warranty & deficiency work ensures quality for years to come

When building rapidways for generations to enjoy, it’s important to make sure that the end product meets the requirements we set out to build. That’s why you may see work activity in the first couple of years after infrastructure projects are done.

Deficiencies

Everything – from the paver stones on the sidewalk, to the glass in the canopies, to the red asphalt – is tested, inspected and verified by qualified engineers with a keen eye for detail. Anything that doesn’t make the grade is placed on a “deficiencies list” that the builder is responsible to remedy.

Warranty work

Much like when you buy a new house, it can take one or two years for the foundations to settle, and for you to make note of where the finishes are less than desirable. Then the contractor comes back to fix all the nail pops and cracks in the drywall, fill any gaps in the molding and repaint where necessary. It ensures that you are happy with the work, and you get the most out of your home. Warranty work is the same idea for our facilities, stations and rapidways.

Project managers of infrastructure projects call this the warranty work phase – an opportunity to catch any issues so that they can be fixed while the infrastructure is still under warranty – a period of two years. Note that the two-year warranty period starts when the project is handed over to York Region.

It often takes all the seasons in a full year to see how things weather in our climate, or perform once in use. You could see operations such as grinding and smoothing of curbs, fixing paint finishes and filling small cracks and, of course, taking note of anything else that needs work. Some upcoming warranty works may be much bigger, like asphalt replacement.

Finishing work

That’s why this spring on Highway 7 West and along Bathurst & Centre in Vaughan, and on Yonge Street in Newmarket, you’ll see project completion work such as planting trees and shrubs, raised bike lane paving, permanent pavement markings, station finishings like anti-grafitti application, and caulking, etc.

Whether you’re a regular transit rider, or are considering your first trip on the rapidway, know that we are working hard to provide you with a quality experience – and infrastructure that’s built to last.

For information about ongoing vivaNext projects, be sure to subscribe to email updates, and follow us on Twitter. You can also follow us on Instagram, YouTube and Facebook. Questions or comments? Comment below or email us at contactus@vivanext.com.

Categories
Construction Utilities

the utility bonus

click here to see our YouTube video about utilities!

If you’re a regular reader of this blog, you’ve probably noticed how often we post a story on some aspect of utility infrastructure. That’s because, as much as our main focus is transit, relocating and upgrading utilities is a very significant  piece of our construction project just on its own, in terms of effort, time and money.

Most of our posts are about the complexities and challenges of utility relocation. But the most important story is about the bonus: at the same time as we’re building new transit, York Region residents and businesses are going to be getting new telecommunications, water, sewage, drainage, power and gas lines to power them into the future.

Unlike a single construction project with one overall manager, the utility project demands that many players work together collaboratively. Working within multiple agreements and relationships, our projects [funded by Metrolinx], the Regional and local municipalities, and the utility companies all work together to coordinate the utility construction.

Whereas York Region Rapid Transit Corporation leads the design decisions for the transit project, it’s the utility companies – including private companies and municipal utility companies – who determine what they need to meet the needs of their customers. Starting with our project’s alignment and overall design, it’s up to the utility companies to decide what infrastructure they’ll need as the population grows, and where it needs to go. For this, they need to take into account future development as well as current needs.

Because there’s not much room down there, and there’s a logical order to what goes in first, the utilities need to work out their plans in ways that work for everyone. In some cases they can jointly locate their services, but more often they need their own space within a separate trench or on an overhead line. Finally, they are responsible for carrying out their own construction, with only one crew able to work in a given area at a time.

Because we’re all equal players in this, coordinating activities requires us to work together, including our project team, the designers and construction experts working for the utility companies, and the various levels of government.

With every vivaNext corridor that gets completed, the end result is increased telecommunications capacity, upgraded water and sewage, better drainage, and new service connections to individual houses and businesses. That’s a future bonus that’s definitely worth the effort and a benefit for everyone.

 

Categories
Utilities

connecting the drops

connecting the drops

The importance of upgrading Canada’s infrastructure is everywhere in the news these days. Infrastructure includes everything from bridges to roads and transit, to utilities such as hydro lines, sewers and water mains. Each vivaNext project includes improvements to infrastructure and utilities, leaving a lasting legacy for residents and businesses. One of the most important pieces of infrastructure is a water main – bringing fresh water to your mealtime prep, your kids’ bath tub and even your local swimming pool. In Richmond Hill, the residents and businesses connecting to Yonge Street are getting a new, modern water main to prepare for future growth.

Although to some people it might not seem very glamorous, an important example of a major infrastructure improvement is the replacement of the Richmond Hill water main, which we’re doing as part of the vivaNext Yonge Street rapidway project. This work will replace 3.7 kilometres of water main along Yonge Street from just south of Garden Avenue [north of Highway 407] to Major Mackenzie Drive. The water main, which supplies water to the adjacent residents, is owned and maintained by the Town of Richmond Hill, with construction done by the vivaNext Design Build contractor.

Water main replacements, especially in busy thoroughfares like Yonge Street, require complex planning for design, staging and construction. As with all our work, we need to find a balance between a number of competing priorities. One priority is to maintain service to households and businesses who depend on the water main. Another priority is to get the work done in a way that minimizes disruption to traffic. And, as always, we need to plan the design and construction in a way that gets the most value for money, including future maintenance costs.

To avoid existing underground utilities and simplify construction, we’ll relocate the water main to run under the traffic lanes on Yonge Street. We also want to avoid locating it under the new planters that will be built along the sidewalk, in the event that future maintenance on the water main is needed.

Replacement water mains are generally located as close as possible to the original water main, to preserve existing connections to residences and businesses. As a result, construction proceeds more slowly to avoid any damage during excavation to the existing water main, which stays in use until the new one is ready for service.

To minimize disruption to traffic, workers will be building the new water main from inside a trench box, which significantly reduces the amount of space needed to carry out the construction compared to regular excavation. The benefit of constructing in less space is that fewer lane closures are needed during construction, which is critical on Yonge Street.

However, trench box construction has to move more slowly. The rigid trench box also makes it more challenging to work around conflicts with other buried infrastructure. From time to time we can expect progress to slow down while crews get around other underground utilities. Construction will be followed by a lengthy process of pressurizing, cleaning and testing, all to meet very strict government standards.

Once the new water main is ready to go, a new connection to each address along the main route will need to be made, along with additional connections to other water mains at intersections. Individual addresses are relatively straightforward to reconnect, but businesses and multi-unit residential buildings take longer, with connections to larger pipes and fire lines. This process of disconnection and reconnection will be planned ahead, with communication with each residence and business to minimize disruption.

We’re excited that the community is going to be getting a new water main, built to the most modern standards. Our team is working with the community during construction to help minimize any impacts to parking and driveways. And we’ll make sure there’s lots of clear signage to help guide you through construction areas.

It’s a huge project, and it’s going to be pretty messy out there for a while. But long term, it’s great news for the residents of Richmond Hill that this huge investment is being made in infrastructure. We hope this helps explain what the crews are doing out there, and how it makes a difference to the community. For more information on ongoing work be sure to sign up for email updates, and follow us on Twitter.

 

Categories
Construction Utilities

the murky world of underground infrastructure

the murky world of underground infrastructure

Property ownership and development are generally straightforward concepts: people or businesses own land, including any assets that are built on that land, and only they can decide when and if any improvements are to be made.

But what happens when the property is located underground, and the improvements are being made by someone other than the property owner? Welcome to the murky and confusing world of underground infrastructure, where ownership and decision-making are much more complex than above ground.

Underground infrastructure, which includes gas and power lines, telecommunications, watermains and sewers, is always owned by either a private company or the municipality. But generally utilities are located under roads or sidewalks, or on private property; utility companies typically do not own the land where their utilities are located.

In most cases underground infrastructure is located in the “public right-of-way”, including roads, sidewalks and boulevards. If a utility company wants to make a change to their own infrastructure, such as making a repair or increasing capacity, they need to get municipal approval before any work can be done. This “municipal consent” process is set out in legislation, and ensures municipalities can control and coordinate utility work on public lands or roads. This is critical, especially when utility work requires road closures or detours or will have some other impact on the public.

Municipalities also can set restrictions on when and how utilities can access their own infrastructure, to minimize impacts on the public and protect the municipality’s own infrastructure. For example, a municipality might impose a moratorium on changes to private infrastructure on newly built or repaired streets, so that new asphalt isn’t dug up.

In all cases, our projects spend a lot of time coordinating with utility companies to resolve any conflicts between the rapidway and streetscape elements we’re building, and the multiple utilities using the same space. In many cases, utilities can co-locate, for example telecommunications may share a common duct bank, and be buried next to hydro. Designs for all relocated utilities have to work with our vivaNext design, and in some cases where space is limited, working through the design process to fit in all the elements can be extremely challenging. Municipalities also have views on where they want elements located; the Region avoids locating utilities in their roadway, whereas local municipalities prefer to keep utilities away from the planters.

Once the design is established, a schedule is worked out with the Region or municipalities, specifying how long the utility work will take. Utilities are given a specified amount of time to close lanes as part of the final permit; even if the work is next to the road, lanes often need to be closed to give workers room to work safely. Our design-builders will coordinate construction work with the utility relocations, since only one activity can be carried out at a time in any given place.

The last but very important part of this complicated process is reducing the disruption for nearby residents and businesses. Once the design and municipal consent is complete, the utility and vivaNext community liaison team work with property owners to discuss access to properties while work is underway.

A lot of moving parts need to be coordinated and resolved before any underground infrastructure gets moved, but our teams are committed to coordinating these efforts with everyone’s best interests in mind.

 

 

Categories
Commissioning Construction Rapidways

warranty work >> ensuring quality for years to come

warranty work >> ensuring quality for years to come

When you’re building rapidways for generations to enjoy, it’s important to make sure that the end product is what we want.

Everything – from the paving stones on the sidewalk, to the glass in the canopies, to the red asphalt – is tested, inspected and verified by qualified engineers with a keen eye for detail. Anything that doesn’t make the grade is placed on a “deficiencies list” that the builder is responsible to remedy. That’s why you may see occasional construction activity in the first couple of years after infrastructure projects are done.

Project managers of infrastructure projects call this the warranty work phase – an opportunity to catch any issues so that they can be fixed while the infrastructure is still under warranty. It often takes all the seasons in a full year to see how things weather in our climate or perform once in use.

Much like when you buy a new house, it can take one or two years for the foundations to settle, and for you to make note of where the finishes are less than desirable. Then the contractor comes back to fix all the nail pops and cracks in the drywall, fill any gaps in the molding and repaint where necessary. It ensures that you are happy with the work, and you get the most out of your home. Warranty work is the same idea for our facilities, stations and rapidways.

On Davis Drive, we’re starting with the grinding and smoothing out of curbs, fixing paint finishes and filling small cracks, and of course taking note of anything else that needs work.

Whether you’re a regular transit rider, or are considering your first trip on the rapidway, know that we are working hard to provide you with a quality experience and infrastructure that’s built to last.

 

Categories
Construction

the CN Bridge is bigger and better than ever

the CN Bridge is bigger and better than ever

Highway 7 West is changing quickly, with beautiful new sidewalks, tree planters and vivastations at Creditstone and Keele. Rapid transit is on the way to Vaughan, but it’s about more than just transit. Once the rapidway projects are complete, new infrastructure will be in place, including utilities and bridges.

crossing the bridge

One bridge that cannot be missed is the CN MacMillan Bridge, crossing over the largest rail yard in Canada. The MacMillan Yard was established in the 1950s and is named after one of CN’s founders, Norman John MacMillan. The yard operates 24 hours a day and handles over a million train cars per year.

bigger and better

As part of widening Highway 7, the CN MacMillan Bridge needed to be expanded a total of 8.5 metres on the south and north side. This involved rebuilding the underlying structure with 8,000 tonnes of backfill, 10 new vertical piers, and 18,000 tonnes of steel reinforcing 13,000 tonnes of cement, and laying a new road surface – all without disrupting CN rail operations below!

better for people too

The new bridge will have two new rapidway lanes, but it’s not just for driving. Pedestrians and cyclists will be able to enjoy the view as they cross on the improved sidewalks and a bike lane.

If you’re driving on the bridge in the coming weeks, you may notice the lanes being reconfigured, and a crane being “walked” from one side of the road to the other.

Once the rapidway project and the subway extension are done, this major transportation hub will be transformed for any mode of travel – rail, bus, and subway.