working hand-in-hand

working hand-in-hand

Sometimes the best way to get through big, complex tasks is to split the workload – divide and conquer. This is especially true with York Region’s transit network, so we work alongside the Transportation Services Department.

With strategic plans in place, the Transportation Services Department plans the overall transportation network, including roads, transit and cycling. They create a Transportation Master Plan, which takes into account many factors, including ideas from residents, population growth and other statistics, provincial mandates like Places to Grow, and environmental protection measures like the Greenbelt and Oak Ridges Moraine. They also build and maintain roads, and through YRT/Viva, operate conventional YRT transit, Mobility Plus and Viva rapid transit.

At vivaNext [York Region Rapid Transit Corporation], we put the rapid transit part of the Transportation Master Plan in place. We work with all levels of government to acquire funding for each new project, whether it’s Bus Rapid Transit rapidways, subways, or transit facilities. We design and build these projects – including details like station locations and designs, sidewalks and lighting.

As the project manager, we set timelines and manage construction contracts. The rapidways are major infrastructure projects requiring careful scheduling and seamless handovers when each project goes into service. At this end point, the operations are handed over to YRT/Viva, and the maintenance is done by either York Region or the local municipality, depending on who owns the road.

At vivaNext we have some projects in place already, more scheduled for the next four years, and a few projects yet to be funded. Along with York Region’s growing population, there’s a growing need for transit. So there’s a lot to do, and we’re working hand-in-hand to get everything done.

If you’re looking for a few videos, you can get a glimpse of the transformation of York Region, see what York Region’s Transportation Services does, or just catch a little excitement.

 

Categories
General

private time on public transit

private time on public transit

The Toronto Star recently ran a piece on how the TTC has become an extension of “home” for its users. While he remarked that some people do things not normally considered polite for public spaces, Urban Affairs writer Christopher Hume also noted that even with less privacy, riders have more freedom.

“Even in a moving subway,” he wrote, “it’s easier to put on lipstick than it is driving on Highway 401. It’s also easier to eat, drink, read and tend to one’s appearance.”

People who use transit regularly use the time in a variety of ways that are either impossible or risky when driving a car. They read books, work on laptops, watch TV, talk to other riders, snooze – and yes, put on makeup or simply stare into space at the end of a busy day.

They don’t worry about being cut off in traffic or being stuck behind a sander during a snowstorm. Parking and finding a gas station are also non-issues, and riders save thousands of dollars a year in car depreciation, gas and insurance. And let’s not forget that they also get tax credits for transit passes like the Viva Monthly Pass.

If you trade your car keys for a transit seat, you might just find yourself with time on your hands!

 

Categories
Community Events

time for some family fun…

time for some family fun...

York Region’s Public Works and Emergency Medical Services [EMS] departments are hosting a Family Fun Day this weekend, and we’ll be there too to help recognize the importance of these services, and to have some fun!

We hope you can drop by our booth while you’re there, and be sure you take part in some of the activities, including:

  • Give transit a try and ride Viva through the bus wash facility in Newmarket [we especially recommend this activity!]
  • Tour the facilities at 80 and 90 Bales Drive, and see interesting equipment and vehicles
  • Watch or take part in the bike rodeo and bike helmet demonstrations
  • Food and refreshments at a charity BBQ [11:30 – 2pm]
  • Free garden mulch with a donation, and contests and prizes
  • Meet Pylon Pete, Barkley the Tree and Parry the Paramedic

So let’s enjoy the nice weather, spend quality time with family, and come see some of York Region’s services. We’ll see you there!

For detailed information about York Region’s Family Fun Day, visit York.ca.

 

Categories
General

as days get longer…

as days get longer

Days are getting longer, but for the next month or so we’re still travelling to and fro close to dawn and dusk, and right now there are snowbanks at every turn. So visibility isn’t great, but spring is on the way! Things are looking up, and it’s important that both drivers and pedestrians look up to see who’s on the other side of that snowbank, and to see that it’s safe to move forward. Let’s stay in step with those around us by keeping an eye out for one other and being as visible as possible.

On Highway 7 East in Markham and Richmond Hill, commuters might have more of a spring in their step, and it’s not just because they’re looking forward to better weather. Now that the rapidway is open, Highway 7 has many years of fast, convenient transit ahead, not to mention bike lanes and nice wide sidewalks. In some sections of Highway 7 it was truly a highway before construction with only traffic lanes and no sidewalks or bike lanes. Now, everyone has a choice in how they connect from A to B, and that’s something to look forward to.

To better weather, to more choices, and to safe travels throughout York Region!

For some tips on getting around on Viva, check out YRT/Viva’s video about dressing with safety in mind.

 

Categories
Rapidways Stations

rapidways in winter

rapidways in winter - Town Centre Station on Highway 7 East

It’s definitely winter! Nobody knows that better than outdoor maintenance crews. When there is snow and ice, York Region’s crews are on duty on our new Highway 7 East rapidway, clearing the way for rapid transit. In Markham, the rapidway travels down South Town Centre Boulevard and Cedarland Drive. The glass canopies at vivastations shelter Viva customers from light flurries, but when heavy snow or ice make an appearance, the heated enclosure is where you want to be.  To remove the snow at the stations, a contractor from YRT/Viva operations shovels and salts the vivastation platforms so that they’re safe for everyone. Sidewalks are usually a municipal responsibility, so the new sidewalks along the Highway 7 West rapidway are cleared by the City of Markham and Town of Richmond Hill.

.
Before the rapidway was built on Highway 7 East, sidewalks were few and far between, and there were smaller curb-side Viva stops. The street has now been transformed from a suburban freeway to a walkable urban street and transit route [with bike lanes!]. With the new facelift complete there are benefits for everyone and the same treatment is coming next year on Davis Drive!  Think spring!

Categories
General

design it, then build it – simple, right?

design it, then build it - simple, right?

You probably know where we’re going with this. It’s not simple to design and build a major transportation project, but we’re getting better and better at it.

It starts with a consistent vision of a transit system that matches plans for the future by the Province and the Region. A plan for making the vision a reality comes next, as dedicated lanes for Bus Rapid Transit – rapidways – connecting York Region’s key urban centres. It’s more than transit though, with designs including updated infrastructure and pedestrian-friendly, attractive surroundings. The 34 kilometres of rapidway and 37 vivastations are divided into design-build projects, based on funding and logistics. Closing roads entirely isn’t an option, so construction timelines are longer to allow for keeping lanes open as much as possible, and projects are staggered so that there isn’t too much work being done, all at once.

We select a contractor through a competitive bidding process. This is an important point in the project, because what is or isn’t included in the contract can impact the timing or costs of a project at a later point. We have highly-skilled engineering, construction and procurement professionals whose advice ensures we procure the project accurately and fairly. Even so, there are an enormous amount of details to consider, and every aspect needs careful thought. The procurement of each project has been tailored to its particular circumstances, and has improved on the project before it.

For the first rapidway project, Highway 7 East, the utility work and the design-build of the project were each coordinated by a separate contractor at the same time. The intention was for a quick build, but it was a challenge for two separate contractors to schedule intertwined work in the same locations.

For the next two projects, Davis Drive and Highway 7 West [Interchange Way to Bowes Road], the same contractor coordinated the utility work and built the project. This helped the contractor to schedule the work, although there were still unexpected elements underground to deal with, as is the case with most construction projects. The contract for the latter project, Highway 7 West, also included more requirements for utility coordination and recognition of timelines needed for permits and relocating utilities.

We recently procured the contractor for the rapidway on Yonge Street, and even more was done to ensure the project runs smoothly. A Subsurface Utility Engineering [SUE] study was fully completed before we even issued the RFP, and the results of the study gave bidders a better understanding of the existing infrastructure, preparing them for the utility work included in the contract. As with the Highway 7 West contract, timelines allowed for permits and utility relocation, and in this case they were fully scheduled. A requirement was also added for an Independent Quality Certifier [IQC] to make it easier to monitor and audit quality of work – previously this was a combined effort.

So building it isn’t simple, but each project has helped improve the next, and we’ve already built and put into service 11 vivastations and 6 kilometres of rapidway. Each project has unique features and challenges, but the end results are worth it… we hope you have tried the improved service on Highway 7 East, as Viva now travels in its own dedicated lane!

 

Categories
Rapidways

next is now >> highway 7 in markham

next is now >> highway 7 in markham

We’re growing right along with you as we enjoy the next section of the rapidway, now open along Highway 7 from Highway 404 to Town Centre Boulevard.

Riders can now board Viva in the centre-lane rapidway, and vivastations are directly accessible from crosswalks at traffic lights. Not only is this section of Highway 7 now more efficient for pedestrians, cyclists, riders and drivers, but the landscape is being transformed with new trees and other greenery. Vivastations are in service at Allstate Parkway, Woodbine Avenue, Montgomery Court, and Town Centre Boulevard. New dedicated centre lanes for Viva allow riders to enjoy faster and more consistent travel times through this congested area. Our customers are telling us “@YRTViva Love how fast the bus is on the new extended rapidway. Got to the mall really quick!”

Markham is one of the fastest growing municipalities in Ontario, home to over 332,000 people, covering 212 square kilometres of land. More than 400 companies are headquartered in Markham due to a well-defined transportation and communication network, high quality facilities, a diverse and highly educated labour force and pro-business environment. The vivaNext transformation of this urban corridor will help support growth, and reduce congestion to help make Markham, and the rest of York Region, a more inviting place to live, commute, shop and play.

For Highway 7 East, the future of rapid transit is here – next is now. Students are settled into school already, so here’s a [fun] lesson on history – watch our then, now & next transformation video of Markham and be sure to get out and experience the new rapidways this fall!

 

Categories
Construction Rapidways

who, what, where, why, when and how …..the 6ws of davis construction

click here for the video Davis Drive: building more than transit

With Davis Drive rapidway construction well underway, signs of the transformation can be seen along Davis from Yonge Street to Roxborough Road. It takes a lot to build a centre-lane bus rapidway and completely rebuild Davis from the ground up. This challenging project has layers upon layers of complexity and a lot of work underground had to take place first. Check out our latest video about how all these layers add up to a project that’s building more than transit.

A lot of questions can come from a project of this nature, and here at vivaNext we’re always happy to answer them. We thought it might be helpful to break down this complicated project into smaller pieces [like a story with chapters, if you will] to provide a clearer view of how we’re transforming Davis.

Over the coming weeks, we’ll be using Twitter and Facebook to provide a unique behind-the-scenes perspective of the magnitude of work that’s been done under and above ground, the progress we’ve made, what’s to come and of course the end result! We will even toss in a few intriguing facts about Davis Drive and the Town of Newmarket that you may not have known.

What’s a story without pictures? As part of the story, we’ll provide visuals and use pictures to help showcase what’s going on in particular photos. We hope you agree with the adage “a picture is worth a thousand words.”

If you have a question you would like answered as part of our photo series, please contact us through contactus@vivanext.com, send us a tweet or a Facebook message.

We hope you enjoy the story and that at the end of the last chapter, you see that the investment in modernizing our corridor, adding a rapid transit service and revitalizing the infrastructure, will go a long way to making sure Davis is built on a solid foundation that will serve the growing needs of Newmarket for many years to come

 

Categories
Rapidways

yonge street rapidway – a key connection

video: Yonge St rapidway is on the way

Check out the newest vivaNext video featuring the Yonge Street rapidway project! This rapidway is a key part of York Region’s transit network, and will connect with the Richmond Hill Centre/Langstaff Urban Gateway at Highway 7 – a key Regional Centre with a variety of transit services and transportation options.

Now that the contract has been awarded to RapidLINK, our next step will be to work closely with the contractor to finalize the design of the rapidway on Yonge Street and develop a construction schedule. Over the summer and through the fall and winter months, crews continue working along the Yonge Street corridor to prepare for construction.

During this pre-construction phase, these teams will more accurately document existing conditions above and below the ground. This work is mainly conducted during off-peak driving hours and sometimes requires lane closures.

Building a roadway is a process that follows clearly defined steps and uses modern technology, equipment and materials. Although we have access to some of the best, most experienced construction contractors, building the rapidway down the middle of some of the Region’s busiest roads is a complicated undertaking. That said, we have an experienced team of dedicated staff and constructors who are on board and up for the challenge.

During construction, we realize that it’s important to minimize the impact on businesses and people using the road by keeping travel lanes open whenever possible and safe to do so. For more information on the project and construction information, visit vivanext.com/yonge-street-richmond-hill.

 

Categories
Construction

this is just the beginning

this is just the beginning

Over the next three years, the vivaNext system is really going to transform the look and feel of York Region’s Centres and Corridors, with new rapidways opening for service. And these new transit options are only the beginning of an expanding vivaNext network that’s being built for York Region commuters.

Here’s the rundown on what’s planned, and how your transit choices are going to be widened over the next few years as vivaNext continues to expand.

Rapidway projects are being built in the order that will create the most connectivity for the greatest number of people and get you past the worst traffic congestion. Check out the map to see how the phases are rolling out, and follow our colour-coding of projects:

The segments on Highway 7 East that are coloured green or orange are either in service or about to be. Construction is well underway along the yellow and purple segments on Davis Drive in Newmarket, and Highway 7 West in Vaughan. Davis Drive is scheduled to be in service by the end of 2015, and only a year later, Vaughan will have its first rapidway to meet up with the Toronto-York Spadina Subway Extension.

The design-build contract has been awarded for the pink segments on Yonge Street and designs are being finalized as crews begin preliminary work. In Newmarket, work requiring Yonge Street lane closures has been postponed until next year.

But that’s not all – look at the blue segments on the map. These segments are also all designed and funding is committed, with planning well underway for construction to start in 2015. The projects marked in blue include two rapidway segments on Highway 7 West, which will extend on either side of the VMC rapidway. When it’s complete in 2018 this whole section will run over 15 km from Pine Valley to Yonge Street. Another blue segment will extend the Highway 7 East rapidway in Markham from the existing Warden Station on Enterprise Boulevard, to Unionville GO Station.

Other projects that will eventually create a full network across the Region and connecting to other transit systems are grey on the map. Since we don’t have funding secured for all of them yet, we can’t confirm the actual timing.

Of these unfunded segments, two are the top priority. The first priority is the Yonge North Subway Extension, which will provide a critical link for passengers transferring between the vivaNext system and the TTC. Without this connection, vivaNext is missing a critical link that will really make our system a key part of the larger Greater Toronto transit network.

Another future route proposed is a rapidway along Major Mackenzie Drive, which would provide a major transit artery for all the growth taking place in that area. The Major Mackenzie rapidway would provide passengers with connections to the TYSSE, GO lines in both the east and west, and the Viva Highway 7 rapidway in both the east and west.

Imagine how this wonderful rapid transit network would make your life easier? We are working hard to bring it to life, so that everyone in York Region will have the choice to leave their car at home and hop on board Viva for a fast, reliable and comfortable ride, no matter where they want to go.