At least 85% of materials will be diverted – we are really proud of that. Even shrubs, plants and trees have been transplanted to new locations within Newmarket, including some churches and a public school.

Our engineers, architects and other experts are working hard on the preliminary engineering for the rapidways up Yonge Street and along Highway 7. Preliminary engineering is the early design stage of an infrastructure project, and it involves numerous hours of discussion and planning for options on things you may never think about when you drive down a street; things like median width, lightpole design and surface treatments.  Every step of their work is carried out in conjunction with a number of other partners, including The Regional Municipality of York and each of the municipalities, as well as other local groups. The amount of painstaking, detailed work that goes into designing a rapidway is just incredible – in a separate blog, I’ll tell you more about the processes, the challenges and introduce you to some of our experts.

We are also spending a lot of time working with our colleagues at the TTC on plans to connect the Spadina Subway extension to the vivaNext transit hub at Highway 7 in the Vaughan Metropolitan Centre.  Construction of a six-lane bridge, access roads, traffic signals, utility relocation and the realignment of a portion of Black Creek is now underway so that construction can start on the Highway 407 Station. This work is anticipated to be complete by spring 2011. Public open houses in July showcased the station design finishes and public artwork for the Sheppard West and Highway 407 Stations. More open houses will soon be held, so that the public can view the four remaining station designs. I hope to tell you more exciting details about the design ideas we’re working on in the near future.

Another key task that represents a huge amount of our efforts is the ongoing Environmental Assessment process – and rightly so: ensuring that our projects don’t negatively affect the environment, either natural or human, is a critical priority for this project.  Each rapidway segment has its own process and requirements – in fact, there’s so much to describe, I’m going to save it for another time!

During the summer we also participated in some fundraising events for United Way, attended several community events and participated in some local industry workshops.

So that was a brief summary of what we’ve been up to! We hope you’re enjoying the summer sunshine, and all of the great things there are to do in York Region!

Categories
Live-work-play Rapidways Urban Planning

Bringing the vivaNext vision for Markham into focus

An artist rendering of what the new Downtown Markham transit-pedestrian mall may look like.
An artist rendering of what the new Downtown Markham transit-pedestrian mall may look like.

Markham Centre is on the verge of becoming a world-class, mixed-use urban centre and a key destination place.

For example, construction on Downtown Markham is well underway and features the first transit-pedestrian mall in the GTA with businesses, residences, shops, restaurants, theatres and a 10-acre world-class park for people to enjoy without having to drive to get here.

Viva riders travelling along Highway 7 will be able to make seamless and convenient connections in Markham with GO Transit commuter rail and express buses, YRT local bus services, and the future 407 transitway. Bicycle racks will also be available at vivastations and on Viva vehicles for those who choose to cycle.

To view artist renderings of the vivaNext vision for Downtown Markham, click here or visit the Media Centre at vivaNext.com.

Have you visited a transit-pedestrian mall in another country? Tell us about your experience.

Categories
Rapidways Stations

How level boarding at our new vivastations will further enhance service efficiency

With level boarding, the vehicle will pull up to a raised platform. This greatly increases the time it takes for passengers to get on and off the vehicle making for a faster trip.
This is a rendering of a viva vehicle stopping at a new vivastation. With level boarding, the vehicle will pull up to a raised platform. This greatly decreases the time it takes for passengers to get on and off making for a faster trip.

Viva is already a highly efficient rapid transit service thanks to features such as our off-board fare collection system. It’s going to get even better. In addition to our new vivaNext rapidways – which will take our beautiful blue Viva vehicles out of mixed traffic and put them on dedicated centre lanes so they can safely speed past congested traffic – our new vivastations will feature level boarding.

What do I mean by level boarding? Simply that the platforms at our new vivastations will be raised so they are about the same height as the floor of our Viva vehicles. This, in turn, will speed up the boarding process by eliminating the need for riders to climb steps or lift objects, and for Viva drivers to lower ramps for easier accessibility.

Level boarding is already successfully used throughout the world by other BRT, LRT and subway systems to enhance service efficiency. It only made sense to make it a feature of our new vivastations so that we can get you where you want to go faster and easier, and like never before.

Can you think of other things that might make your rapid transit experience even better?

Categories
Rapidways Stations

Where do you think we should place the bicycle racks?

One possible location for the bike racks is on the platforms as you can see in this rendering.
One possible location for the bike racks is on the platforms, as you can see in this 3D model.

As part of the vivaNext plan, beautiful new vivastations will be built in the centre of the roadway along the rapidways on Davis Drive, Yonge Street and Highway 7, as well as the proposed LRT lines on Don Mills Road/Leslie Street and Jane Street in York Region. From the top down, these vivastations have been designed around you. Among their many features and benefits, they will include bicycle racks for quick and easy transit connections.

Right now, we’re examining where to place these bicycle racks and would like to hear your thoughts. There are basically three options to consider.

Option 1 – Place them right on the platforms. This would allow you to conveniently lock your bicycle up right at your point of departure and simply board the next Viva vehicle. On your return Viva trip, you’ll arrive at the same station, but on a different platform. To get your bicycle, all you’d have to do is go back to the original departure platform.

Option 2 – Place the bicycle racks on the sidewalks at the intersections adjacent to the vivastations.  This option would make it more convenient for you to shop, run errands and meet up with friends after your return Viva trip before picking-up your bicycle.

Option 3 – Distribute the bicycle racks evenly on both the platforms and the sidewalks.

So which option do you prefer? Please take a moment to let us know because here at vivaNext, we value your opinion – even when it comes to bicycle racks!

Categories
Going Green Rapidways Stations

Gimme Shelter

Rendering of a vivastation showing the middle section, which will be enclosed and heated.
Rendering of a vivastation showing the middle section, which will be enclosed and heated.

As you might have already heard, we are currently working on a video where the lead architect of the new vivastations talks about the design of the shelters for the rapidways we will be building over the next few years.

Since that video is not yet completed and there’s growing interest in how the vivastations will keep people protected from the weather, I wanted to take some time to talk about a few features of the new stations. In a way, here’s a trailer of the video…

There will be three different sections (modules) in each station. The middle section will be completely enclosed and heated, blocking the wind, rain, snow and cold temperatures.

Extensive consultation with the public told us that comfort and keeping warm are very important to riders, which is reflected in the design for the new service.

The stations will be large enough to provide adequate personal space and there’ll be an overhang reaching above the vehicles to protect people boarding and alighting on rainy days.

The stations are also more environmentally friendly. Energy efficient LED lights will brighten the station at night. The enclosed section will have automatic accessible doors at each end of the enclosure. They will still have sensors to open automatically, but as you can see in the picture, the hinged doors are on the side of the enclosed section. This will keep heat from escaping when someone triggers the sensor by walking along the platform. Accessibility has also been top of mind during the design process, ensuring that the platform and station design are accessible for individuals with disabilities.

Each platform will be 55 metres long with a 27-metre glass and steel canopy structure in the middle. This will make the stations easy to find and the curved canopy will blend well into the natural streetscape.

Last week, we had a full day of production, shooting interviews and b-roll for the video. Watch for the finished product on our website in the coming weeks.