Categories
Subways Urban Planning

subway in the GTA: where & when to build

subway in the GTA: where & when to build

With the launch of the #YongeSubwayNow petition and campaign for full funding of the Yonge Subway Extension, there has been a lot of conversation around where subway should be built, and whether the Yonge Subway Extension or Downtown Relief Line should be built first.

At York Region Rapid Transit Corporation [vivaNext] we’ve been leading the design and engineering studies for the Yonge Subway Extension, so we have a few thoughts on these important topics.

 

considering the options

To some it might seem as if the Yonge Subway Extension is a new plan, but really it’s been in the works for many years, and it’s pretty far along. It was first included in York Region’s Official Plan over 20 years ago in 1994. The Environmental Assessment was completed and approved way back in 2009, and in 2012 the Conceptual Design Study was completed and approved by TTC and York Region.

This isn’t a blind push for a subway – we’ve looked carefully at the options. LRT and dedicated BRT lanes were considered, but due to factors such as narrow road space and high ridership, only a subway will work here.

 

building in parallel

Transit should not be a York vs. Toronto issue. Instead, the focus should be on what investments will contribute best to helping people get where they need to go conveniently and most cost-effectively. That’s why, for example, we think both the Yonge Subway Extension and the Downtown Relief Line need to be built. And we know the Province of Ontario agrees, because both projects are on Metrolinx’ list of top priority projects. In fact, a relief line that reaches all the way to Sheppard Subway would be particularly helpful to the Yonge Line, especially if a rapid transit connection can be added later to travel north from Sheppard.

Transit expansion benefits people on both sides of our municipal borders. Today, we see a significant number of travelers headed northbound in the AM period to a growing number of jobs in York Region. Cross-boundary transit reduces traffic congestion on GTA roads, and increases the pool of customers and skilled employees for Toronto businesses.

With the current state of transit in the GTA, transit projects that are as important as these shouldn’t be built consecutively. Projects like these typically take at least 10 years to design and build, so they should be built in parallel. We can’t wait for one to be complete before starting another.

A GTA transit network means expanding options and crossing borders. It means we have to move forward with as much transit as possible, in the places where it’s needed. And we can all benefit from that.

 

Categories
Rapidways Subways

in continuous motion

in continuous motion

At this point in building York Region’s rapid transit system, we can officially say there are projects at every stage. A few rapidway projects and transit facilities are open for service, some are well underway and some are just getting started.

Having projects at different stages can be beneficial. We learn from every project and fine-tune important processes like procurement, financial management and construction scheduling. Special attention is paid to tailoring detailed designs to ensure quality, and scheduling construction to keep impacts to a minimum. Project management is what we do, and to get everything done, we stack the deck with technical knowledge and lots of experience.

Bus Rapid Transit

With 34.6 kilometres of dedicated lanes for Bus Rapid Transit [rapidways] completed or underway we have lots on the go, but there is also much more to do. The remaining half of rapidway projects – 34.2 kilometres – have Environmental Assessments completed and are ready to move forward once funding is in place. This includes completing Highway 7 rapidways in eastern Markham and western Vaughan, and Yonge Street rapidways between Richmond Hill and Newmarket, and north of Davis Drive.

Yonge North Subway Extension

York Region’s highest priority, the Yonge North Subway Extension, is ready to move to full engineering and construction. This 7.4-kilometre extension from Finch subway station to Highway 7 in Richmond Hill will include five stations and will complete a missing link in the GTA transit system. The Yonge Subway Extension has been identified by Metrolinx as a priority project, and the Environmental Assessments and some important studies are complete, so once Provincial funding is confirmed for preliminary engineering this project will be moving forward to this important next step.

As with any great transit system, our projects are in continuous motion. Our experience allows us to think ahead, in planning for each project, and in building a connected transit system for those who live, work or commute in York Region. To help plan the transit system in the GTA, Metrolinx is hosting a series of public meetings in York Region and Toronto in the next five weeks. We’ll be there too, so be sure to drop by our booth.