Taking steps to ensure our passengers feel secure and safe using the new Viva stations is a top priority for YRT/Viva.  Every detail of our new passenger stations on the Highway 7 rapidway has been designed with a view to make riders feel comfortable, well protected from the elements and adjacent traffic, as well as able to access help in an emergency.

With our median platforms located in the middle of a busy roadway, one of our top priorities has been to make the stations feel like a safe haven.  Stations will provide a secure waiting place for passengers with a concrete barrier wall running all along the traffic side, and a glass guardrail beyond the canopy.

To access the new stations in the median, pedestrians must use the crosswalks and cross with the signal.  When crossing the road to or from the new station, you must remember to push your pedestrian button to get the signal indicating when you can cross safely.  Also, because this is new for everyone, it is important that pedestrians watch for traffic before stepping out to cross the road – there could be cars making left-hand and u-turns.  Whenever there are changes, it is important to be aware of all the users to the roadway to ensure your safety at all times.

The new Viva stations reflect the CPTED (Crime Prevention Through Environmental Design) principles of transparency and good lighting, enabling people to see and be seen. We’ve paid careful attention to lighting levels, including along the platform and in the glass enclosure, which is fully visible to the platform and has doors at either end.

Each platform is well equipped with electronic security devices, overseen 24/7 by YRT/Viva staff at transit headquarters.  Stations are monitored constantly by three CCTV (Closed Circuit Television) cameras.  In addition to providing good coverage of the platform at all times, transit staff can maneuver the cameras manually as needed.

To add to passenger’s sense of security, a clearly marked Emergency Call Button (ECB) is located inside the glass enclosure, and its speaker provides immediate two-way contact between the caller and YRT operators.  The audio of the call is recorded and time-stamped, as is the video that is automatically captured by the closest camera when the button is pushed. When the ECB is pushed, blue strobe lights on the VMS and on the ECB will be triggered to indicate to passing emergency services that assistance is needed, and transit staff will dispatch emergency services if required.

Also adding to these new features is the PA system that will be used to provide live and recorded public announcements from transit operations, which we talked about in a previous blog.

These new features are probably things that most people will never need to think about.  All the same, knowing that we’ve gone to great lengths to maximize our passengers’ sense of safety, and that our transit staff are on duty 24/7 behind the cameras, should give all our riders total peace of mind.  Be safe!

Categories
General Rapidways Stations

we can hear you, loud and clear

Most PA systems are pretty frustrating in the garbled sound quality they provide. But at vivaNext the engineers have worked hard to design the optimal public address system for your new vivastations.    There’s nothing worse than knowing something important is being said, but not being able to understand it or hear it properly.

To make sure the new PA system is always audible, we started with an acoustic analysis study using special “Enhanced Acoustic Simulator for Engineers” (EASE) software. This study analyzed the two elements most critical to sound: Sound Pressure Level (SPL) and Speech Transmission Index (STI). The SPL, measured in decibels (dB), is concerned with sound magnitude and takes into account ambient noise levels – it is the relative “loudness” of a sound.  STI predicts how the equipment being used and the surrounding environment will affect the quality of the sound, and therefore how intelligible it is for you as you hear it.

First, the acoustic engineers needed to determine what effects our curved canopies and the beams and angles inside the station would have on the way sound is going to move around.  Secondly, the reflection of sound by the concrete wall, floor and glass was modeled. This analysis helped predict how clear the final sound will be on the platform and in the enclosure, and also helped determine the number and placement of speakers that will be most effective in achieving clear sounds.

Following this sophisticated modeling the engineers determined that the optimal number of speakers to achieve these goals would be 12 speakers located outside of the passenger enclosure, and another 3 speakers inside.

The next challenge was to work on the volume of the speakers.  The problem with PA systems in noisy places is that the ambient noise can overwhelm the volume of the PA system, making it impossible to hear what’s being said.  Our solution is to use a speaker volume system that automatically adjusts when its sensors detect that the ambient noise has increased or decreased.

There are two sensors on each new Viva platform to measure noise level. This way, announcements should be audible whether there’s a bus idling in the station and trucks are moving past, or it’s nighttime and quiet. Volume control and environmental sensitivity helps determine the right sound levels without disturbing those who don’t need to hear the message.

The PA system will be used for recorded and live announcements from transit operations, such as emergency information or service changes.  It will not announce bus arrivals at this time, although it does have that capability should we want to turn on that function.

Although we’ve tested the system many times, we continue to monitor the sound levels, so let us know if you can truly hear us, loud and clear.

 

Categories
General Rapidways Stations

ITS – balancing the needs of all travellers

Gridlock is an increasing problem everywhere across the GTHA and most other large cities.  But what can be done about it?  VivaNext is one part of the solution.  With the new vivaNext system comes improved ITS – which isn’t what you think…

Some people may think ITS is connected to “Information Technology”, but in the vivaNext world ITS stands for “Intelligent Transportation Systems”. ITS is an international transportation-engineering discipline that is trying to improve the efficiency of travel, whether it involves the travelling public, commercial vehicles, or transit.  The basic assumptions behind ITS are that delays cost money, and more efficient travel saves money. This new technology is an absolutely critical component of the vivaNext program, although with low-visibility.

ITS is used to ensure that traffic corridors are designed as one coordinated system – the physical roadway’s design, lane markings and signs, traffic signal design and timing, and the brains that connect all these pieces.  In a transit project, ITS has an additional layer which is concerned with how the transit system is integrated into that larger system.

As high-tech as each of these components are, none can be effective unless it can communicate with the others.  Each one also needs to be connected to the overall transit system which keeps track of the schedule for each bus, and which determines when the traffic signal phasing requires a temporary adjustment to let a delayed bus get back on schedule by holding a light.

The connection is provided through a fibre optics communications network that links all of the intersection and every vivastation to YRT’s transit operations and York Region’s traffic operations.

This system is fully automated, with approaching vehicles alerting intersections that they are arriving, and each intersection sharing that information with the central traffic control system, which in turn compares that information with the transit schedule.  The system is continuously adjusted and fine-tuned to ensure the buses stay on schedule, while keeping the roads and intersections working well for everyone.

To enhance passenger safety, each station is equipped with cameras to monitor the platforms, a public address system to provide announcements and an emergency call box for personal safety.  All of these systems operate reliably and seamlessly over the new fibre optic communications system.

The future Highway 7 will be significantly more urbanized, with more people living and working along the corridor.  That means there will be more transit riders, pedestrians and cyclists whose travel requirements need to be considered, in addition to car and truck traffic.  Helping transit vehicles stay on schedule is also a priority, since rapid transit can’t be rapid if it’s stuck in traffic.

These ITS strategies help balance everyone’s needs, to get everyone there as fast as possible!  It truly is a balancing act!

 

Categories
Construction Rapidways Uncategorized

countdown to handover

countdown to handover

Taking advantage of every sunny day to advance the work on the Highway 7 rapidway in Markham, our teams are working hard to finish all sorts of little details. With much of the construction complete, we’re now focused on the final stages of construction and testing, and then getting ready for handover, when the system is officially turned over to York Region and YRT, the system owners and operators.

Handover means just what it says – it’s the moment in time when the transit system is handed over to the owner for care and custody. From that time forward, the system – which until then has been the responsibility of the Contractor/Design Builder – becomes the private property of the owner.

Because the formal handover is such a significant development, especially on a major infrastructure project like the vivaNext rapidway, it’s important to ensure everything is in perfect working order. The various steps involved in commissioning, which is the testing period that takes place before handover, vary depending on what is being handed over. For example, with the fare equipment, we make sure the ticket vending machine [TVM] prints properly. With the traffic signals, once they’re programmed the permanent signals are turned on and each phase is tested individually, and all the push buttons are tested to make sure they work.

Streetlights are inspected to ensure all the wiring is according to the drawings; that the bases are level, and the power connections are all correct. The teams go out at night to actually turn on the lights, to ensure all the lamps come on and nothing is flickering. Lighting is an important safety feature for both pedestrians and vehicles.

Every single detail is inspected through a visual walk-down. Then a list of the things that still need to be finished or perfected is created with items graded from most serious to least serious. These items will be fixed either prior to the system opening or post opening under the warranty.

Once handover takes place, legal ownership and responsibility is transferred to the owner, and the Contractor/Design Builder’s warranty period begins, just the way it happens when a homebuyer takes possession of a new house.

Handover in this case means some elements of the rapidway, like the rapidway, stations, boulevards and planters, are transferred to the Region. Others, like the sidewalks and streetlights are transferred to the local municipality to maintain.

Ultimately, vivaNext wants to provide a reliable, efficient rapid transit system and beautiful streetscape. Because, at the end of the day, the ultimate owners are the public of York Region and with every new piece of rapidway delivered, it makes it a better system that we all can be proud of.

Categories
Construction Rapidways

testing, testing, testing

testing, testing, testing

As you will know from driving along Highway 7 East from Highway 404 to Warden, our rapidway construction is really coming along, and this summer another segment will be going into operation. We still have a bit more work ahead of us before service operation can begin, including some work which will be obvious, such as final paving, striping and landscaping. But in addition to that, we’re just getting underway on a less-obvious but highly important part of the job, which is testing – to ensure that all parts of the rapidway project are ready for active service.

This stage – known in the construction world as commissioning – is critically important and planning for commissioning the new section of Highway 7 East rapidway has already been in progress.

So what does commissioning involve, and how do we do it?

First of all, the technical definition of commissioning is: the process of assuring that all systems and components of a system are designed, installed and tested according to the operational requirements that have been established.

In the case of vivaNext, the most visible components of the project include the new roadways, passenger stations and amenities, and streetscape elements such as lighting, sidewalks and landscaping. Ongoing inspections are being done as construction progresses to ensure that these are being built to certain specifications, before they are handed over for use by Viva. Commissioning is a detailed focus on the key systems and components that together make up the overall network.

These components include the fare collection equipment; the station information systems such as the variable message signs, clocks and Public Address systems; passenger security elements such as closed circuit TV systems and emergency call buttons; and the traffic signals at intersections. It also includes the sophisticated Transit Vehicle Detection system, which will provide information to the traffic signals when rapid transit vehicles are approaching intersections, as well as the overall communications system and fibre optic network that links all of these components.

Testing starts at the factory, where the fabricator verifies that the equipment works as it was intended to, and then each component is tested again once it’s installed. Once all the components are installed and each one is confirmed to be working as designed, a series of additional tests are carried out to confirm that the entire system is integrated properly and working together. Don’t forget we have to connect up to the section already open and make sure everything continues to run smoothly.

The final step involves testing the reliability and function of the extended system, including simulating actual operation using buses and staff acting as passengers. This gives the people who will be involved in the future operation, maintenance and service of the rapidway an opportunity to become familiar with the new section.

So you can see that there’s still a lot of work behind the scenes to get to the day we’re all looking forward to – when the Viva bus extends its journey the length of the new rapidway from Bayview Avenue to South Town Centre Boulevard in late August.

Categories
Construction Rapidways

turning on the lights

turning on the lights

Street lights are one of those infrastructure elements that the public may not give a lot of thought to, but in truth their design contributes significantly to the overall streetscape. And because the vivaNext project is being used to transform Highway 7 East from a highway to an urban corridor, all the design components, including the street lights, have been given a lot of thought. But before design considerations can be focused on, safety is the first priority to be achieved with street lighting. VivaNext works with York Region, the local Municipality and the utility companies to develop lighting designs, coordinate and install the lights. Here’s an overview of the role lighting plays in the vivaNext vision, and the street lighting elements you will see installed on all the rapidway corridors.

Designing street lighting, like all the major elements in the vivaNext project, focuses on achieving a combination of practical and design objectives. Lighting is first and foremost a public safety consideration. There are strict national and local standards on how street lighting is designed, including how much lighting is required for different conditions. For example, different measures are used to determine the lighting levels for roadways compared to intersections and sidewalks. Once the levels are known, lighting designers develop a design, which includes variables such as pole height, spacing and “lux,” which is the amount of light to be provided by the fixture.

Once the lighting design is done, streetscape design objectives can come into play in order to marry the technical requirements with the architectural priorities needed to achieve the desired streetscape “look.” In the case of vivaNext, the streetscape objectives are for a modern, stylish and uncluttered look that will contribute to the corridors feeling like urban destinations, and make them distinctive from other Regional roadways.

To achieve all these safety requirements and design objectives, we have selected a special street light pole and luminaire [the light head or fixture], and arm that holds the luminaire, to be used along the Highway 7 rapidway segments. The poles will be a little higher than the ones they’ve replaced [9.9 metres high versus 8.0 metres], and they’re made of metal with a dark grey powder-coat finish for long-wear and less maintenance. Unlike most poles which are octagonal shaped and tapered to the top, these are round and cylindrical for a sleeker, more modern look. And the lighting head or luminaire on top was chosen to complement the sleek, modern look of our canopies.

The street lights also have a photo sensor to automatically turn on and off when it’s dark. And the bulbs – which are little larger than the light bulbs you have in your home – only need to be replaced every 4 years.

So next time you’re sitting at a stop light or at a bus stop and you’re looking at the beautiful new streetscape, you’ll know more about all the decisions that were needed to turn on the lights! Enjoy!!

Categories
Construction Rapidways

bringing the vivaNext long-term plan for the future to life

video - Highway 7 East: summer update 2014

With crews working on the finishing touches on the eastern half of the Highway 7 rapidway, we’re getting closer to the completion of this rapid transit corridor. As much as we’re looking forward to celebrating this milestone, it’s only one [very exciting] step in a long path that started years ago.

There’s a lot of media coverage these days, of transit needs all across the Greater Toronto and Hamilton Area [GTHA], and we’re proud that York Region is actively working to bring rapid transit to our region. In 2002, the Region produced the York Region Transportation Master Plan and the follow-up Rapid Transit Plan, committing the Region to a blueprint of multiple transportation initiatives to be built over the next 30 years.

With approval to the Rapid Transit Plan, we got to work and in 2005 the Viva team launched “QuickStart,” the first phase of Viva service. Viva offered enhanced features that made transit more comfortable and convenient, and put the customer first. With ridership levels increasing steadily, Viva changed the way people in York Region thought of transit and there was appreciation for the higher level of services with enhanced features and frequencies.

But while our new Viva service was a major success and an important first step in encouraging people to try transit, designing the vivaNext rapid transit system was the Region’s long-term vision. Ontario municipalities are mandated to plan sustainable, more intensive land-use as part of the provincial government policy, and rapid transit is a key component in achieving that goal. Anticipating this, the Transportation Master Plan directed that future growth in York Region would be concentrated in new downtowns in Markham, Newmarket, Richmond Hill and Vaughan. By building more intensively in these areas, there would be less pressure for growth in existing neighbourhoods.

These urban centres would be connected by transportation “corridors,” making it easier for people to get around the region and providing transportation options, such as regular transit service. The vivaNext rapidways are being built along the corridors, providing these connections across York Region and into the rest of the GTHA.

Much of the new development being built around vivastations is compact and mixed-use, providing housing, employment, retail, dining, services and recreation, all within walking distance of transit. Developments include more welcoming public spaces, attractive landscaping, and other amenities that contribute to the centres becoming more dynamic destinations.

The plan is well and truly underway, and rapidways are being built on Highway 7 in both the east and west, as well as in Newmarket. The Toronto-York Spadina Subway Extension is under construction, and the designs for rapidways on Yonge Street are being finalized. Great new developments are popping up all over the new urban centres across the Region.

So when the next segment of rapidway on Highway 7 East starts service this summer, we can all celebrate the implementation of the first phase of our transportation and growth management blueprint, not to mention the end of construction! Check out the new video highlighting the Highway 7 East segment.

Categories
Construction Rapidways

signs of progress

signs of progress

We’re really counting down the days to the next section of the vivaNext rapidway service opening on Highway 7 East from East Beaver Creek Road to South Town Centre Boulevard, and we know you are too! You’ll know we’re really in the final stretches of construction once you see Viva buses out on the new section of rapidway starting next week.

YRT\Viva will be doing driver training and testing on the Highway 7 East new section in the City of Markham, starting July 28 for a few weeks.

Training will be provided for everyone who will need to be familiar with the rapidways, the stations and equipment. There will be vehicles out on the rapidway, taking customer service staff and other YRT\Viva staff along the rapidways to test and familiarize themselves with the new section. Regular transit service will continue to pick-up passengers at the curbside stops, while we do the testing and finish paving the new section. Signs directing passengers will be posted at the stops.

The actual operator training will run from 7am to as late as 9pm some nights, seven days a week. During this time you can expect to see Viva buses running up and down the rapidway, and stopping at stations. The training will focus on entering and exiting the rapidway, and especially entering back into mixed traffic under Highway 404 and past South Town Centre Boulevard.

Training will also focus on the new transit signals at intersections, which will provide a single green arrow for transit operations. This signal will be clearly marked as being for transit only, but YRT\Viva operators will be trained to be cautious and on the lookout to make sure members of the driving public are obeying the signals correctly and not turning into the red rapidway lanes.

The trainees are all experienced Viva operators, so they know the route and the vehicle and have been enjoying the first phase of the rapidway that opened last year on Highway 7; this is just another segment of the system now running in its own dedicated lanes. They’re really excited to get going, knowing that there are just few more weeks of construction ahead of them.

 

Categories
General Going Green Urban Planning

hug a tree

Maybe it’s time to rethink the age-old saying “money doesn’t grow on trees.” According to a new report from TD Economics, Toronto’s dense, urban forests are providing more than $80-million of savings and environmental benefits every year. The report looks at Toronto’s urban forest of 10-million trees from an economic perspective, calculating the value each tree provides by saving energy, keeping rain and snow off the streets, and absorbing pollution. Even with maintenance costs factored in, the city’s trees are returning between $1.35 and $3.20 for every dollar spent.

Although the report focuses specifically on Toronto, the value in planting and maintaining trees can be attributed to any city in which you live. In fact, benefits can have more than just monetary value. Beautification, green space for recreation and importance to the residents are benefits that are difficult to calculate or define, yet still contribute to the landscape of a thriving community. The report also found that a mature tree canopy adds significantly to property values, adding yet another layer of economic benefit.

York Region already has plenty of recreational parks and green spaces that enhance the beauty of its towns and cities. The vivaNext projects will further enrich these communities by ensuring plant installation and growth well into the future. In Richmond Hill and Markham alone, approximately 292 trees and 4,910 perennials and grasses will be planted along the Highway 7 East corridor and boulevards.  Our challenge with new plantings is to get them to thrive in the first 2 years, but luckily all new plants and trees come with just that – a 2 year warranty! Further planting and new greenery will also be installed on BRT corridors in Vaughan, Newmarket, and Richmond Hill, once construction is complete. Details about the different types of trees and the selection process can be found in a previous posting.

Our hope is that the growth and maturity of the greenery reflects the prosperous growth of York Region over time. Especially during these warm summer months, get out and appreciate the beauty and colour that surrounds you. Hug a tree!

 

Categories
Rapidways

steamrollers help roll out the transformation on Highway 7

The transformation along Highway 7 in Markham continues and the excitement is building. While we are all happy with the results of the completed section of Highway 7 East, there’s still work to be done on the remainder from Highway 404 to Warden Avenue. We are working hard towards completion and opening of the remaining 5 stations by the end of the year and making the most of every sunny day.

Crews have been busy with road widening, boulevard and centre median work and are now paving.  When you start seeing the steamrollers, you know the job is getting close to being completed.  There are a few steps to rapidway paving work which include street painting of the crosswalks, and paving of the red asphalt for the rapidway.  Right now crews are working on base layer paving from Allstate Parkway to South Town Centre Boulevard, as well as line paving and traffic switching.

Sometimes you may wonder why we’ve returned to an area even though it seemed like we were finished. In fact, what you’re seeing is that we are coming back to complete work which has to be done in layers.  Everything has a sequence and a process to finish the job. Paving requires only a few hours, but new pavement can’t be travelled on right away. We schedule paving work carefully to try to avoid paving during the most congested times of the day.

To minimize overall duration and immediate impacts to motorists, residents and businesses, crews will be working overnight and on weekends – weather permitting. This enables work to be completed in an area or on a piece of the construction that has a higher impact so that crews can then move on to the next section. To ensure safety during paving, police officers will be onsite to direct traffic and assist pedestrians.

The good news to remember is once the final paving is finished, we will be that much closer to opening the next section of the rapidway along Highway 7.  Think sunshine!