Categories
Construction Live-work-play Rapidways

vivaNext – more to come

When it comes to the future of transit in York Region, you don’t have to look far. The first rapidway along Highway 7 east corridor is now up and running smoothly. With it came wide pedestrian-friendly boulevards, lined with trees and other greenery. The transformation taking place along the Viva routes will change how pedestrians, cyclists and motorists not only view the area in general, but get from A to B more easily, more safely and more efficiently.  Check out this 3600 virtual tour for a peak.

This is just the beginning of many miles of rapidway that are under construction or coming soon.  Here is an update of what’s happening.

Construction on Highway 7 East continues and crews are working hard from Highway 404 to Warden Avenue to widen the road, build pedestrian boulevards, plant trees and shrubs as well as installing utilities. This next segment of rapidway is expected to be completed in 2014.

Moving along Highway 7 west to Vaughan, you will see the vivaNext rapidway construction starting to take shape between Edgeley Boulevard and Bowes Road.  Over the last few months, crews have been working to remove signs, test soil and begin utility relocation to prepare for heavier construction.  Throughout the fall and winter, hydro, gas and telecommunications installations and relocations will continue in Vaughan.

Preliminary construction activity will also continue in other parts of Vaughan as vivaNext rapidway construction continues along Highway 7 West.   The Vaughan Metropolitan Centre [VMC] station will be completed in time with the Toronto-York Spadina Subway Extension [TYSSE].  Vaughan’s VMC station will be the northernmost subway station, connecting to Viva and a variety of other transit services, for a convenient and seamless experience.

In Newmarket, as you drive or walk along Davis Drive, you’ll see that construction is in full swing and the transformation is starting to take shape. The relocation and replacement of underground infrastructure in some segments on the south side of Davis Drive is complete. In those sections, road widening and preliminary paving has started preparing the roadway for future rapidways.

Also in Newmarket, crews are working to re-locate the Historic Union Hotel and its adjoining building to their final foundations this fall. Extensive culvert work at eastern and western creek is underway.  Work continues on the north side of the Keith Bridge.  Once completed all this work will help make your travel along Davis Drive smoother and more efficient, especially if you are on transit!

Over the next few years, future rapidways will be added to the Viva routes to better service customers and make travel times shorter by up to 25%.  We know construction is messy, but the end results are marvelous!

Categories
Community Events

win with vivaNext at the Newmarket Farmers’ Market

Join vivaNext this Saturday, October 5 at the Newmarket Farmers’ Market. Stop by the vivaNext booth and say hello! While you’re visiting, complete a ballot for a chance to win one of five vouchers from a Davis Drive business of your choice. Click here for contest rules and regulations.

Harvest season has arrived and there’s no better time to reap the benefits of fresh produce while having fun at your local farmers’ market. There’s lots to see and do! The market has top-quality farm-fresh products, home-made baking and handmade crafts. This Saturday, attendees will enjoy the musical stylings of country & western band, the Dustaleros.

Treat your senses — experience the colors, smells and tastes of the Newmarket Farmers’ Market. The vivaNext team looks forward to seeing you there.

 

Categories
Rapidways Stations

this is just the beginning

Over the next three years, the vivaNext system is really going to be taking shape, with rapidways on Highway 7 and Davis Drive opening for service, and the Toronto York Spadina Subway Extension [TYSSE] welcoming its first passengers.  But these new transit options are only the beginning of expanding vivaNext network that’s being built for York Region commuters over the next few years.

Funding for the next priority series of rapidways is already lined up, and we hope to be confirming funding soon for a number of other high priority projects.  Here’s the rundown on what’s planned, and how your transit choices are going to be widened over the next few years as vivaNext continues to expand.

Rapidway projects are being built in the order that will create the most connectivity for the greatest number of people and get you past the worst traffic congestion.  Check out the map to see how the phases are rolling out.

The segments that are coloured pink on the map are what we’re currently building and include the rapidway on the East part of Highway 7, from Yonge Street to Warden Avenue, and the rapidway in Newmarket along Davis Drive from Yonge Street to Highway 404.

In the pink project bundle, we’re in the preliminary construction stages for a 36 km stretch of rapidway on Highway 7 West including a station at the Vaughan Metropolitan Centre [VMC].  This station and rapidway will be opening in time to connect viva passengers to the Spadina Subway Extension when it opens for service in 2016.

The blue projects run north on Yonge Street. We’re currently in the procurement phase for the first stage of two rapidway segments between Richmond Hill and Newmarket.  One stretch will whisk passengers north from the Richmond Hill Centre up to 19th Ave / Gamble.  The other stretch starts at Mulock Drive in Newmarket, and will connect to the new rapidway along Davis Drive.  Construction of these rapidways is expected to be completed in 2017.

But that’s not all – look at the orange segments on the map.  These segments are also all designed and funding is committed, with planning well underway for construction to start in 2015.  Orange projects include two rapidway segments on Highway 7 West, which will extend on either side of the VMC rapidway. When it’s complete in 2018 this whole section will run over 15 km from Helen to Yonge Street. Another orange project will extend the Highway 7 East rapidway from the existing Warden Station on Enterprise Boulevard, to Unionville GO Station.

Other projects that will eventually create a full network across the Region and connecting to other transit systems are grey on the map. Since we don’t have funding secured for all of them yet we can’t confirm the actual timing.

Of these unfunded segments, two are the top priority.  The first priority is the Yonge North Subway Extension, which will provide a critical link for passengers transferring between the vivaNext system and the TTC.  Without this connection, vivaNext is missing a critical link that will really make our system a key part of the larger Greater Toronto transit network.

Another key priority is a rapidway along Major Mackenzie Drive, which would provide a major transit artery for all the growth taking place in that area.  The Major Mackenzie rapidway would provide passengers with connections to the TYSSE, GO lines in both the east and west, and the viva Highway 7 rapidway in both the east and west.

Imagine how this wonderful rapid transit network would make your life easier?  We are working hard to bring it to life, so that everyone in York Region will have the choice to leave their car at home and hop on board viva for a fast, reliable and comfortable ride, no matter where they want to go.

 

Categories
General Live-work-play Rapidways Urban Planning

need some retail therapy? ….your neighbourhood shops are open

We’ve all heard the term “retail therapy.” For some, shopping can be a remedy to cheer us up and for other’s it’s a way to relieve stress. Perhaps as you read this, you can relate to doing some of your own retail therapy at one time or another.  Whether we’re shopping for a pick-me-up, or need a few items from the store, I’m sure we can all agree there is nothing better than stopping at a good restaurant or finding a little boutique around the corner.

The businesses along the vivaNext rapidway corridors are a great example of the variety of unique restaurants, professional offices, and boutique shops available within your local community. No matter what the stage of transformation– in the heart of construction on Davis Drive, just starting construction on Highway 7 West, getting ready for construction on Yonge Street and completing the transformation of Highway 7 East, there is no change to how any of these businesses serve you.

As you drive or walk along Davis Drive and Highway 7 East you’ll notice the Shop Davis and Shop 7 billboards. These road signs are just one component of a broader advertising campaign in support of your local businesses. During construction along Highway 7 West and Yonge Street you’ll also see Shop billboards along these corridors, to help remind you to support your local retailers.

Perhaps you’ve even seen vivaNext staff out and about in your neighbourhood promoting your local businesses. As part of the shop local campaigns, you may have received a reusable shopping bag to use when you visit stores in your community. If you see a vivaNext staff member, come by, say hello and pick up your reusable shopping bags [while quantities last]. Your local businesses and vivaNext have you covered the next time you are out shopping in the neighbourhood.

To get to your favourite stores on Highway 7, why not take a ride on the new rapidway. The dedicated centre lanes for viva vehicles are now open on Highway 7, from Bayview to Highway 404 and will provide riders with faster, more consistent travel times, getting you to your destination faster so you can shop till you drop!  The new urban landscape and lovely boulevards are a great incentive to visit these revitalized areas in Markham and Richmond Hill. Stop by for some shopping or just stroll around, because these are great places to visit.

Whether you’re shopping for back to school, meeting friends for dinner, or buying a gift for that special someone, your local retailers and restaurants are open for regular business throughout vivaNext construction. To see a sample of the business offerings provided by your local retailers check out the business profiles section of the vivaNext website at vivanext.com

 

Categories
Construction General Rapidways Uncategorized Urban Planning

Your Community Liaisons

You might recognize Nimisha Raja, Carrie Slattery or Michelle Dudzik, our community liaisons from Markham, Newmarket and Vaughan/Richmond Hill respectively, from our website or the construction bulletins you’ve signed up for or you may have met them at a vivaNext event.

But, we also have a new face joining forces with our three existing liaisons –  Tamas Hertel, the Community Liaison Specialist on Yonge Street in Richmond Hill and Newmarket. Over the past four months he has been quite busy.  Tamas has been making contact with businesses and residents along Yonge Street as preparation for future rapidway construction.

They are all readily available to answer any questions or assist you with everything related to the vivaNext project. You name it, whether you’re a property owner, business operator, tenant, special interest group, or any other interested stakeholder in York Region along the viva rapidway corridors, they are happy to hear from you.

All four of our Community Liaisons spend a lot of time out in the community, making presentations and answering questions about construction schedules and the projects in general. And with project information centres open in both Newmarket and Vaughan, you have more opportunity to stop by and meet your Liaison – check for the hours here.

We hope that our website, Facebook page, or construction bulletins continue to help you find answers to your questions. But if you would rather speak to someone, or you’re wondering about your specific property, Nimisha, Michelle, Carrie or Tamas are available and happy to talk to you.

Markham:
Nimisha Raja
Community Liaison Specialist
Telephone: 905-886-6767 Ext. 1023
1-877-464-9675
Cell phone: 416-712-8938
Email: nimisha.raja@york.ca

Newmarket:
Michelle Dudzik
Community Liaison Specialist
Telephone: 905-886-6767 Ext. 1096
1-877-464-9675
Cell phone: 905-716-7663
Email: michelle.dudzik@york.ca

Vaughan:
Carrie Slattery
Tel: 905.886.6767 Ext. 1129
1-877-464-9675
Cell: 289.716.0091
Email: carrie.slattery@york.ca

Yonge Street, Richmond Hill and Newmarket:
Tamas Hertel
Tel: 905.886.6767 Ext. 71357
1-877-464-9675
Cell: 905.505.1430
Email: tamas.hertel@york.ca

Categories
Construction General Rapidways Uncategorized Urban Planning

See the Keith Bridge transformation

If any of you have been out and about along Davis Drive, around the Tannery then you probably noticed construction taking place on the north side of the Keith Bridge.  The old bridge was completely demolished to make way for a new one.  Construction has been done in two phases – the south side first and the north side second.

The demolition of the north side was caught on tape. It has been made into a short time lapse video so that you can watch the whole thing. As you will see in the video, bridge demolition takes careful planning and organization.  Take a look. We may be biased but we think it’s a tad mesmerizing as the cranes do their “dance”.

When complete in 2014, the Keith Bridge will be an architecturally designed, historically-motivated focal point along Davis Drive. It will reflect Newmarket’s rich heritage and growing community, making it an even better place to live, work, shop and play.

Click here to check out the time lapse video.

Categories
Construction Uncategorized Urban Planning vivaNext.com

Preserving the Union Hotel

With a population of only 2,000 people, Newmarket became an official town in 1880. The Union Hotel located at 425 Davis Drive was built soon after and remains an important part of Newmarket’s heritage.  The two-storey brick structure was designed by local architect John Ough and still has many of its original features, including mouldings, staircases and woodwork. Past owners include James Burke, a soda water manufacturer, Patrick Hodgins Sr. used it as a store and residence and more recently Robert Armstrong, had a real estate business.

We had the pleasure of chatting with Patrick Hodgins Jr. in 2010 about his memories of living at the property. From 1907 to 1940, his family played a big role in shaping this important corner of Newmarket.

Newmarket has since grown and now has 84,000 residents. To allow for the widening necessary to accommodate the vivaNext rapidway, the Union Hotel and the neighbouring two-storey concrete block building, are being set back on the same property, to preserve them as a reflection of Newmarket’s rich history.

Due to the nature of the work the buildings will be moved in two stages. The full relocation to the permanent location may take up to six months. Check out the steps involved or just follow construction as it unfolds along Davis Drive at vivanext.com.

 

Categories
Community Events General

Come visit us at the spring home shows!

Despite the last futile attempts of winter to hang on, spring has sprung — buds are popping up on the trees and birds are chirping in celebration — change is everywhere. With spring, thoughts often turn towards home projects or renovations. If you’re dreaming of a fresh look to any part of your home then there’s no better place for you to go than one of your local home shows where anything and everything you’ll need is in one place.

The warmer weather also brings with it a busier construction schedule on the Regions roads. If you’re at the Newmarket Home and Lifestyle Show this weekend, the Aurora Home Show next weekend or the Richmond Hill Home & Garden Show the first weekend in May, stop by and visit. We’ll tell you what’s new on our projects in Markham, Newmarket, Vaughan and Richmond Hill. Like renovating your home, the construction projects vivaNext has underway will bring long-term benefits. Our construction projects are bringing change to York Region in the form of rapidways — dedicated lanes for viva vehicles. Rapidways will make it faster and easier to travel in York Region, and will set the stage for great destinations to live, work, shop and play.

The shows are each host to over 150 vendors. Meet with renovation or home decor expert, take part in a workshop or two or enjoy some lively entertainment.

Looking forward to seeing you there!

Newmarket Home and Lifestyle Show:

Friday, April 5, 4pm-9pm
Saturday, April 6, 9am-5pm
Sunday, April 7, 10am-5pm
Magna Centre, 800 Mulock Drive, Newmarket

Aurora Home Show:

Friday, April 12, 4pm-9pm
Saturday, April 13, 9am-6pm
Sunday, April 14, 10am-5pm
Aurora Community Centre, 1 Community Centre Lane, Aurora

Richmond Hill Home and Garden Show

Friday, May 3, 5pm-9pm
Saturday, May 4, 9am-6pm
Sunday, May 5, 10am-5pm
Sports Complex, Richmond Green Park, 1300 Elgin Mills Road East, Richmond Hill

Categories
Construction Rapidways vivaNext.com

Davis Drive rapidway – construction ramps up

Signs of spring are in the air, for us at vivaNext spring symbolizes a time of year when construction work ramps up. Last year, we completed a number of important construction projects on the way to building the Davis Drive rapidway. This year, we kick off a very busy construction season with significant work starting in April.

Traffic lanes, sidewalks and bus stops will be shifting along Davis Drive, this is required to relocate, install and replace segments of infrastructure for hydro, gas, storm drain, water main, sewer line, phone and cable. These changes are part of the next phase of construction, providing workers sufficient room to start building the rapidway, station platforms and canopies. More details on the lane closures on Davis Drive are available at vivanext.com.

Crews will also be working on culverts on the south side of Eastern Creek (near Southlake Regional Health Centre) and Western Creek this year. The north side of Keith Bridge is scheduled to be complete in 2014.

We know construction can be daunting and we thank you for your patience and understanding. Please drive with care and give yourself extra time to get to your destination safely.

Updates about all of this work will be made available as they happen. If you have questions or concerns please contact your Community Liaison and sign up for construction updates to get the the latest construction information.

The vivaNext plan will help Newmarket continue to shape its growing community making it an even better place to work, shop and play.

Categories
Construction Rapidways

Putting a new face on the old Keith Bridge

If you’ve been driving along Davis Drive recently, you’ve noticed the lane shift onto the new south side of the Keith Bridge, just east of the Tannery and the Seniors’ Meeting Place. In fact, if you’re on Davis Drive regularly you’ve seen the lane shifts for a few months.

Now that we’ve had time to do our preparatory work, we’re ready to start the next phase of bridge work. This week, the north side of Keith Bridge is being demolished so that we can rebuild and join it to the south side, completing the bridge. The demolition of the bridge will happen in two stages over the course of about one week – first the east half and then the west. Then the real work begins – building the bridge from the riverbed up to the road.

With all this work to do you may be wondering why we’d choose to start in the winter, instead of the spring or the summer. The bridge, named after William Keith, a Newmarket Reeve, an MPP and a Senior Magistrate in the early 1900s, spans the Holland River. Fisheries and Oceans Canada sets out specific timing for heavy construction [such as demolition] in and around water so that the spawning migrations of fish aren’t disturbed. We looked very closely at the factors and the timing involved before deciding that now is the best time to get the demolition done while not disrupting the fish.

Finishing the new Keith Bridge, complete with historic architectural features, in 2014 is a major part of the Davis Drive transformation. The new bridge will reflect Newmarket’s rich heritage and growing community, making it an even better place to live, work, shop and play.