Categories
Rapidways Urban Planning

building complete streets in York Region

building complete streets in York Region

When looking at the award winning rapidway on Highway 7 in Richmond Hill and Markham, or Davis Drive in Newmarket, you’ll notice some features that make them different from your average street.

Wider sidewalks, more accessibility features, large attractive tree planters to provide a buffer between pedestrians and traffic, and bike lanes where possible, are all part of York Region’s urban design philosophy. It’s an approach that will shape the future of our communities and neighbourhoods, and it’s what Urban Planners call a ‘complete street’ – a street designed for everyone.

The complete street transformation is starting to unfold on Yonge Street in Richmond Hill and Newmarket this year. Utilities are being relocated to accommodate the dedicated bus rapid transit lanes in the centre of the road. In time, the same thoughtful and elegant elements will take shape on one of the region’s most important roads for transportation, commerce and entertainment – the perfect place to stop, shop and dine – Yonge Street!

The complete street approach ensures that planners and engineers design and manage public infrastructure that takes in account users of all ages, abilities, and modes of travel.

One of the underpinnings of the complete street approach is to treat roads as destinations. With careful planning, roads can be public spaces with lush greenery and design features that engage people. Streets can be places to go instead of just surfaces to drive on. They should connect to businesses and places where people live, and also to trails, parks and other gathering places in order to help build a sense of community.

Another key consideration is accessibility, because whether you get around in a stroller, wheelchair, on transit, walking, cycling or driving, everyone needs safe and convenient options.

To learn more about complete streets and how they are being implemented across Canada and around the world, visit completestreetsforcanada.ca, or smartgrowthamerica.org.

 

Categories
Rapidways Subways

in continuous motion

in continuous motion

At this point in building York Region’s rapid transit system, we can officially say there are projects at every stage. A few rapidway projects and transit facilities are open for service, some are well underway and some are just getting started.

Having projects at different stages can be beneficial. We learn from every project and fine-tune important processes like procurement, financial management and construction scheduling. Special attention is paid to tailoring detailed designs to ensure quality, and scheduling construction to keep impacts to a minimum. Project management is what we do, and to get everything done, we stack the deck with technical knowledge and lots of experience.

Bus Rapid Transit

With 34.6 kilometres of dedicated lanes for Bus Rapid Transit [rapidways] completed or underway we have lots on the go, but there is also much more to do. The remaining half of rapidway projects – 34.2 kilometres – have Environmental Assessments completed and are ready to move forward once funding is in place. This includes completing Highway 7 rapidways in eastern Markham and western Vaughan, and Yonge Street rapidways between Richmond Hill and Newmarket, and north of Davis Drive.

Yonge North Subway Extension

York Region’s highest priority, the Yonge North Subway Extension, is ready to move to full engineering and construction. This 7.4-kilometre extension from Finch subway station to Highway 7 in Richmond Hill will include five stations and will complete a missing link in the GTA transit system. The Yonge Subway Extension has been identified by Metrolinx as a priority project, and the Environmental Assessments and some important studies are complete, so once Provincial funding is confirmed for preliminary engineering this project will be moving forward to this important next step.

As with any great transit system, our projects are in continuous motion. Our experience allows us to think ahead, in planning for each project, and in building a connected transit system for those who live, work or commute in York Region. To help plan the transit system in the GTA, Metrolinx is hosting a series of public meetings in York Region and Toronto in the next five weeks. We’ll be there too, so be sure to drop by our booth.

 

Categories
Video

2015 >> Davis Drive – messy to marvelous!

2015 >> Davis Drive – messy to marvelous!

Davis Drive has seen remarkable changes in 2015. New vivastations, sidewalks, intersections and paving signaled a new beginning on Davis, allowing Viva yellow to take people where they need to go quickly, connecting to Highway 404, GO service at the Tannery and to Viva and GO at the Eagle Street bus terminal.

The investment in modernizing our roads and revitalizing Newmarket’s infrastructure will go a long way to making sure Davis Drive is built on a solid foundation that will serve the growing needs of Newmarket for many decades to come.

We’ve captured some of the pivotal moments during the year and compiled them in a video that introduces some of the notable changes to this important street.

Rapid transit is making it easier for people to move about York Region, connecting to the places, people and things that matter. With all the traffic congestion in the Greater Toronto and Hamilton Area [GTHA], rapid transit provides an alternative which is a relaxing and time saving convenience.

So, whether you are travelling across town or across the region, the rapidway is the way to go, and the future is looking bright for Newmarket.

Categories
Construction Urban Planning

Yonge Street >> the route to change

Yonge Street >> the route to change

Yonge Street has a long and storied past as a hub for shopping, entertainment and culture along its full length. There are many examples of change and transition as you follow its route from the shores of Lake Ontario all the way north to York Region.

You’ll start to see another transformation this year in Richmond Hill and Newmarket as we begin work on a rapidway – dedicated lanes for Viva – along key segments of Yonge Street.

But how did we arrive at this plan? How does it fit in with the existing network?

There are many layers of planning that have helped develop our approach to meeting the transit needs of York Region and ensuring we’re ready for the increasing demand that comes with population growth.

It all stems from The Big Move, a plan by Metrolinx [a provincial agency] that outlines a vision for a connected transportation network in the Greater Toronto and Hamilton Area [GTHA], one of the largest and fastest-growing urban regions in North America.

Following Metrolinx’s plans, York Region’s Transportation Master Plan lays out the blueprint for addressing transportation and mobility needs of those living and working in York Region over the next 25 years. It plans for region-wide infrastructure that is welcoming to everyone, including drivers, transit customers, cyclists and pedestrians.

Out of that blueprint comes York Region’s Centres and Corridors Program. This plan identifies the key urban centres and corridors in York Region where new growth and development will be focused. These key urban centres are located in Richmond Hill, Vaughan, Markham, and Newmarket – and each of these municipalities have a need for managed growth and a connected transportation network for the future.

That’s where vivaNext comes in. We’re where the rubber hits the road, connecting urban centres along key corridors with fast, efficient rapid transit. We’ve done all the ground work, completing the comprehensive environmental assessments, reaching out to the community for input on the design, coordinating with the utility companies to adjust their infrastructure, and awarding the contract to get the job done.

We’ve already opened 8.6 km of rapidways on Highway 7 and Davis Drive, and we’re looking forward to the future transformation of Yonge Street.

To learn more about the Yonge Street rapidway and the construction activities ahead, visit our project page and subscribe for email updates.

 

 

Categories
Video

2015 >> what a year!

click here to see the Year In Review video

This was a landmark year, including opening an operations, maintenance and storage facility, the Davis Drive rapidway, and a park and ride lot in Newmarket. We’re at an important point with our rapid transit projects in York Region. All our funded projects are happening, and the results of the transformation are noticeable.

In November, the Davis Drive rapidway opened, connecting Newmarket east and west. Once sidewalks and landscaping are completed in 2016, Davis will have sidewalks lined with 470 trees and more than 21,000 shrubs and perennial plants.

Vaughan’s vibrant, new downtown is taking shape along Highway 7, with work continuing at a fast pace east of Jane Street on sidewalks, vivastations and landscaping. West of Jane Street, lanes have been shifted to their final configuration and work is being coordinated with the opening of the Toronto-York Spadina Subway Extension. The contract for the remaining rapidway along Highway 7 West in Vaughan was awarded in September, and utility relocations will begin in 2016.

On Yonge Street in Richmond Hill and Newmarket, utility work has begun and major road work will start in 2016.

The Highway 7 East project is now considered 100% complete, and has won multiple awards, including being listed as #2 in Road and Bridges Magazine’s Top 10 Roads list. Commute times are shorter on average, and the street is completely transformed from a highway with gravel shoulders, to a tree-lined street with wide sidewalks and accessible transit, welcoming to everyone.

In Richmond Hill, we opened an Operations, Maintenance and Storage Facility to support the growing fleet of Viva vehicles, and this massive facility was built to LEED Silver standards. A park and ride facility also opened in Newmarket at Highway 404, with the launch of the Davis Drive rapidway.

It’s been a landmark year, and there is more rapid transit and more connections to come, in 2016 and beyond.

 

Categories
Commissioning

changes unfold along Davis Drive >> next is now!

changes unfold on Davis Drive >> next is now

It’s great to see everyone taking advantage of the new rapidway now open on Davis Drive [read the news release]. It is the time of year when people want to move quickly, making their way to the people and places that matter most and Viva yellow is the ticket!

Catching a ride on the new Viva yellow is easy because service runs every 15 minutes and the stations tell you when your next ride will arrive. There will be customer service representatives out all week along the corridor to answer your questions and help you navigate the new system safely.

Winter represents its own set of hazards, so no matter how you get around, it’s important to use caution and stay alert, especially when things are new along Davis Drive. The images that were “next” have become “now” as a reality.

drivers

The red asphalt on the rapidway is for Viva rapid transit vehicles only. If you’re driving, and you notice an empty lane beside you in traffic, take a quick look to make sure you’re not entering the rapidway.

Aside from Viva, you may see other vehicles on the rapidway, like fire and police vehicles and ambulances. That’s by design, because everyone wants emergency vehicles can get to their destinations as quickly as possible. Maintenance vehicles also have access to maintain the rapidway and ensure it’s operating at peak performance.

Also, drivers now have the use of left-turn and U-turn signals at each major intersection. The protected movement through the intersection makes it safe and efficient to get where you’re going quickly. Be sure to stop behind the stop line on the road to trigger the left-turn signal sensors under the pavement.

transit riders and pedestrians

Boarding Viva rapid transit at a vivastation means crossing to the dedicated centre lanes. Push the buttons at any corner to activate the pedestrian signals.

Now, it might be tempting to take a stroll down the rapidway, or cross mid-block to get to the other side, but it’s dangerous and also illegal. The signals at intersections are there for your safety and convenience.

No matter how you’re travelling Davis, we hope you enjoy your new surroundings this holiday season. We encourage you to come out, shop, dine, visit and enjoy. Construction crews are finishing up their work before snow starts to fly this winter. Next is now… come out and see the difference!

 

Categories
Commissioning Safety

safe travels on Davis

safe travels on Davis

Viva is rolling on Davis Drive and drivers are getting used to new traffic movements, so if you’re walking, it’s important to be aware of everything that’s happening when you cross the street.

The most important thing to do as a pedestrian on Davis Drive is to cross at the traffic signals. It may seem tempting to cross mid-block, or walk or stand in the rapidway lanes, but drivers aren’t expecting to see you there.

Getting to and from the hospital from across Davis has always been a challenge, so the intersection in front of Southlake provides an additional way to cross safely. Crossing near the hospital without using the crosswalk is particularly risky, because drivers coming over the hill may not be able to stop quickly.

The next important thing to remember is to press the walk button on the corner of the intersection – the walk signal only happens if you press the button. If you need a little extra time to cross, you can stop in the middle at Parkside/Longford, Main Street or Southlake and press the walk button again to cross the second half of the road.

With spacious, tree-lined sidewalks and tree planters acting as a buffer between traffic and pedestrians, the new sidewalks on Davis Drive are a safe and attractive place to be. It’s getting dark earlier this time of year though, and soon we’ll see snow falling on roads and sidewalks. It’s important to stay alert and make sure drivers see you as you cross the street on your commute, and as you shop and dine along Davis this season.

 

Categories
Commissioning

Viva has arrived on Davis!

Viva has arrived on Davis!

Rapid transit is now a reality on Davis Drive! Known as the Viva yellow, buses are now running along the rapidway, picking up and dropping off passengers at Longford, Main and Southlake, before continuing in mixed traffic to make stops at Huron Heights, Leslie and the Highway 404 park and ride facility.

The introduction of the rapidway on Davis will transform the way people get around and revitalize the corridor. Sidewalks, dedicated left-turn signals, and upgraded infrastructure will serve the needs of pedestrians, transit riders, businesses and drivers for generations to come.

Opening the rapidway marks a significant step forward in connecting our urban growth centres and being prepared for the future. The rapidway supports York Region’s growth plan by encouraging the development of attractive and pedestrian-friendly places for people to live, work, shop and play. We know construction was long and disruptive, and we thank you for your support and patience during this journey together.

Categories
Commissioning

the Davis Drive rapidway opens this Sunday!

The Davis Drive rapidway opens this Sunday!

The rapidway along Davis Drive from Yonge Street to the 404 opens for service Sunday.  Viva yellow will start rolling down Davis Drive at 6:52 am, starting at the 404 park and ride lot and travelling westbound, and then every 15 minutes after that!

We excited to launch the service as well as all the amenities that go with it – the wide, pedestrian-friendly, tree-lined boulevards and sleek, modern vivastations, as well as the dedicated centre lanes that will allow riders to enjoy faster and more consistent travel.  New vivastations will open at Parkside/Longford, Main Street, and South Lake Hospital.

Vivastations will be directly accessible from crosswalks at signalled intersections. Pedestrian signals come with an audible tone and visual countdown as additional safety features.

The stations will include arched glass canopies inspired by transportation architecture from historic and modern European examples. The 27-metre glass canopy will offer passengers protection from the elements, and include a nine-metre enclosed and heated waiting area. At the stations, you can enjoy all the existing Viva technologies you love: off-board fare collection, real-time arrivals information, Presto payment and new card readers. Safety and accessibility features include textured surfaces near platform edges, level boarding from the platform to the bus, a public address system for updating riders, security cameras and an emergency call button.

Once the rapidway opens on Sunday, drivers need to be aware of how the street has changed as they make turns on Davis Drive. Red asphalt indicates a bus only lane, so drive with care. Emergency vehicles are permitted to access the rapidways should they need to, but they will have their flashing lights on for safety.

In just a few short days the wait will be over, and we can all celebrate the end of construction and the beginning of rapid transit in Newmarket!

Categories
Commissioning

countdown to handover

countdown to handover

Taking advantage of every sunny day in Newmarket to advance the work on the Davis Drive rapidway, our teams are working hard to finish all sorts of little details. With much of the construction complete, we’re now focused on testing and adding final touches, to get ready for Viva service, which we call “handover”.

Handover means just what it says – it’s the moment in time when the transit system is handed over to its owner for care and custody, which of course is YRT/Viva. Before handover, the system is the responsibility of the Contractor/Design Builder. Once handover takes place, legal ownership and responsibility is transferred to the owner, and the system becomes the owner’s private property. At this time, the Contractor/Design Builder’s warranty period begins, just the way it happens when a homebuyer takes possession of a new house.

In the case of vivaNext, some elements of the Davis Drive project, like the rapidway, vivastations, sidewalks and planters, will be transferred to the Region. Others, like the sidewalks and streetlights will be transferred to the Town of Newmarket to maintain.

Because the formal handover is such a significant development, especially on a major infrastructure project like the vivaNext rapidway, it’s important to ensure that everything is in perfect working order. The various steps involved in opening for service vary. Here are some examples:

  • Fare equipment is tested to ensure the ticket vending machine [TVM] prints properly.
  • Traffic signals are programmed and permanent signals are turned on. Each phase is then tested individually, and all the push buttons are tested to make sure they work.
  • Streetlights are inspected to ensure all the wiring is according to the drawings, the bases are level and the power connections are all correct. The teams go out at night and actually turn on the lights to ensure that all the lamps come on and nothing is flickering. Lighting is an important safety feature for both pedestrians and vehicles.

During testing every single detail of the rapidway is inspected through a visual walk-down. Then a list of the things that still need to be finished or perfected is created with items graded from most serious to least serious. These items will be fixed either prior to the system opening or post opening under the warranty.

Although we are officially handing over the Davis Drive rapidway to York Region, YRT, and the Town of Newmarket, in many ways we are handing it over to you – at the end of the day, the ultimate owners of the rapidways are the public of York Region. VivaNext wants to provide a reliable, efficient rapid transit system and beautiful streetscape for our valuable transit customers. With every new piece of rapidway delivered, we are building a better system that we can all be proud of.