Categories
Commissioning

accessible stations >> everyone is welcome

accessible stations >> everyone is welcome

With the Davis Drive rapidway opening for service soon, we want everyone to feel welcome, and to find it an easy, convenient experience. Whether they have mobility issues or other physical limitations, are pushing a baby stroller, bringing their bike, or pulling a shopping buggy, we want everyone to feel that this transit service is for them.

We consulted with the CNIB and York Region’s Accessibility Committee during the design process, so our vivastations meet local and Provincial accessibility requirements. We also took into consideration our aging population, who appreciate being able to get around easily without a car. So we designed stations for everyone to use, and included these features:

  • Heated, enclosed areas in the centre of the vivastation with doors on each end and a wheelchair-turning radius inside. Radiant heaters are temperature and motion-activated.
  • Benches in the heated enclosure and outside under the glass canopy. Benches are wood, which doesn’t get as cold as metal in the winter, and they have grab bars for those who would like a little support getting up and down.
  • Fare payment machines that are easy to use, with screens that are angled for people of different heights, and have clear, bright graphics and large buttons.
  • Informative digital screens [Variable Message Sign or VMS] installed overhead in the centre of each canopy showing when the next bus will arrive, and arrival times are ‘real-time’ which means they’re updated constantly, based on the location of each bus.
  • Even platforms without trip hazards or changes to grade, and handrails and shallow inclines on the pedestrian ramps approaching platforms.
  • Tactile surfaces on station platforms, including textured tiles in a contrasting colour at the platform edge and directional tiles where the bus stops – helpful for those with impaired vision.
  • Public Address system that can be heard clearly from one end of the station to the other.
  • Illuminated map boards to make it easy for everyone to plan their route.

Vivastations are designed for all transit riders – including those who just haven’t used Viva before. Since this is the first east-west Viva route in Newmarket, it might be unfamiliar to some, but rest assured that it will be easy and comfortable to get onboard Viva on Davis Drive. In the first few weeks, Viva staff will be there in person to answer questions, and after that the YRT.ca website and their call centre [toll free: 1-866-668-3978] will help everyone make their connections. From one end of Newmarket to the other, and to other transit like Viva, YRT and GO Transit – it’s about connections, made with comfort and convenience.

 

Categories
Commissioning

Davis Drive happenings

Davis Drive happenings

With fall winding down and the imminent opening of the rapidway, it’s a good time to reflect on some of the activities that have taken place in Newmarket during the year. Not surprisingly, Newmarket residents have played a big part, participating in the events held on Davis Drive.

construction walking tours

This summer, we had a series of walking tours hosted by your Community Liaison team. We had great weather and attendance at each session, with people coming from far and wide to learn more about the intent of the project and the progress we had made, and to enjoy a $10 voucher for a local restaurant on Davis.

Tour participants learned about the features of the rapidway, some of the changes that drivers, transit riders and pedestrians will see. They also were given an introduction to York Region’s vision and growth strategy for Davis Drive.

#mydavisdrive selfie contest

Another great initiative was our #mydavisdrive selfie contest. Business support is a big part of the rapidway project, as we know that long-term construction can be disruptive for business owners. To encourage people to rekindle their love of shopping and dining on Davis, with the help of the Town of Newmarket and Chamber of Commerce, we put together a fun and easy contest to enter and win!

Over the span of five weeks, we had almost 200 entries from people who chose to stop, shop and dine on Davis Drive, supporting the businesses that are the life of the community. With random draws, we gave away five weekly $100 prizes and three grand prizes of $500, $750 and $1,000 Davis Drive shopping sprees.

Thank you to everyone who took part in the tours and the contest for supporting Davis Drive through one of the busiest construction seasons in Newmarket.  Your patience and support has been much appreciated and we look forward to the end of construction season. See you on the rapidway this winter!

 

Categories
Commissioning

destination: Davis Drive

destination: Davis Drive

In Newmarket, Davis Drive and Yonge Street are where many will choose to work, live, commute, shop and dine in the future. To set the stage for this, the new sidewalks along the Davis Drive rapidway have been built to be visually appealing and welcoming, as well as functional. Tree-lined sidewalks with attractive landscaping are part of the new streetscape design being built in York Region. Streetscape sets the appearance and ‘feel’ or character of a street, and this is connected to the overall experience. It also creates a distinct sense of place, identifying the area as a welcoming destination.

The new pedestrian spaces feel wide and separated from the traffic, and are separated into three zones: pedestrian zone, furnishing zone and transition zone. The pedestrian zone is paved with light-coloured pavers near intersections, and coloured accent bands – red for east-west and dark grey for north-south. The paving patterns stay consistent across driveways to remind drivers that pedestrians have the right of way.

The furnishing zone is where all the tree and shrub planters are located, and is paved in light coloured pavers. The transition zone is smaller, running between the planters and the road, acting as an extra buffer from traffic, and a place for snow storage in winter. This zone uses “eco-pavers” that allow water to seep through to the storm sewer system.

We’ve taken special measures to ensure Davis Drive is safe and welcoming to everyone, and the new streetscape will help make it a vibrant and memorable place, where people want to gather.

 

Categories
Commissioning Rapidways Safety Stations Uncategorized

vivastations >> built for comfort and safety

vivastation safety and comfort

We’ve taken every possible step to make the vivastations on the new Davis Drive rapidway feel like a safe haven, especially considering the stations are located in the middle of a busy roadway.

While you wait for transit, you can take comfort in the fact that you are well protected from the elements and adjacent traffic, and able to get help easily if you need it.

safety starts with design

The new vivastations include a variety of safety features, and are designed with transparency and good lighting in mind – two key principles of CPTED [Crime Prevention Through Environmental Design]. Stations have a concrete barrier wall along the traffic side, and a steel and glass guardrail beyond the glass canopy. The glass is impact-resistant with an interior film that prevents shattering [similar to a windshield] and provides UV sun protection.

call buttons are crucial

In the case of an emergency, an Emergency Call Button is clearly marked inside the glass enclosure. Its speaker provides immediate two-way contact between the caller and YRT operators. Call audio is recorded and time-stamped, as is the video automatically captured by the closest of three security cameras when the button is pushed. When the button is pushed, blue strobe lights on the Variable Message Sign [VMS] and the button are triggered to indicate to passing emergency services that assistance is needed, and transit staff will dispatch emergency services if needed.

safety is personal too

As much as we’ve designed vivastations to be safe, safety is also in the hands of those driving and walking on Davis Drive. While many drivers are now accustomed to making U-turns, but for others, it’s new. Drivers and pedestrians should both stay alert, and keep an eye out for one another, especially in intersections – and especially in fall and winter when daylight is in short supply.

two-stage crossings have rest spots

Because intersections were widened, a two-stage crossing at crosswalks is recommended for pedestrians. There are waiting areas in the middle of the crosswalk, where pedestrians can press the “walk” button and wait for the next signal.

Safety features are one of those things that are only top of mind when they’re needed. We hope that you always keep them in mind. That way you can rest assured that your rapidway trip will be a safe haven.

Categories
Commissioning

bringing a rapid transit plan to life

bringing a rapid transit plan to life

Crews are finishing up paving on Davis Drive, which means we’re getting closer to opening the rapidway. As much as we’re looking forward to celebrating this milestone, it’s important to know that this is only one [very exciting] step in a plan for a connected transit system.

Over the past few years there’s been a lot of media coverage of transit needs across the Greater Toronto and Hamilton Area [GTHA]. We’re proud that York Region is actively working to meet those needs by bringing rapid transit to our region. In 2002, the Region produced the York Region Transportation Master Plan and the follow-up Rapid Transit Plan, committing the Region to a blueprint of multiple transportation initiatives to be built over the next 30 years.

With the Rapid Transit Plan approved, we got to work. In 2005 the Viva team launched “QuickStart,” the first phase of Viva service, offering enhanced features that made transit more comfortable and convenient, and put the customer first. With this service upgrade, Viva changed the way people in York Region thought of transit. The public appreciated the enhanced features and frequencies, and it wasn’t long before ridership began increasing steadily.

But while “QuickStart” was a major success and an important first step in encouraging people to try transit, designing the vivaNext rapid transit system was the Region’s long-term vision. Ontario municipalities are mandated to plan sustainable, more intensive land-use as part of the provincial government policy, and rapid transit is a key component in achieving that goal.  Anticipating this, the York Region Transportation Master Plan directed that future growth in York Region would be concentrated in new downtown urban centres in Markham, Newmarket, Richmond Hill and Vaughan. By building more intensively in these areas there would be less pressure for growth in other neighbourhoods.

The urban centres would be connected by transportation “corridors,” making it easier for people to get around the region, and providing transportation options with regular transit service. The vivaNext rapidways are currently being built along these corridors, creating connections across York Region and into the rest of the GTHA.

Much of the new development around vivastations is compact and mixed-use, providing housing, employment, retail, dining, services and recreation – all within walking distance of transit. Developments include welcoming public spaces, attractive landscaping and other amenities that contribute to the centres becoming dynamic destinations.

Our vision for the future is well on its way to becoming reality: a rapidway has been built on Highway 7 East; Davis Drive is opening soon; the first section of rapidway in Vaughan will open on Highway 7 West in 2016; the Toronto-York Spadina Subway Extension is under construction; utility work is underway for the Yonge Street rapidway north of Highway 7, and design work continues for the planned Yonge Subway Extension.

So when the rapidway on Davis Drive opens for service this winter, we can celebrate the progress of transit infrastructure in York Region, not to mention the end of major construction!

 

Categories
Commissioning

signs of progress: staff and operator training has begun

signs of progress: staff and operator training has begun

We’re really counting down the days to the opening of the vivaNext rapidway service on Davis Drive from Yonge Street to Roxborough, and we bet you are too! You’ll know we’re in the final stages of construction once you see Viva buses out on the new rapidway.

Starting today, we will be doing systems testing on the new Davis Drive rapidway, in the Town of Newmarket, followed by driver training in November.

Training will be provided not only for Viva bus operators, but also for everyone who will need to be familiar with the rapidways, the stations and the equipment. Viva vehicles will be out on Davis Drive, taking customer service staff and other YRT/Viva staff along the rapidways to test and familiarize them with the new setup. Regular YRT transit service will continue to pick up passengers at curbside stops until testing and training is completed, and paving is fully finished. Signs directing passengers will be posted at the curbside stops.

Operator training will run from 7am to as late as 9pm on some nights, seven days per week.  During this time you can expect to see Viva buses driving up and down the rapidway, stopping at the vivastations. The training will focus on entering and exiting the rapidway, with an emphasis on safely merging back into mixed traffic past Yonge Street and Roxborough.

Operator training will also focus on the new transit signals at intersections, which will display a single green arrow for Viva buses. This signal will be clearly marked as transit only, but Viva operators will be trained to be cautious and on the lookout to make sure members of the driving public are following the signals correctly and not turning into the rapidway lanes.

The trainees are all experienced Viva operators, so they know the route and the vehicle. They’re really excited to get going!

 

Categories
Announcements

bragging rights

bragging rights

Well. We hate to brag, but we think those in the Highway 7 area would like to know – Roads and Bridges magazine has included the Highway 7 East rapidway project as #2 in their “Top 10 Roads” list for 2015.

The Highway 7 East project was recognized as a multi-modal “complete street” throughway, with the trade magazine noting the transit operations technology, the red-pigmented pavement, bike lanes and sidewalk landscaping.

Our office is located along the Highway 7 East rapidway, so we have to agree that the rapidway project has transformed Highway 7. West of Warden, the street has changed from being a highway with gravel shoulders, to being an attractive and safe place to walk, cycle, drive or ride Viva. The project included updated utilities, and has helped set the stage for the new developments along this important road.

Roads and Bridges voted the Highway 7 East rapidway project the second-best project in North America, and although it will always be number one in our books, we’re pleased to see it recognized by others in the industry.

 

Categories
Construction

final paving on Davis Drive is underway!

final paving on Davis Drive is underway!

Final paving is here! This week you’ll start to see the distinctive red asphalt on the rapidway and intersections along the Davis Drive corridor in Newmarket. It’s exciting because final paving means that underground utilities and infrastructure work is complete, the road has been widened to accommodate the centre lane rapidway and the medians and curbs are in place. All these elements help define a new urban destination for Newmarket. This is a significant milestone in the transformation of Davis Drive.

If you travel along Davis on a regular basis, you’re already aware of the fundamental changes that have been made to the way people drive, walk and ride on the corridor. New intersections allow for protected left-turns and u-turns, and feature optional two-stage pedestrian crossings, and accessibility features like audible chirps to aid people who are visually impaired. For the eco-conscious, the greenery planned for Davis Drive and the connections to paths like the Tom Taylor Trail will make the sidewalks and boulevards inviting spaces for all.

It’s not just Davis that’s getting a shiny new coat, the side streets that connect to Davis will be paved at the intersections so that they tie-in nicely with the new road.

Even after years of planning, design and construction, the rapidway just feels more tangible and real when we apply our distinct red asphalt to the road. There’s something special about knowing that you’re contributing to the future growth and prosperity of entire neighbourhoods, towns and regions by connecting people to the places they work, shop and play.

We are already seeing the benefits of improved traffic flow and travel times along Highway 7 in Richmond Hill and Markham, and the YRT/Viva network continues to grow.

To get there is a messy process, there’s no doubt. But we are asking you to hang in there with us over the next month or so, and we hope that you’ll share our enthusiasm for the finished product.

 

Categories
Announcements

rolling out a new phase of rapid transit in Vaughan

rolling out a new phase of rapid transit in Vaughan

The next phase of Viva is extending both east and west in Vaughan and Richmond Hill. We were excited to announce this week that EDCO has been awarded the $333.2 million contract to design, build and finance the second phase of the Highway 7 West rapidway.

The first phase of rapidway is well underway in the Vaughan Metropolitan Centre [VMC], with the vivaNext rapidway between Jane Street and Bowes Road scheduled to open in Fall 2016, and the section west of Jane being coordinated with the opening of the Toronto-York Spadina Subway Extension [TYSSE].

phase two

Phase two of the Highway 7 West rapidway will emerge from both sides of the current construction. It will extend west from the VMC, over Highway 400 all the way out to Helen Street, and it will expand east to Yonge Street along the existing Centre Street and Bathurst Street Viva route.

making connections

Extending the rapidway will connect riders from Woodbridge, Concord and Thornhill to the Spadina/University Subway line at the new VMC subway station, and will also connect riders to the rest of York Region via the Richmond Hill Terminal at Yonge Street.

The project involves widening Highway 7, Bathurst Street and Centre Street to add 12 kilometres of dedicated rapidway lanes for Viva rapid transit vehicles PLUS 10 new vivastations, PLUS new bike lanes PLUS pedestrian walkways and sidewalks.

partnering with contractors

As with our previous rapidway projects, this is a public-private partnership. One key difference is that along with the design and build requirements, the contractor is required to finance this project. YRRTC will be the project manager, controlling and approving the design and construction, financial management, and community relations. Metrolinx will own the assets of the rapidway infrastructure, and YRT/Viva will operate transit on the rapidways, and maintain the stations. On regional roads like Highway 7, Centre Street and Bathurst Street, York Region will maintain the road and rapidway.

more than a third of York Region’s rapidways

This project represents more than a third of the total 34 kilometres of rapidways being built, and with this contract awarded, all of our rapidway projects are on the way, except Highway 7 East, which is done!

To learn more about the Highway 7 West, phase two rapidway project, and to sign up for updates, visit vivanext.com/subscribe.

 

Categories
Video

creating connections

video: creating connections - a day in the life of a rapidway rider

Rapid transit is making it easier for people to move about York Region, connecting them to the places, people and things that matter. With all the traffic congestion the GTA currently faces, rapid transit can be a relaxing and time saving convenience. But what does this convenience really look like?

Because Viva travels in its own lanes along the length of the rapidways, riders save time and enjoy reliable service. Rapidway riders experience, on average, time savings of 16 minutes per round trip on the Highway 7 East rapidway, compared to making that same trip in a vehicle. And considering most commuters who travel along Highway 7 East will make daily round trips along the stretch of the rapidway, saving 16 minutes per round trip really adds up. In fact, it adds up to an annual time savings of 64 hours – that’s over two days! And less time spent travelling means more time for the things that matter.

Along with the rapidways, growth continues in York Region with new residential buildings, jobs and businesses popping up in the towns and cities, and along our roads. This means that people living in these urban centres won’t have to travel far to access services and amenities. They can easily walk, bike, or hop on Viva for a short trip to get where they need to go.

Rapid transit is providing convenience, reliability, and freedom for people to move around York Region easily. Watch our new video, day in the life of a rapidway rider, to see how one transit user enjoys the perks of the Viva rapidway along Highway 7, now that it’s complete