Categories
Rapidways Stations

this is just the beginning

Over the next three years, the vivaNext system is really going to be taking shape, with rapidways on Highway 7 and Davis Drive opening for service, and the Toronto York Spadina Subway Extension [TYSSE] welcoming its first passengers.  But these new transit options are only the beginning of expanding vivaNext network that’s being built for York Region commuters over the next few years.

Funding for the next priority series of rapidways is already lined up, and we hope to be confirming funding soon for a number of other high priority projects.  Here’s the rundown on what’s planned, and how your transit choices are going to be widened over the next few years as vivaNext continues to expand.

Rapidway projects are being built in the order that will create the most connectivity for the greatest number of people and get you past the worst traffic congestion.  Check out the map to see how the phases are rolling out.

The segments that are coloured pink on the map are what we’re currently building and include the rapidway on the East part of Highway 7, from Yonge Street to Warden Avenue, and the rapidway in Newmarket along Davis Drive from Yonge Street to Highway 404.

In the pink project bundle, we’re in the preliminary construction stages for a 36 km stretch of rapidway on Highway 7 West including a station at the Vaughan Metropolitan Centre [VMC].  This station and rapidway will be opening in time to connect viva passengers to the Spadina Subway Extension when it opens for service in 2016.

The blue projects run north on Yonge Street. We’re currently in the procurement phase for the first stage of two rapidway segments between Richmond Hill and Newmarket.  One stretch will whisk passengers north from the Richmond Hill Centre up to 19th Ave / Gamble.  The other stretch starts at Mulock Drive in Newmarket, and will connect to the new rapidway along Davis Drive.  Construction of these rapidways is expected to be completed in 2017.

But that’s not all – look at the orange segments on the map.  These segments are also all designed and funding is committed, with planning well underway for construction to start in 2015.  Orange projects include two rapidway segments on Highway 7 West, which will extend on either side of the VMC rapidway. When it’s complete in 2018 this whole section will run over 15 km from Helen to Yonge Street. Another orange project will extend the Highway 7 East rapidway from the existing Warden Station on Enterprise Boulevard, to Unionville GO Station.

Other projects that will eventually create a full network across the Region and connecting to other transit systems are grey on the map. Since we don’t have funding secured for all of them yet we can’t confirm the actual timing.

Of these unfunded segments, two are the top priority.  The first priority is the Yonge North Subway Extension, which will provide a critical link for passengers transferring between the vivaNext system and the TTC.  Without this connection, vivaNext is missing a critical link that will really make our system a key part of the larger Greater Toronto transit network.

Another key priority is a rapidway along Major Mackenzie Drive, which would provide a major transit artery for all the growth taking place in that area.  The Major Mackenzie rapidway would provide passengers with connections to the TYSSE, GO lines in both the east and west, and the viva Highway 7 rapidway in both the east and west.

Imagine how this wonderful rapid transit network would make your life easier?  We are working hard to bring it to life, so that everyone in York Region will have the choice to leave their car at home and hop on board viva for a fast, reliable and comfortable ride, no matter where they want to go.

 

Categories
General Rapidways

enhancing your security and safety

Taking steps to ensure our passengers feel secure and safe using our stations is a top priority for YRT\Viva.  So every detail of our new passenger stations on the Highway 7 rapidway has been designed with a view to make our riders feel comfortable, well protected from the elements and adjacent traffic, and able to access help in an emergency.

Here’s a rundown of the new features we’ve designed into all our stations, so all users can enjoy a personal sense of safety.

With our median platforms located in the middle of a busy roadway, one of our top priorities has been to make the stations feel like a safe haven.  Stations will provide a secure waiting place for passengers with a concrete barrier wall running all along the traffic side, and a glass guardrail beyond the canopy.

To access the new stations in the median, pedestrians must use the crosswalks and cross with the signal.  When crossing the road to or from the new station, you must remember to push your pedestrian button to get the signal to cross safely.  Also, because this is new for everyone, it is important that pedestrians watch for traffic before stepping out to cross the road.  Whenever there are changes, it is important to be aware of all the users to the roadway to ensure your safety at all times.

Our stations reflect the CPTED (Crime Prevention Through Environmental Design) principles of transparency and good lighting, enabling people to see and be seen. We’ve paid careful attention to lighting levels, including along the platform and in the glass enclosure, which is fully visible to the platform and has doors at either end.

Each platform is well equipped with electronic security devices, overseen 24/7 by YRT\Viva staff at transit headquarters.  Stations are monitored constantly by three CCTV (Closed Circuit Television) cameras.  In addition to providing good coverage of the platform at all times, transit staff can maneuver the cameras manually as needed.

To add to passenger’s sense of security, a clearly marked Emergency Call Button is located inside the glass enclosure, and its speaker provides immediate two-way contact between the caller and YRT operators.  The audio of the call is recorded and time-stamped, as is the video that is automatically captured by the closest camera when the button is pushed. When the ECB is pushed, blue strobe lights on the VMS and on the ECB will be triggered to indicate to passing emergency services that assistance is needed, and transit staff will dispatch emergency services if required.

Also adding to these new features is the PA system that will be used to provide live and recorded public announcements from transit operations.

These new features are probably things that most people will never need to know about.  All the same, knowing that we’ve gone to great lengths to maximize our passengers’ sense of safety, and that our transit staff are on duty 24/7 behind the cameras, should give all our riders total peace of mind.  Be safe!

Categories
General Live-work-play Rapidways

making your trip more comfortable across the YRT\Viva system

You already know how excited we are to be introducing you to our new vivaNext rapidway system, with its comfortable and convenient stations and amenities, now open on Highway 7.   But for many transit riders across York Region, you’re YRT riders as well, and your comfort on that part of your commute is just as important to us.

YRT is currently carrying out upgrades to all their curbside stops across the YRT system to add new amenities and freshen up existing ones.  If you’ve been to the YRT stop at 16th Avenue and Warden you’ll already have seen the prototype that’s going to be installed everywhere.

Each YRT stop will get a modern new shelter, which will provide superior protection from the elements.  And for more comfort, each station will have new benches and garbage containers.  More and more people are choosing to commute by bike but if biking part-way then jumping on YRT\Viva suits you better, YRT is installing bike racks at each stop so you can leave your bike with confidence until your return.

YRT is going to be working their way through the entire system across the Region to upgrade all the YRT stops over the summer, with the Highway 7 rapidway sections being the first to change over to the new amenities this summer.  With the rapidways now open and the new YRT local stops being refreshed, Highway 7 has taken on a refurbished look and feel that highlights York Region’s commitment to serving its residents. Check out this video

These upgrades will bring a new level of comfort to YRT riders, and show the commitment YRT\Viva has to providing all its riders with a great customer experience, no matter what route they’re taking.  We encourage you to come visit the area!

Categories
Rapidways Stations

getting to where you want to go

The installation of the new dedicated rapidway along Highway 7 has resulted in some important changes to the way drivers will get to their destinations, and how the traffic signals work.  Some of these changes have already become familiar to drivers during the construction phase, but it’s worth going over them again now that the Rapidways are open from Bayview Avenue to East Beaver Creek.

  1. Watch for your signal.
  2. There are several different signal phases now operating along Highway 7, and drivers need to be extra alert to pay attention.  The left turn arrow, transit arrow and through traffic signals all work together to keep traffic moving safely.  Pay careful attention to the signal for your lane and the movement you want to make. Watch for pedestrians in the middle if you are making left hand turns or U-turns.

  3. Left turns only during the left turn arrow.
  4. With the rapidway down the middle of the roadway, drivers cannot make left turns mid-block.  Left turns are only allowed from the left turn lane at intersections, on a dedicated left-turn green arrow.  White lines clearly show the left lane turn.  No left turns are allowed on the through green light phase, or the transit green arrow.  Special detectors in the pavement will help the light know how many cars are waiting to turn left, but depending on the length of the queue you may need to wait more than one cycle to make your turn.  If there are no cars detected at a specific time, there will not be a left-turn arrow in that cycle.

  5. U-turns are allowed during the left turn arrow.
  6. If you want to get to a destination on the other side of the road, you can make a u-turn at the intersection when the left turn arrow is lit.  It is important to make sure you turn into the main traffic lanes going in the other direction rather than into the rapidway.  To make it obvious, rapidways are tinted red and have special bus-only markings on them.  U-turns, like left-turns, cannot be made on a through green light, or when the transit arrow is green.

  7. Transit green arrows are for buses only.
  8. The vehicles using the rapidway have their own signal, which is located directly in front of the rapidway.  This signal is only for buses, and depending on the circumstances, it may or may not coincide with the through green light for traffic.   The transit signal has a special hood over it so it can only be seen by transit drivers.  But whether or not a transit vehicle begins to move through an intersection, other drivers must wait for their own green light before proceeding.

  9. Be careful making right turns at red lights, watch for signs.
  10. There are some changes to right turns on Highway 7 from side-streets. At some intersections (East Beaver Creek, Chalmers and Valleymede), right turns on a red lights are no longer allowed. Drivers need to watch carefully for signage indicating that right turns on red, are no longer permitted. These signs are located on the traffic signal pole. Drivers turning right need to be especially alert watching for bikes using the new bike lanes and bike boxes, and when making right turns past YRT buses stopped at curb-side stops.

Highway 7 is a busy street and safety for everyone using it is a top priority.  All these changes work together to get everyone where they want to go safely and in good time.

Categories
Announcements Rapidways Stations Urban Planning

the future of transit has arrived!

The launch of the first section of the rapidway along Highway 7 from Bayview Avenue to Highway 404 is this Sunday, August 18.

Riders can now board viva in the centre lane rapidway.  Vivastations are directly accessible from crosswalks at signalled intersections.  Pedestrian signals come with an audible tone and visual countdown.  During the first week of new service the YRT\Viva teams will be on the street to assist customers and answer any questions to help familiarize everyone with the new system.

Not only is this section of Highway 7 now more efficient for pedestrians, cyclists, riders and drivers, but the landscape has been transformed with new trees and other greenery. We welcome the wide pedestrian-friendly, tree-lined boulevards and sleek, modern, vivastations. The new vivastations will be open at Chalmers, Valleymede, West Beaver Creek, Leslie, and East Beaver Creek. Vivastations at Bayview will open in early September. An additional 3.9 kilometres of rapidway along Highway 7 from Highway 404 to Warden Avenue will open in 2014.

New dedicated centre lanes for viva vehicles will allow riders to enjoy faster and more consistent travel times.  Also drivers need to be aware of the changes to the street as they make turns onto Highway 7, red asphalt indicates a bus only lane.  Emergency vehicles are permitted to access the rapidways should they need to, but they will have their flashing lights on for safety.

The stations include arched glass canopies inspired by transportation architecture from historic and modern European examples. The 27-metre glass canopy offers protection from the elements, including a nine-metre enclosed and heated waiting area. The stations include all the existing viva technologies we love, including off-board fare collection, GPS navigation, real-time information, Presto, new card readers and traffic signal priority. Safety and accessibility features include textured surfaces near platform edges, level boarding from the platform to the bus, a public address system for updating riders and an emergency call button.

The York Viva BRT project received $1.4 billion from the province, and is an example of The Big Move in action – Metrolinx’s 25-year plan to implement a common vision for transportation in the Greater Toronto and Hamilton Area.

The transformation of this urban corridor will help support growth, and reduce congestion to help make York Region a more inviting place to live, work, shop and play.

Come take a ride on the new rapidway and check it out! Tweet and let us know what you think!

 

Categories
Live-work-play Rapidways Stations Urban Planning

planting for beauty and longevity

One of the wonderful new elements of the vivaNext streetscape is the number and variety of new plants that are being added, from the planters on the stations and in the median, to the trees and shrubs being planted along the boulevards and intersections.  The Landscape Architects, in conjunction with York Region’s Forestry Department, have worked long and hard on which plants will be included at each location.  Here’s what you’re going to be seeing planted along the rapidway corridor, and how they made their choices.

All the plant selections have been made with maximum survivability and sustainability in mind.  That means plants have to survive the urban conditions they’ll be surrounded by – with the main threat being the de-icing salt that needs to be used on the roads in winter.  Salt is toxic to many plants, so finding plants that can cope with having salt spray on their leaves and stems over the winter is a key consideration.  Plants also have to survive the wind and drought conditions that are part of being next to a roadway.  Another consideration for species selection concerns trees for planters under hydro lines.  In these locations, we need to find species with a maximum size and shape that will allow them to grow to their full potential, without needing to be pruned away from the lines.

Fortunately, York Region’s Forestry Department has had a lot of experience with the plants that thrive in the Region so coming up with lists of viable plants was straightforward.

Other considerations were related to the basic elements of design: shape, scale and colour.  We had clear overall design objectives to work with, consistent with the larger vivaNext aesthetic: the look was to be urban, stylized, and modular, similar to the look of our pavers.

Here are some images of our plants, including deciduous shrubs, evergreen shrubs for winter interest, hardy roses, ornamental grasses and perennials.

And to give them the best chance for survival, they will be planted in a special planting mix developed by the Region’s Forestry Department that will provide the optimum growing conditions.  Each tree will have a full 16 cubic metres of soil – that’s about the same amount as two dump truck-loads!

We’re looking forward to having people see the new landscaping, and we know it’s going to make a huge contribution to our goal of creating a more attractive, welcoming streetscape.  With the waving grasses and flowering plants, and shapely trees and shrubs, these public spaces will be more beautiful for years to come.

 

Categories
Construction Rapidways

the communications brain behind our rapid transit system

In other posts I’ve talked about the various ITS components behind our Bus Rapid Transit along Highway 7. But none of these pieces would be able to do its job without being connected to the others through a sophisticated fibre optics communications system.  Although it’s hiding underground, this communications system is really the unsung hero that’s going to put the rapid in our rapid transit system.   Here’s how it’s going to work.

As I’ve described before, there are several transit priority measures that will help viva vehicles on the new Highway 7 rapidways run smoothly and quickly through congestion.  These include on-board components on each vehicle including a GPS system and transmitters.  There are also the components at each intersection that help each traffic signal respond to changing traffic requirements including radio and infrared receivers that pick up signals from approaching buses and emergency vehicles, and loop detectors in the roadway that detect cars waiting at the intersection.  Lastly, there are the variable message signs (VMS) located at each platform that provide next-bus arrival information to customers.

As high-tech as each of these components is, none can be effective unless it can communicate with the others.  Each one also needs to be connected to the overall transit system which keeps track of the schedule for each bus, and which determines when the traffic signal phasing requires a temporary adjustment to let a delayed bus get back on schedule.

The connection is provided through a fibre optics communications network that links all of the intersection and every vivastation to YRT’s transit operations and York Region’s traffic operations.

This system is fully automated, with approaching vehicles alerting intersections that they are arriving, and each intersection sharing that information with the central traffic control system, which in turn compares that information with the transit schedule.  The system will continuously adjust and fine-tune to ensure the buses stay on schedule, while keeping the roads and intersections working well for everyone.

To enhance passenger safety, each station is equipped with cameras to monitor the platforms, a public address system to provide announcements and an emergency call box for personal safety.  All of these systems operate reliably and seamlessly over the fibre optic communications system.

By using fibre optics technology running the entire length of the corridor, we’ll be able to collect all this information and transmit it quickly so that the transit system can respond immediately.  The communication system will also provide the real-time bus arrival information displayed on station VMS.

With this high-tech communications system providing the brains to the transit system, viva will make it easier, faster and more reliable to travel across York Region.  Check out this video on how this system works.

Categories
Rapidways Stations

putting the rapid in rapid transit

We’re excited about the transformation of York Region’s major corridors from busy highways to complete streets designed to be shared by transit-users, pedestrians, cyclists and drivers.  But first and foremost, vivaNext is about building a true rapid transit system.  Because they’re not going through mixed traffic, these dedicated rapidways will help viva vehicles move past congested stretches of Highway.  But the bus rapid transit system will also use a number of other technologies or “transit priority measures” to put the rapid into the system.  Here’s the rundown on how we’re going to help keep viva buses reliably rapid.

The first main component is that all buses will have GPS systems installed, which will constantly calculate the vehicle’s speed, heading, latitude and longitude.  That way, the transit system will know exactly where each vehicle is, relative to where the schedule says it should be.

The next main component is the traffic signal control system that governs all the intersections along the rapidway route.  The system relies on the findings of sophisticated traffic analysis that has worked out the optimal timing for each intersection to ensure the most efficient use of the corridor.  This analysis takes into account long-term traffic data reflecting all the users of each intersection, including east/west traffic, north/south traffic, pedestrians and cars making left turns.

Using this analysis, each traffic signal is pre-programmed for the optimal phasing, including how long a green light should last going in each direction.

With real-time information available about where each vehicle is, the transit system will constantly calculate whether a viva vehicle approaching an intersection is on time, or delayed.  If the vehicle is behind schedule, a signal sent from the bus to the traffic signal at that intersection will temporarily adjust the phasing so that the vehicle doesn’t have to stop.

The last major component of this complex system is the one that tells our customers when the next bus will arrive at the station. The variable message signs (VMS) installed at each station display real-time arrival information showing the arrival times for all buses expected within the next while, based on the information sent by the vehicle’s on-board GPS system.  These message boards are a feature of the viva system that customers really appreciate.

Using this multi-layered approach, we’ll be able to help each viva bus move along quickly, and you’ll be able to know how soon it will arrive.  All of which adds up to rapid transit!

Categories
Rapidways Stations Urban Planning

driver training in progress

We’re really counting down the days to the start of vivaNext rapidway service, and we know you are too: being able to get on board a viva bus and zip past congestion is going to be a wonderful advantage for York Region transit users.  So you’ll know we’re really in the final stretches once you see viva buses out on the rapidway starting this week, which is when York Region Transit (YRT) starts the training process for operators and other staff.

YRT is doing training in two stages, with the first stage during the week of July 29 and the second stage over two weeks starting August 5.

In the first stage, training will be provided for everyone who will need to be familiar with the rapidways, the stations and equipment.  We will have vehicles out on the rapidway, taking customer service staff and other YRT staff along the rapidways and spending time at the new stations.  This will give staff a chance to really interact with all the new features so they’ll be ready to provide support to the public once the system is open.

During this time YRT will also be working with emergency services (police, fire, ambulance) to help them become familiar with the rapidway and safety features at the stations including the emergency call button.  Emergency services personnel will be familiarized with access points where they can enter and exit the rapidway, and in the future emergency services vehicles will have the option of using the rapidway when responding to calls.

The actual operator training begins the week of August 5 and will go on for 2 weeks, running from 8:00 AM to as late as 9 PM some nights, seven days a week.  During this time you can expect to see quite a lot of viva buses running up and down the rapidway, stopping at stations.  They will be clearly marked as YRT Training Vehicles to avoid confusion.  The training will focus on entering and exiting the rapidways, especially entering back into mixed traffic at the east end, and exiting the rapidway at the west end and crossing to the curb to service the Bayview Towers station.

Training will also focus on the new transit signals at intersections, which will provide a single green arrow for transit operations.  This signal will be clearly marked as being for transit only, but YRT operators will be trained to be cautious and on the lookout to make sure members of the driving public are obeying the signals correctly.

As part of their training, operators will spend time at the Chalmers station learning about the station’s layout and features, including the parking pad which will be used by support and maintenance staff for future station and rapidway maintenance and snow clearing.  Operators will also get training on the new fare equipment that passengers will be using once service starts.

Trainees will be taken out in groups of six or less, with one trainer to every three trainees.  They’re all experienced viva operators, so they know the route and the vehicle.   They’re really excited to get going, knowing that in just a few more weeks the rapidway will be open for service.  We hope you follow along with us through this blog series to get all the details as we count down the days!

 

Categories
Construction Live-work-play Rapidways Stations Uncategorized Urban Planning

testing, testing, testing

As you will know from driving along Highway 7, our rapidway construction is really coming along, and this summer a segment will be going into operation.  We still have a bit more work ahead of us before service operation can begin, including some work which will be obvious such as final paving, striping and landscaping.  But in addition to that work, we’re just getting underway on a less-obvious but highly important part of the job, which is to ensure that all parts of the rapidway project are ready for active service.

This stage – known in the construction world as commissioning – is critically important, and planning for it on the Highway 7 rapidway has already been in progress for many months.

So what does commissioning involve, and how do we do it?

First of all, the technical definition of commissioning is that it is the process of assuring that all systems and components of a system are designed, installed and tested according to the operational requirements that have been established.

In the case of vivaNext, the most visible components of the project include the new roadways, passenger stations and amenities, and streetscape elements such as lighting, sidewalks and landscaping.  Ongoing inspections are being done as construction progresses to ensure that these are being built to certain specifications, before they are handed over for use.  Commissioning is a more detailed focus on the key systems and components that together make up the overall communications network.

These components include the fare collection equipment that will be installed at all stations; the station information systems such as the variable message signs, clocks and Public Address systems; passenger security elements such as closed circuit TV systems and emergency call buttons; and the traffic signals at intersections.  It also includes the sophisticated Transit Vehicle Detection system, which will provide information to the traffic signals when rapid transit vehicles are approaching intersections, as well as the overall communications system and fibre optic network that links all of these components.

Obviously these components are very complex, and a huge amount of effort goes into designing and building this equipment to the highest standards in the first place to make sure it will work as intended.  But we also build in a lengthy process of testing to make sure all the pieces are talking to each other in the way they’re designed to.

Testing starts at the factory, where the fabricator verifies that the equipment works as it is intended, and then each component is tested again once it’s installed.  Once all the components are installed and each one is confirmed to be working as designed, a series of additional tests are carried out to confirm that the entire system is integrated properly and working together.

The final step involves testing the reliability and function of the entire system, including simulating actual operation using buses and staff acting as passengers, which gives the people who will be involved in the future operation, maintenance and service of the rapidway an opportunity to become familiar with the new equipment and facilities.

This entire process takes several months, and is done at each individual station and intersection as its equipment is installed.  So you can see that there’s still a lot of work behind the scenes to get to the day we’re all looking forward to – when the first viva vehicle pulls into the rapidway for the first time on Highway 7 in August.