Categories
Rapidways Urban Planning

Hello Markham…here comes your rapid transit

Rendering of the future Highway 7 rapidway
Rendering of the future Highway 7 rapidway

We’ve all seen examples of where a transportation system has caused a town to grow. Historically, many Ontario towns grew because they became a stop along a railway line. This was true for Markham in the late 1800s, when the Toronto and Nipissing Railway Company began stopping at stations in Markham and Unionville. Another cause for Markham’s growth was the post-Second World War baby boom and migration to the suburbs, and the building of Highway 404 in the mid-1970s. With the influx of high-tech industries, among other changes, Markham has seen an astonishing 25% population increase between 2001 and 2006, ranking Markham as one of the fastest growing municipalities in Canada.

Transportation plays a key role in growth and development, and Markham needs a system to help move the current and future population from place to place. VivaNext is building a rapid transit system along Highway 7 to give people a better transit infrastructure that will accommodate the current population and allow for future growth. As well as move people efficiently, rapidways encourage the development of transit-oriented and pedestrian friendly places to live, work and play. As you can see in the photo above, Markham’s rapidways will widen Highway 7 by two lanes and include two centre lanes dedicated to Viva vehicles and flanked by attractive architectural features and landscaped boulevards.

We’ve already started preparing for construction along Highway 7 in Markham by relocating hydro poles and other utilities to allow for road widening. If you’re interested in receiving construction bulletins and invitations to public meetings, be sure to sign up for updates.

When the snow melts you’ll see road construction begin along Highway 7, and we hope you’ll see past the short-term inconveniences and construction to the more welcoming, improved Highway 7 in Markham.

Categories
General Rapidways

A hum of activity

Photo of hydrovac preparing for utility relocation
Hydrovac crew bores a hole in the ground

There has been a hum of activity on Highway 7 lately. To be specific, the hum of a hydrovac – a large truck-mounted vacuum used to bore holes in the ground. We’re widening some of York Region’s roads to add dedicated rapidway lanes, but to do that we need to locate utility cables and pipes in the ground, and then use a variety of trucks and tools to move all of the utilities further back from the roads.

In terms of utilities, all roads are not the same. Which utilities are in place, where they are placed, and who is responsible for them varies for each section of each road. Electrical power lines and telecommunication wires are often located aboveground on poles, but sometimes they’re buried underground. Gas lines, and sewer and water main pipes are also underground, but not necessarily located together.

In many cases, the utilities need to be moved in a certain order to spots designated by York Region’s Transportation Services Department, Corridor Approvals and Records Branch with input from the construction company. This branch ensures utilities are installed in appropriate locations and keeps record of utility locations. Each organization moves their own utilities and, while doing so, uses the opportunity to check over the equipment or upgrade it.

Municipal government is usually responsible for sewer and water main pipes, but a team effort is important in cases where they cross municipal boundaries. For example, the intersection of Highway 7 and Yonge Street includes land within the Town of Markham, the Town of Richmond Hill, and the City of Vaughan. Gas, electricity and telecommunication companies also vary depending on the location. At vivaNext we work with all of these stakeholders to accommodate schedules and procedures, ensuring we reach our goal of relocating utilities in time for the next scheduled construction activity.

Categories
General Rapidways

It’s winter, but we’re not hibernating

Photo of Utility Relocation
Crew members prepare to move a hydro pole

We’re not pouring concrete in these cold temperatures, but we are still working away on building the rapidways and subway extension. We have different segments underway across York Region, all at different stages. This gives us the chance to do a lot of the prep work that’s needed, so that when spring arrives we’re ready to do the work that can only be done in warmer temperatures.

The rapidway along Yonge Street in Richmond Hill is at an early stage, but we’ve been out surveying the land along the corridor so that our planners and crews can have the exact data they need for the project. The Highway 7 rapidway east of Yonge Street is further along, so we’re now moving utilities further back from the road to make room for widening the roadway. In Markham, the new Warden Station will be the very first to be fully constructed. And, like other things manufactured for the first time, we’re doing reviews to see if any fine-tuning is needed before training the drivers and opening the station. In Newmarket, the demolition work along Davis Drive is almost completed, including recycling 85% of building and landscape materials. Work is also underway on the gas main near the Tannery and Seniors’ Meeting Place.

Work on the Spadina Subway extension is progressing throughout the winter as well. The first pair of Tunnel Boring Machines being manufactured in Toronto will soon be ready to be moved from the factory to the tunnel site, and the second pair of Tunnel Boring Machines is close behind.

All of this winter work moves the projects along so that when the green grass appears in spring all our projects are ready to keep going. We’ll just shed our heavy coats from the cold winter season.

Categories
Rapidways Stations Urban Planning

Finding your way from here to there

vivaNext - rapid transit this wayFor those of you who enjoy video or computer games (or for those who are of “a certain age” but have kids who like gaming), you may be familiar with the variety of games that involve being lost in a maze…you know the ones. You need to figure out where you are and how to get to the end (complete the level!), before something bad happens or the clock runs out. Being lost in a confusing maze can be fun when it’s a game and you’re in a virtual world.

In the real world however, feeling confused and trying to figure out which way to go in a public space, whether you’re in a shopping mall, an airport, or a transit station, is a lot less fun. At the very least, you may waste a lot of time and effort. At the worst, you may miss your connection. Helping people to navigate easily around public spaces, and in a transit environment in particular, is a specialized form of urban design called wayfinding; it’s something we take very seriously in our planning for vivaNext projects.

Our wayfinding design work began quite some time ago, as part of the overall design work for the vivaNext rapidway stations. We have a diverse range of Viva riders – people of all ages, abilities and languages – so vivaNext wayfinding needs to go well beyond simple signage. Wayfinding systems can use a number of elements, from architectural space to maps to signage to graphics, to help people figure out how to get where they want to go, in a safe way. As we design our rapidway stations and station intersections, including the cross-walks and platform layout, we always consider how people will use the stations. We want to make it as easy as possible for people to know which station they’re at, where to buy tickets, and which platform they need to be on.

One of the best parts of the vivaNext plan is the impact our stations will have on making local neighbourhoods even more attractive, providing landscaped and welcoming public spaces. Wayfinding will play a role in linking the rapidway stations with their surroundings. Our design team is working on strategies to ensure each station provides information about local destinations and connections.

So if you’re looking for the thrill of being lost, you’ll have to stick to gaming. Our design work isn’t complete, but from what I’ve already seen, getting around on Viva via the rapidways will always be safe, easy and convenient.

Categories
Live-work-play Urban Planning

Building a bridge between the past and future

The future Keith Bridge on Davis Drive in Newmarket, and diagram of the Tom Taylor Trail detour
The future Keith Bridge on Davis Drive in Newmarket, and diagram of the Tom Taylor Trail detour

A sense of history and attractive landmarks can give us a feeling of stability and pride in where we live; making us even happier with the town and neighbourhood we live in. Voted one of the best places to live in Canada by MoneySense Magazine, Newmarket ranks 15 out of 179 Canadian communities.

People who call Newmarket home have discovered the heritage and scenic areas in the centre of town. The East Holland River is the historic backbone of Newmarket, flowing alongside historic Main Street, under the Keith Bridge on Davis Drive and north to Lake Simcoe. In the 1800s, Newmarket residents used the river for industry and irrigation. Today it’s used for recreation, following along the Tom Taylor Trail. Recently those using the trail have seen some detour signs where it normally passes under the Keith Bridge. The detour directs people to cross at the traffic lights on Davis Drive, and pick up the trail again on the other side.

Over the next year, we will be widening the Keith Bridge to allow for rapidways to be constructed on Davis Drive from Yonge to the Southlake Regional Health Centre. As we widen the bridge we’ll also be enhancing it, adding architectural features such as stonework, railings and light fixtures that provide interest and reflect Newmarket’s heritage.

Completing the beautiful new Keith Bridge by the end of 2011 is a major part of the Davis Drive transformation that Newmarket residents will be watching with excitement over the next three years.

Categories
Rapidways Stations Urban Planning

Designing a rapidway

Designing a rapidway

Earlier this year, I wrote a series of blogs about planning for growth, discussing York Region’s long envisioned goal of a true rapid transit system. The system would have to connect regional centres and move the expanding population around quickly, without increasing car traffic. The plans for this rapid transit system have been in the works for several years, and given our population, we know that bus rapid transit (BRT) offers the right technology at this time.

But how did we get from knowing we wanted to have a BRT system, to the actual design of the rapidways?

The first design considerations went back to our basic goals for a rapid transit system: to move a lot of people around efficiently, and to not add to gridlock on the roads (in fact, to reduce gridlock). The easiest and fastest way to create rapidways on existing roads would have been to convert the curb lanes, replacing two lanes of traffic. While this option would have met our first goal of moving people around quickly, it would have also decreased existing road capacity – which would defeat our second goal of not adding to gridlock. This meant that we would have to add lanes to include the rapidways.

Once we knew that, the next design consideration was where to put those new rapidway lanes. Again, we referred back to our first goal: to move a lot of people around quickly. The basic benefit of rapid transit is that it provides a consistent, reliable way of getting from point A to point B. Riders know how often the vehicle will arrive, how long the trip will take, and they know they can count on it, no matter how heavy the traffic. So what are the design considerations to ensure a consistent, reliable ride?

One key design requirement is to provide level boarding, meaning that passengers don’t have to climb up or down steps onto the vehicle; for example, subways have level boarding. With level (or close to level) boarding, people have better access, regardless of their level of mobility or whether they are pushing a baby carriage. Level boarding allows more people to get on and off quickly and results in shorter dwell time, which means vehicles spend less time at stations. In short – level boarding helps make the service faster, which in turn helps vehicles keep to a schedule, and provide a consistently reliable, frequent service. These improvements make transit more appealing to more people – which meets our first goal.

But to provide level boarding, the platforms have to be close to bus floor height – which is about a foot off the ground (most sidewalks are closer to 6″ high). To provide higher platforms, our stations needed to be separated from sidewalks. Theoretically, we could have built higher platforms on the edges of sidewalks, but there are reasons why this isn’t ideal: our stations would take up too much of the sidewalk, which could interfere with local businesses. Therefore, the best place for our stations would be to have them physically separated from the sidewalk. In our case, this meant locating stations in the middle of the road. The benefit of having the stations in the median, is that passengers won’t have to walk all the way across the road to get to a station – they can meet us half-way.

But by adding the rapidways down the middle of the road, we then needed to widen the roads to accommodate both the rapidways as well as the existing traffic lanes. All of which takes us to our final design, which is have our rapidways running along the median, with median stations, and special left turn and u-turn lanes at intersections to allow drivers to safely and easily turn across the rapidways.

Of course, going this route has required more steps, including acquiring the land needed to widen the roads. But the end result is going to be a rapid transit system that meets our goals of providing fast, consistent transit, without adding to existing traffic congestion. And that’s a design solution that we can all be really proud of.

Categories
Rapidways Stations

first new vivastation is coming together!

Metal framework being raised into place at one of our new vivastation platforms
Metal framework being raised into place at one of our new vivastation platforms

The first vivastation designed for our new system of rapidways is becoming a reality. The arched metal framework for our new vivastation platforms at the intersection of Warden Avenue and Enterprise Drive has now been raised into place, and glass canopies will be added over the next few weeks.

This vivastation will be put into service next year, replacing the current Viva shelters at this location. Passengers using Warden Station can look forward to a new level of comfort next winter, with an enclosed, heated, and LED-lit section and an arched glass roof to shelter them as they get on and off our vehicles.

The new vivastation is located at the western gateway to Markham Centre, where a vibrant mix of activities will be available on the streets and squares where people live, work, shop and play. The first phases of residential construction are already underway.

I look forward to seeing the new station in service, and if you use this station, I hope you’ll let us know what you think.

Categories
General Rapidways

Transit priority measures to get you there faster

Transit Priority Measures to Get You There Faster

I often talk about the big picture benefits of the vivaNext plan; our rapid transit system will help York Region manage growth through new transit-oriented development; reduced reliance on cars will benefit the environment; greater choice will improve the quality of life for York Region residents. And of course, the main benefit of the vivaNext plan— rapidways will allow people to get around York Region faster than before.

The vivaNext rapidways are going to make a major difference to the timeliness and efficiency of Viva service, but what you may not know is, we took steps prior to Viva’s launch to make the service as fast as was possible. We put various measures into place – collectively called “transit priority measures” – to make it easier for Viva vehicles to get through gridlock. This means that commuters on Viva are already able to cut through traffic congestion faster than people travelling in cars.

Ok, I know what you’re thinking: “There’s no way a bus can go faster than a car unless it’s in its own lane.” Allow me to explain.

In general, transit priority measures are strategies that help buses move quickly along their routes. These measures can involve physical improvements to the roadway, with the most obvious example being dedicated lanes through congested areas (like the vivaNext rapidways!). A less dramatic, but still effective approach is that of queue-jumping lanes, which allow buses to move ahead of congested traffic at intersections. We installed queue-jumping lanes for Viva’s first phase.

Another transit priority measure involves legislative steps. Have you ever noticed the big “Yield to Bus” sign on the back of buses? This transit priority measure was added to Ontario’s Highway Traffic Act to improve transit flow and make transit service more reliable and efficient. This law actually requires drivers to yield the right-of-way to buses trying to leave bus bays and merge with traffic.

The other key category of transit priority measures involves something called “intelligent transportation systems” which are signal system technologies used to improve transit efficiency. Signal systems are quite complex, but in general, modern signals analyze inputs (e.g. vehicles approaching a signal or crossing buttons being pushed by pedestrians) and decide when the traffic lights should change. Transit priority systems add another important input. A bus will automatically send a message to the traffic signal telling it to change, and the signal will adjust its timing in response, favouring the bus. This is not to say that the bus is guaranteed a green light (such as the case of an emergency vehicle), but rather that the delay to the transit vehicle is slightly reduced compared to normal operation (without the transit signal priority).

Viva vehicles don’t “ask” for priority at every signal; priority is only requested when the Viva vehicle is running behind schedule. Currently, Viva vehicles can ask for a low level of priority when they are one minute off schedule, and more immediate priority when they are three minutes behind schedule. And to provide some context, with light cycles in the Region often lasting about two minutes, missing one light can easily put a bus behind schedule. So signal priority is an important tool that helps keep the system running on time, even during the busiest times of the day.

By combining dedicated transit lanes through the most congested parts of Highway 7, Yonge Street and Davis Drive with other transit priority measures in less crowded stretches, Viva is going to offer you a ride that will be comfortable, convenient, fun—and faster than ever before.

Categories
Community Events

The vivaNext Team welcomes the fall season!

Markham Fair

It’s that time of year again! The Markham Fair starts this Thursday and the vivaNext team will be there!

There has been a great deal of progress made on vivaNext projects since last year’s Fair – that’s why we encourage you to drop by our indoor booth for an update! We’re particularly excited about the progress of the Enterprise rapidway in Markham, which is due for completion by the end of this year. We’re also gearing up for more work on the Highway 7 rapidways. With plenty of information and great news to share, the vivaNext team is looking forward to answering your questions about rapid transit in Markham and York Region.

We hope that you enjoy the wide selection of food, live entertainment, activities and competitions the Markham Fair has to offer. This annual event is one of the oldest country fairs in Canada, and is a great way to spend time with family and friends, connect with the community, and welcome the fall season!

See you there!

For a coupon offering $2.00 off adult admission to the Markham Fair, please click here.

Markham Fair

When: September 29 – October 3, 2010
Thursday – Saturday: 9am – 10pm
Sunday: 9am – 6pm

Where: Markham Fairgrounds
10801 McCowan Road, Markham, ON

Categories
Rapidways

Connecting the past to the future

Connecting the Past to the Future

One of the best things about my job is that I get an opportunity to work with people who are really passionate about their community, and who want to share their knowledge and enthusiasm with others. One such group that the vivaNext team has had the privilege of working with over the past year or so is Heritage Newmarket, a committee that advises Newmarket Town Council on various issues related to the Town’s history and heritage properties.

An important part of the Heritage Newmarket mandate, and something that we’re proud to support, is increasing public awareness of the history of the Town of Newmarket. We believe that while we’re building the rapidways along Davis Drive, we have a great opportunity to build various features into our design that will tell people they’re in an historical district, and help build local knowledge and appreciation for Newmarket’s heritage.

One theme that we will be highlighting is, of course, transportation in its many forms. From prehistoric times, nomadic indigenous peoples roamed the area now known as Newmarket, searching for food and shelter. By the 12th century, the Rouge, Humber and Don Trails, connecting Lake Ontario and Lake Huron via the Holland River and Lake Simcoe, were well established travel routes for these early inhabitants. European fur traders first travelled here 400 years ago, and when York County was established in 1792, a road named Military Street was built to replace the trails that connected Lake Ontario and Lake Huron. This road, which ran from York (now the City of Toronto) to the Pine Fort at Holland Landing, was eventually renamed Yonge Street.

By the mid-19th century, more and more people were coming to this area, including day-trippers to the Saturday Farmer’s Market and the North York Agricultural Fair, as well as business people. The Ontario, Huron & Simcoe Railway built a rail line to more effectively connect Newmarket and Toronto, travelling up Yonge Street and over to the Main Street area in Newmarket. And in the early 20th century, a canal system to transport goods was built in Newmarket. Although it was later abandoned, remnants of the system can still be found today along the Holland River.

So how will we be commemorating this rich history along the Davis Drive rapidways? Detailed planning is still underway, but our concept is to highlight heritage features in two areas: at Davis Drive and Main Street near the historic downtown, and along the Keith Bridge. Our urban design team is exploring ways of incorporating distinctive features such as lighting, pavement treatments, street furniture and other elements with a heritage aesthetic.

We know that there’s a really interesting story to be told, and we will be working with Heritage Newmarket and others to provide more information in these key areas, possibly through plaques, informational signage, and more. In the meantime, if you want to know more about Newmarket’s fascinating history, I’d encourage you to check out the links below to learn more about the Town and see how vivaNext is but the latest chapter in the ongoing story of getting people from A to B.

Links: