Categories
Rapidways

What’s a rapidway and how will it help?

An artist rendering of a viva vehicle riding on the rapidway
An artist rendering of a viva vehicle riding on the rapidway

Recently, we received $1.4 billion in funding to build rapidways. But what are rapidways? It is the term for centre of the road, rapid transit-only lanes that we will build for Viva vehicles to travel in.

It’s rapid because, without being stuck in traffic, Viva will be able to zip through congested areas making it the better way to get around York Region.

Rapidways will put the rapid into rapid transit. Right now, our vehicles compete with all the other cars and trucks on the road. During times of high volume, the rapid transit vehicles will be able to glide past gridlock and actually make for a faster commute than in a car. It’ll be like driving in the carpool lane, but without even other drivers. Similar to how the carpool lane will save you time, we project that the rapidways will make Viva trips 40% faster.

The system is designed to allow for higher capacity light rail trains to replace buses on the rapidways when ridership warrants it. I will follow-up with a more extensive post about this soon.

Categories
General

Wondering what the difference is between YRT, Viva & vivaNext?

York Region operates York Region Transit (YRT) as a local transit service and Viva, which is a rapid transit service. Typically, Viva is fed passengers by YRT, which travels in and out of neighbourhoods. Both services are operated by YRT, a branch of York Region’s Transportation Dept., and work together as one system to provide you with seamless connections across all nine municipalities.

As strange as it may seem, York Region Rapid Transit Corporation is separate from YRT and Viva, and does not operate the service. York Region Rapid Transit Corporation is responsible for designing and building the rapid transit plan [vivaNext].

That’s us. We’re responsible for designing, developing and building the future rapid transit system in York Region. Through a process of public consultations, we gather input from the community to ensure that the needs of local businesses, residents and other groups are being met and their concerns are addressed. The new system allows you to move between regions and within York Region faster than ever before. That’s thanks to subway extensions and rapidway lanes, where transit vehicles can move without getting caught in traffic.

As each vivaNext project is completed, YRT takes on the operations, and also develops service plans for where and how often each route will travel. For you, it means a seamless and well-connected service.

Categories
General

Time-lapse animations a big hit with the Region

I really had no idea what they would say. We’ve recently been working really hard on creating images of what parts of York Region will look like when the rapidway/subway projects are completed and mixed-use development is built. And on April 16, I showed examples to York Region’s Rapid Transit Committee.
The final frame of the time-lapse animation in Markham
The final frame of the time-lapse animation in Markham


I’ll save you the suspense and just say that their eyes lit up and all the Mayors wanted to know when they would get a copy of the final images and time-lapse videos. In fact, one of the reporters there requested electronic copies of the three images shown. Guess we’ll see that in print this weekend.


For us, they have been developing time-lapse animations of how Markham, Vaughan and Newmarket will change over the next 5-10 years as communities are built around transit.

In only a few seconds, the time-lapse animation shows how these different areas will change as subways and rapidways come to York Region. They are still works in progress and will look even better when completed in a few weeks. So be sure to check back on our website to see the videos, and I’ll let you know here when they’re done.

I like going to meetings like this because it gives us a chance to talk with elected officials, members of the public and the media about how our progress is going and to hear their thoughts.