Categories
Announcements General

happy new years from vivaNext

The New Year brings with it the wonderment and joy of new possibilities, resolutions and change. Civilizations around the world have been celebrating the start of each New Year for at least four millennia. Traditions have varied (and still do today), ranging from forgiving enemies to exchanging gifts, to wishing Happy New Year and making resolutions. Many of us have made resolutions over the years – committing to renew last year’s resolutions, adding a few new ones, and to keep them as long as we can.

Naturally, vivaNext is committed to keeping its resolutions, which include:

  • Continuing our progress on rapidways in Newmarket, Richmond Hill, Markham and Vaughan, and on the Spadina Subway extension as quickly as possible;
  • Creating beautiful urban spaces where people can live, work and play in close proximity to rapid transit, check out Highway 7 between Bayview and the 404 Highway to see the results; and
  • Staying engaged and available to the residents and businesses in our communities.

Have a safe and happy New Year.  We look forward to a productive and successful 2014!

Categories
Announcements General Uncategorized

changes in how you contact vivaNext

As of January 4, 2014, the extension numbers will be changing from four to five digits.

Don’t worry it’s not as cumbersome as it sounds, the only difference will be adding a “7” in front of all current four-digit extensions for all internal phone lines.  This change also applies to all York Region services identified below:

  • Court Services
  • Emergency Medical Services (in case of emergency, please dial 911)
  • Family and Children’s Services
  • Housing
  • Long-term Care
  • Economic Development
  • Police Services
  • Public Health
  • Regional roads
  • Social Assistance
  • Solid Waste Management
  • YRT/Viva
  • Water and sewage treatment

 

Categories
Construction General Rapidways

as the cold wind blows…

Seems like just yesterday vivaNext was ramping up construction activities at the first sign of warmer temperatures and while the warmer weather was here this year, a lot of progress was made along the vivaNext corridors. We captured our developments and put together a short video to share the progress of the transformation for each corridor.

Building on our successes, we will keep the progress moving even as we wind down for the return of Old Man Winter. Although the weather specialists forecast a cold winter season, our vivaNext construction projects will continue as the snow flies and the cold wind blows.  Here’s a snapshot of what we’re going to be working on this winter along the vivaNext corridors and how we’ll manage to keep construction moving along even when the temperatures plunge.

In Newmarket, crews will continue storm sewer installation, utility relocations and underground ductbank [gathers together and encases telecommunication wires] installation along Davis Drive. The south side of western creek culvert near Niagara Street will be also be widened over the next several months.

In Markham, utility relocations will continue on South Town Centre Boulevard, Cedarland Drive and Warden Avenue. Some construction work will also continue on Highway 7 East in the centre median.

Along the Vaughan Metropolitan Centre [VMC] corridor, hydro, gas and telecommunications installations and relocations will continue. Work will also begin on the CN Bridge. Preliminary construction activity also continues in Vaughan along Highway 7 West from Helen Street to Edgeley Boulevard and from east of Bowes Road to Yonge Street, including parts of Bathurst Street and Centre Street.

On Yonge Street, surveying, geotechnical testing and utility locates will take place in Richmond Hill and Newmarket. In early 2014, the design-build contract of the Yonge Street rapidway will be awarded. Once the contract is awarded, rapidway construction will begin.

While construction continues outside, inside our contractors are preparing for a busy spring. They are finalizing designs, plans and schedules for next year so when the warm weather returns construction crews can hit the ground running.

To see the progress we’re making over the winter, follow us on Twitter and Facebook. You can also sign up for email notices at vivanext.com to keep you updated on the construction underway in your area.

Categories
Announcements Fun & Games Uncategorized

happy holidays!

Happy holidays! Spending quality time with family shopping, skating or just hanging out, Viva will make it faster and easier to take part in all the holiday fun across York Region. To help you and your family get in the spirit, here’s a fun little game for you to enjoy.

Categories
Construction General Live-work-play

ol’ man winter is here… are you ready?

Yes, it’s that time of year again, winter arrives officially this weekend.  The weather reports are full of white stuff, and the frosty temperatures are here.  Now is the time to ensure you are extra vigilant and aware of your surroundings at intersections, crosswalks and in construction areas as you travel the roads in York Region.

Snow and ice wreak havoc on the traveling public, but disasters are largely preventable.  If poor weather is forecast, plan ahead and leave plenty of time to get to your destination.  Better yet, postpone unnecessary trips until the weather has improved. As always we encourage you to try transit in bad weather days, but if you are driving, keep your vehicle tuned up and be especially aware of your tire condition.  Snow tires are the best bet in the winter months, but regardless of tire type, be sure to check pressures and tread wear regularly.

The bottom line is that winter is a Canadian fact and we can’t change the weather.  All we can do is prepare for it and understand the inherent hazards.

Here are some safety tips to help navigate construction zones in the winter safely:

  • Obey the speed limit – You should be careful to obey the speed limit in construction zones, as many will be lower than normal.
  • Keep on the lookout for construction workers – One of the main reasons that construction zones can be so dangerous is that there are often people working on the side of the road. You will want to be very careful when you drive and try to be aware of any workers.
  • Watch for lane changes – Often in construction zones, the lanes move differently than normal. Especially at night, in bad weather, or when it is difficult to see, pay attention to where your lane goes.
  • Be especially careful if there is no shoulder – A lot of times, construction forces the closure of the shoulder.

Remember to always be aware of road conditions and those who are working in these zones. As you pass through the vivaNext projects, we know that our construction disrupts the life of pedestrians, transit riders and drivers, and we do everything we can to keep that to a minimum.

We hope that as you pass by our construction areas you’ll keep safety in mind!  Travel safe!

Categories
General Uncategorized

social and community responsibility

The holiday season is a time of year where our community calls on all of us to help out just a little bit more and think of those that are in need of some help.

Here at vivaNext, staff are proud to be actively involved with the York Region Children’s Aid Society holiday Heroes program.  The Holiday Heroes program helps by donating new toys, new clothing, new winter outerwear, toiletries, gift cards and food vouchers to the children and families served by the agency.

This year, we have joined together to personally sponsor a family of seven.  Over the past two weeks, staff has been collecting everything from toiletries, toys, educational materials, practical items for teens and tweens – things we sometimes take for granted but that can be luxuries to a youth on a tight budget.

This season there are so many charitable organizations and agencies that are in need of support, be it money, merchandise, food or time. Sometimes the goodwill of the holiday season brings about great things.

At this time of year we would like to call to mind all the volunteers who tirelessly give of themselves to make life that much brighter and happier for those within our communities.  Thank you!

 

Categories
General Uncategorized

tis the season to support your local businesses

It’s that time of year again, holiday decorations adorn windows and doors, festive music fills the air and it seems everyone’s in a rush to go somewhere.  With the holidays fast approaching, you may be feeling a little overwhelmed with what to get that special someone.  Don’t fret the businesses along the vivaNext corridors are here to help you find the perfect gift.

The shops and services on Highway 7 and Davis Drive will take the stress and worry out of your holiday shopping. Your local merchants will help you find that perfect treasure for those nearest and dearest and will help you cross everything off your holiday shopping list. While you’re out and about, take a break from shopping with a stop at one of your favourite restaurants. Why not hop aboard yrt/viva to get you to and from your destinations?

Once you’re done shopping and you’ve checked your list twice, pour a glass of eggnog and congratulate yourself on a job well done!  You got all your shopping done with a little help from your local businesses.

Support your local businesses this holiday season. Your neighbours look forward to seeing you!

 

    [poll id=”45″]

 

Categories
Construction General Uncategorized

getting ready for winter

If you have a property with a garden, you’ll be familiar with the list of things you do every year to get things tidy and safe before it freezes up out there. We face the same kind of to-do list along our construction zones on Highway 7 and Davis Drive, although the key difference is we’ll still be actively working throughout the winter (I’ll tell you more about what we’ve got planned for the winter months in an upcoming post).

But in terms of getting things all tidied up, here’s what you’ll see us doing over the next couple of weeks to get ready for the snow and ice.

Our top priority, as always, is making the construction zones as safe as possible for pedestrians and drivers.  For that reason much of our pre-winter activity involves ensuring that sidewalks and boulevards are free of hazards, and hazards that cannot be removed are carefully fenced off.  In some cases we’re finishing the grading and construction of some boulevards, and in others installing temporary walkways and ramps where work isn’t scheduled to be finished until next year.

Snow fences are being installed behind sidewalks in areas where work is continuing, to help mark the safe route for pedestrians.  And because of ongoing roadwork and other activities, some sidewalks will remain closed.  We’ll make sure there’s a clear route for pedestrians through work zones, although it may require crossing from one side of the street to the other. Look for directional signage to know where it’s safe to walk, and how to access bus stops – for your own safety it’s critical that pedestrians stay out of work zones.

During construction, road and sidewalk maintenance is the responsibility of the construction contractor within the project areas.  But during the winter, the Region and local municipalities are responsible for ensuring the roads and sidewalks are kept clear. For that reason, another top priority before winter is to ensure every aspect of the construction zones is compatible with the requirements for winter maintenance operations.

This means making sure the snow-clearing equipment can manoeuver through the construction zones, boulevards and platforms.  Our design work and construction staging plans have always had those requirements top of mind, but we walk through the sites with Regional and municipal staff again before winter to identify any little details that might impede their operations.

And to keep traffic moving throughout the winter, we’ll be taking steps to make travel lanes as straight as possible through the construction zones, and ensure markings are clear.

Just like at your home, we like to get everything tidied up and in order before winter, so we’re going to keep working steadily at it until we’re forced to stop by severe winter weather.  Once that happens, we have a long list of other activities we will continue with, so stay tuned.

 

Categories
General Uncategorized

wouldn’t you like an extra 32 minutes a day?

Did you know that a recent American study showed that people, who live in areas with good access to transit, are more satisfied with their quality of life than people who don’t have easy access to transit?* This is one of the reasons cited by an intriguing new public awareness campaign, arguing that more and better access to transit is good for communities, families and individuals.

The new campaign – dubbed Your32 – is an initiative spearheaded by the Greater Toronto CivicAction Alliance, a not-for-profit advocacy organization that promotes the economic, social, and environmental benefits of building transit infrastructure across the Greater Toronto and Hamilton Area.  The campaign is being done in partnership with a wide range of leaders representing key sectors across our communities and economy, including business, academia, labour and financial.

The big-picture benefits of transit are well known: it’s better for the environment; it will reduce the gridlock that’s choking our roads; and it will help our economy and productivity.  All of which are reason enough that we need more transit in the GTHA, and we need it now.

But ultimately we all live our lives at a personal level, and this is what the Your32 Campaign does that’s so interesting: it brings the benefits closer to home for each of us.  Your32 refers to the estimated 32 minutes per day that people would save on their commute once the Metrolinx transit plan for the GTHA (The Big Move) is fully funded and built.  32 minutes is the difference between the projected future average commute time if no comprehensive transit system is built, and the average future commute time with the big move.

32 minutes a day: that’s a lot of time over the course of a year – 8 full days – that you could be doing something better with.  And over the course of your life it adds up to about two years of found time.   There are a lot of ways most of us could imagine spending 2 extra years, beyond spending it sitting in gridlock.

The Your32 website has a lot of really interesting facts and figures about commuting and how better transit will benefit all of us, and its aim is to encourage people to become more knowledgeable about the issues and possible solutions.  The campaign is asking people to “pledge” their support for new funding sources that are “dedicated, efficient, transparent & accountable, regional, fair, and sustainable”.  And ultimately, its objective is to continue to build support from people and governments at all levels for more funding for transit in the GTHA.

We’re proud that vivaNext and York Region are already helping lead the move for more transit, and we’re pleased that such a useful campaign is underway to help reach more people and get out the true facts about transit.  I recommend this initiative to anyone interested in learning more, and to add their voice calling for senior levels of government to fund the transit we all need.

 

Categories
General Rapidways

viva rapid transit vehicles – providing comfort and style

With the opening of the new rapidway on Highway 7 from Bayview Avenue to Highway 404, vivaNext has not only created placemaking structures but has transformed the way public transit is viewed.  The shelters are sleek and beautiful; the roadways are open and faster but most impressive are the buses that travel along these routes.

Nova Bus, based in Quebec, custom made and delivered twenty seven new vehicles in 2013 bringing the viva fleet to 123 vehicles; 40 foot vehicles and 63 foot vehicles.

York Region Rapid Transit (YRRTC) first procured viva vehicles in 2004 through an international request for proposals.  At that time the North American market did not manufacture any new, environmentally, comfortable buses and the contract was awarded to VanHool in Belgium.  In 2009 YRRTC once again put out a request for proposal for new vehicles and we were thrilled to have competitive submissions from North American companies.  After a rigorous process the contract was awarded to Nova Bus to manufacture the new vehicles maintaining the existing look and feel of the viva feet and all the comforts and benefits its customers have come to love.

The new Nova vehicles seat 56 passengers, plus the driver and have 2 mobility device stations, plus standing room.  Large platforms are located at both the front and back door for quick and convenient boarding.  A 32 inch wide electric ramp and a “kneeling/lift” floor system provides roll-on, roll-off access for those in mobility devices or pushing strollers.  This feature combined with the new near level boarding stations makes viva a full accessible transit system.  The new Nova has the accessibility ramp located at the front of the bus so that the driver can quickly activate and assist anyone requiring this feature.

All of the viva fleet comes with green light sensor systems which allow the GPS system to track their movements and allow central dispatch to update arrival times on the variable message boards at each station along the route.  This “smart technology” also has the ability to hold green lights or advance red lights at intersections if the vehicle is running behind schedule.

One of the great features of the viva rapid transit services is the soft, smooth ride which is provided by the state of the art-ride suspension on the vehicles.  The rear mounted engine allows for a quieter ride and helps keeps bumps to a minimum.

Canadians should be proud that our country is able to design, manufacture and deliver such quality transit vehicles and our customers are certainly appreciative of all the comforts they provide to their commute!