Categories
Community Events

Back to school with vivaNext

Drop by our booth at York University to learn how our plans will improve your quality of life.

Viva vehicles on the York University campus.
Viva vehicles on the York University campus.

The rapidways and subway extensions will make it faster and easier for people living and working in York Region to get around. This is especially true for current and future students, faculty and staff at York University. Within the next four years, new rapidway stops in dedicated lanes will be near the campus and within the next six years, two subway stops will be right on the campus. Construction will begin on both of these fully-funded projects within the year.

When complete, not only will you save time getting there, but you’ll save on parking. If you’ve already graduated, then these projects will make it faster and easier for you to get to work and connect with other places.

We will be on campus Sept. 16 for the Annual Clubs BBQ. On Sept. 17, we will be there, joined by all of the other public transit providers in the area plus cycling networks and car share companies, for the Transportation Fair.

Here is some more information about the events we’ll be at.

Annual Clubs BBQ

Date: Wednesday September 16 from 10 a.m. – 5 p.m.
Location: Vanier Field

Transportation Fair

Date: Thursday September 17 from 10 a.m. – 3 p.m.
Location: York Lanes Mall

Categories
Announcements Live-work-play Rapidways Subways

And the new name is…

An artist rendering of what an intersection at the new Vaughan Metropolitan Centre may look like in the future. It is complete with subway and rapidway stops, high rise condos, offices, shops and restaurants.
An artist rendering of what an intersection at the new Vaughan Metropolitan Centre may look like in the future. It is complete with subway and rapidway stops, high-rise condos, offices, shops and restaurants.

The City of Vaughan’s downtown core will undergo a transformation over the next several years. Encompassing 125-acres, development plans include office and residential towers, shopping and entertainment complexes, plenty of green spaces and pedestrian walkways, and, of course, vivaNext rapid transit connections.

In recognition of all the exciting changes to come, Vaughan City Council determined that a change of name – from Vaughan Corporate Centre – was in order to better reflect the true vision and future of this key hub.

This summer, the City held a contest where people were encouraged to submit their suggestions. Almost 1,600 entries were received, including Central Vaughan, Vaughan Gateway, Vaughan Mosaic Centre and Vaughan Nexus.

In the end, Vaughan Metropolitan Centre was chosen as the winning entry by the City subcommittee that reviewed all the submissions, which consisted of business stakeholders and citizens.

“People wanted something that’s easy enough to remember and still reflected what we want to see from the downtown,” said Councillor Sandra Yeung Racco, who chaired the City subcommittee.

To view a video of the future transformation of Vaughan Metropolitan Centre, please click here or visit vivaNext.com.

Categories
Rapidways Subways

Pop quiz for students

All aboard!
All aboard!

If you are a student, you’ll be heading back to school next week so we thought we would get you ready for some of those really hard tests with a little pop quiz. Luckily for you, this is an open book/computer quiz and help can be found on our website and blog.

1) What major university will have two subway stops running by it within the next six years?

2) What College campus in Markham will have a rapidway stop right outside its door within three year?

3) What high school at Warden and Highway 7 will have a rapidway stop outside its doors within three years?

4) What public high school in Newmarket will have a rapidway stop only a short walk away from its doors?

5) What Richmond Hill high school may have a subway stop a few blocks from its doors?

Good work, pencils down.

So as you can see, the rapidways and subway extensions will make it a lot easier for students from many different areas to get to school and travel in to, out of and around York Region.
If you are a student, how will our future projects help you get to school?
Good luck this school year.

Answers: 1) York University 2) Seneca College, Markham Campus 3) Unionville High School 4) Huron Heights Secondary School 5) Langstaff Secondary School
Categories
Rapidways Stations

How level boarding at our new vivastations will further enhance service efficiency

With level boarding, the vehicle will pull up to a raised platform. This greatly increases the time it takes for passengers to get on and off the vehicle making for a faster trip.
This is a rendering of a viva vehicle stopping at a new vivastation. With level boarding, the vehicle will pull up to a raised platform. This greatly decreases the time it takes for passengers to get on and off making for a faster trip.

Viva is already a highly efficient rapid transit service thanks to features such as our off-board fare collection system. It’s going to get even better. In addition to our new vivaNext rapidways – which will take our beautiful blue Viva vehicles out of mixed traffic and put them on dedicated centre lanes so they can safely speed past congested traffic – our new vivastations will feature level boarding.

What do I mean by level boarding? Simply that the platforms at our new vivastations will be raised so they are about the same height as the floor of our Viva vehicles. This, in turn, will speed up the boarding process by eliminating the need for riders to climb steps or lift objects, and for Viva drivers to lower ramps for easier accessibility.

Level boarding is already successfully used throughout the world by other BRT, LRT and subway systems to enhance service efficiency. It only made sense to make it a feature of our new vivastations so that we can get you where you want to go faster and easier, and like never before.

Can you think of other things that might make your rapid transit experience even better?

Categories
Announcements Press Subways

Big step toward starting construction on the Spadina subway extension

Chair Fisch and the other dignitaries pose for cameras in front of a scale model of a tunnel boring machine.
Chair Fisch and the other dignitaries pose for cameras in front of a scale model of a tunnel boring machine.

Lovat, an Ontario-based company that makes tunnel boring equipment, has been awarded a $58-million contract to build four machines that will be used in the construction of the Spadina subway extension.

The announcement was made last Friday, August 7, at the Lovat plant by Ontario Transportation Minister Jim Bradley, joined by MP Bob Dechert, York Regional Chair and CEO Bill Fisch, TTC Chair Adam Giambrone and Lovat President Dick Cooper. Not only does this mean the creation of some 200 jobs in the GTA and a boost to the economy, it signals continued progress on the project as it’s scheduled to open in 2015.

Prior to the announcement, I had the pleasure of joining the group for a bit of a tour of Lovat. We met at one end of their Mississauga plant and walked through to the other end while learning about what’s involved in making tunnel boring equipment. Cameras and reporters were waiting at the end of the tour to hear each dignitary deliver a short speech about the announcement.

It was awe-inspiring to watch the dignitaries being interviewed in front of a massive tunnel boring machine. They’re HUGE. Just take a look at the picture below to see how big they are compared to the people near them.

Lovat has built similar and even larger machines for projects all around the world, from Algeria to Venezuela. “We are pleased to be a part of this significant mass-transit project, as it not only generates jobs and strengthens infrastructure locally, but also highlights Canada’s technological capabilities on a global scale,” said Cooper.

The first two machines are expected to be delivered in the fall of 2010, with tunnel boring to begin shortly after.

York Regional Chairman Bill Fisch speaks to the audience and TV cameras in front of an actual tunnel boring machine last Friday.
York Regional Chair and CEO Bill Fisch speaks to the audience and TV cameras in front of an actual tunnel boring machine last Friday.
Categories
Studies Subways

Metrolinx’s interim report recommends subway over BRT on Yonge

What a transit sign may look like at the Richmond Hill Centre with connections to a subway, YRT and Viva busses, and GO trains.
What a transit sign may look like at the Richmond Hill Centre with connections to a subway, YRT and Viva busses, and GO trains.

Last Friday, Metrolinx released its interim Benefits Case Analysis (BCA) for the Yonge North Subway extension.

The BCA was developed by Metrolinx in collaboration with the City of Toronto, the Regional Municipality of York and the Toronto Transit Commission. The analysis looked at two subway options, and a bus rapid transit option.

Here are the key findings:

  • The subway options have a far greater positive impact on the environment, economy, land development and community than the BRT.
  • The economic impacts of the subway options are considerable – creating 21,800 person-years of employment.
  • Both subway options provide better service and reliability than the BRT. The BRT is not as reliable as the subway and would likely experience substantial overcrowding in peak hours.
  • The BRT is not considered a long term solution.
  • The BRT is likely limited by technology, and would not have sufficient capacity for the long-term needs of the corridor.

The proposed subway extension will meet up with the rapidways along Hwy. 7, which will soon get under construction. The combination of the rapidways and a connecting subway on Yonge St. creates a viable alternative to driving and will make it much easier for people to travel between York Region and Toronto.

While we would like to see the Yonge Subway extension proceed immediately, we know that projects of this magnitude can’t happen overnight. We will continue to work with all stakeholders and analyze the overall network elements, such as GO electrification impacts, the TTC capacity study at Yonge/Bloor, as well as the Downtown Relief Line.

The benefits of this project are significant and long-term. We will continue to work with all levels of government to ensure the funding is in place to keep this project moving forward.

The executive summary of the interim BCA is available here.

Categories
Community Events

Team vivaNext will be at the Woodbridge Italian Festival this weekend

Soccer teams of every description will be out in full force this Saturday, August 1 and Sunday, August 2 at the annual Woodbridge Italian Festival, taking place at the Ontario Soccer Centre, 7601 Martin Grove Road, just south of Highway 7.

The vivaNext team will also be there from 3 to 11:30 p.m. each day to cheer participants on and talk to residents about vivaNext projects, including the Highway 7 rapidway, which will make it so much faster and easier to take transit to events like this one in the future.

In addition to such soccer highlights such as the “VIP Soccer Challenge” between Vaughan City Council and members of the media, festival attendees of all ages can look forward to two spectacular days filled with food, entertainment, fashion, music, games and much more. Plus, if you are there Saturday evening, you will get to see the Miss Woodbridge Italia Pageant. Best of all, admission for everything is free.

We look forward to seeing you there!

Categories
Community Events Ways to win

Thanks to all our visitors for a winning four days at the malls.

A young girl fishes at our Markville Mall Pond last Friday hoping to win one of our cool summer prizes.
A young girl fishes at our Markville Mall pond last Friday hoping to win one of our cool summer prizes.

This past Thursday through Sunday, vivaNext teams were out in full force at various York Region malls including Markville, Upper Canada and Vaughan Mills. Thousands of visitors stopped by our booths to putt golf balls and fish in our ponds for instant prizes like beach balls, flying discs and magnetic puzzles.

Of course, there was also plenty of great chitchat about vivaNext. People were really excited to learn that we’ll soon be breaking ground on the rapidways, which will make it up to 40% faster to get around York Region’s busiest corridors when completed.

If you missed us at the malls, not to worry because you could still win with vivaNext. If you haven’t entered our Next Best Thing To Summer Contest, you have until this Friday, July 31, 2009, to do so.

You could win cool summer gear in one of our daily prize draws plus our Grand Prize of a handy iPod touch® so you can get up-to-date vivaNext construction and project information wirelessly. Good luck to all our entrants!

Categories
Rapidways Stations

Where do you think we should place the bicycle racks?

One possible location for the bike racks is on the platforms as you can see in this rendering.
One possible location for the bike racks is on the platforms, as you can see in this 3D model.

As part of the vivaNext plan, beautiful new vivastations will be built in the centre of the roadway along the rapidways on Davis Drive, Yonge Street and Highway 7, as well as the proposed LRT lines on Don Mills Road/Leslie Street and Jane Street in York Region. From the top down, these vivastations have been designed around you. Among their many features and benefits, they will include bicycle racks for quick and easy transit connections.

Right now, we’re examining where to place these bicycle racks and would like to hear your thoughts. There are basically three options to consider.

Option 1 – Place them right on the platforms. This would allow you to conveniently lock your bicycle up right at your point of departure and simply board the next Viva vehicle. On your return Viva trip, you’ll arrive at the same station, but on a different platform. To get your bicycle, all you’d have to do is go back to the original departure platform.

Option 2 – Place the bicycle racks on the sidewalks at the intersections adjacent to the vivastations.  This option would make it more convenient for you to shop, run errands and meet up with friends after your return Viva trip before picking-up your bicycle.

Option 3 – Distribute the bicycle racks evenly on both the platforms and the sidewalks.

So which option do you prefer? Please take a moment to let us know because here at vivaNext, we value your opinion – even when it comes to bicycle racks!

Categories
Surveys vivaNext.com

Do you think traffic congestion is getting worse in York Region?

In a recent blog posting, we told you about a survey jointly conducted by the Ontario Ministry of Transportation, the City of Toronto and the Regions of York, Durham, and Peel. It found that average speeds on highways and roadways in and around the GTA, especially along Highway 7, are decreasing due to traffic congestion and that the average vehicular trip now takes 11% to 21% longer than the exact same trip in 2002.

So what do you think? Do you agree with these findings?

Take a moment to cast your vote in our latest online poll. It can be found on any page of this blog near the top of the right side column or on the right side column on various pages of our website.

Speaking of our online poll, do you have a transit-oriented question you’d like to see asked in one of our upcoming polls? If so, please be sure to let us know. As with this blog and our Twitter and Facebook pages, we value the feedback we receive from you through our online polls!