Categories
Rapidways Subways Urban Planning

We talk a lot about the rapidways, subways and LRTs that are coming.

But when you boil it down, that’s not what vivaNext is really about. VivaNext is the plan to provide you with faster and easier rapid transit connections, so you have more time to enjoy whatever awaits you at your final destination. It’s not only our goal; it’s our slogan – “vivaNext. it’s about connections. it’s about time.”

Transit hubs at the Vaughan Metropolitan Centre and Richmond Hill/Langstaff Urban Growth Centre, where the Spadina and Yonge subway extensions will respectively meet Highway 7, is just one way vivaNext plans to improve connections. At these locations, riders will be able to make convenient connections with Viva, GO Transit commuter rail and express buses, YRT and other transit systems.

Rapidways is yet another way vivaNext is putting the rapid into rapid transit – up to 40% faster. How? By featuring dedicated centre lanes in roadways to allow our beautiful blue Viva vehicles to safely speed past congested traffic, no matter what time of day.

So tell us…When the vivaNext projects are complete, which connection point will be the most important for your daily commute?

Categories
Rapidways Subways

Pop quiz for students

All aboard!
All aboard!

If you are a student, you’ll be heading back to school next week so we thought we would get you ready for some of those really hard tests with a little pop quiz. Luckily for you, this is an open book/computer quiz and help can be found on our website and blog.

1) What major university will have two subway stops running by it within the next six years?

2) What College campus in Markham will have a rapidway stop right outside its door within three year?

3) What high school at Warden and Highway 7 will have a rapidway stop outside its doors within three years?

4) What public high school in Newmarket will have a rapidway stop only a short walk away from its doors?

5) What Richmond Hill high school may have a subway stop a few blocks from its doors?

Good work, pencils down.

So as you can see, the rapidways and subway extensions will make it a lot easier for students from many different areas to get to school and travel in to, out of and around York Region.
If you are a student, how will our future projects help you get to school?
Good luck this school year.

Answers: 1) York University 2) Seneca College, Markham Campus 3) Unionville High School 4) Huron Heights Secondary School 5) Langstaff Secondary School
Categories
Live-work-play Rapidways Urban Planning

Bringing the vivaNext vision for Markham into focus

An artist rendering of what the new Downtown Markham transit-pedestrian mall may look like.
An artist rendering of what the new Downtown Markham transit-pedestrian mall may look like.

Markham Centre is on the verge of becoming a world-class, mixed-use urban centre and a key destination place.

For example, construction on Downtown Markham is well underway and features the first transit-pedestrian mall in the GTA with businesses, residences, shops, restaurants, theatres and a 10-acre world-class park for people to enjoy without having to drive to get here.

Viva riders travelling along Highway 7 will be able to make seamless and convenient connections in Markham with GO Transit commuter rail and express buses, YRT local bus services, and the future 407 transitway. Bicycle racks will also be available at vivastations and on Viva vehicles for those who choose to cycle.

To view artist renderings of the vivaNext vision for Downtown Markham, click here or visit the Media Centre at vivaNext.com.

Have you visited a transit-pedestrian mall in another country? Tell us about your experience.

Categories
Rapidways Stations

How level boarding at our new vivastations will further enhance service efficiency

With level boarding, the vehicle will pull up to a raised platform. This greatly increases the time it takes for passengers to get on and off the vehicle making for a faster trip.
This is a rendering of a viva vehicle stopping at a new vivastation. With level boarding, the vehicle will pull up to a raised platform. This greatly decreases the time it takes for passengers to get on and off making for a faster trip.

Viva is already a highly efficient rapid transit service thanks to features such as our off-board fare collection system. It’s going to get even better. In addition to our new vivaNext rapidways – which will take our beautiful blue Viva vehicles out of mixed traffic and put them on dedicated centre lanes so they can safely speed past congested traffic – our new vivastations will feature level boarding.

What do I mean by level boarding? Simply that the platforms at our new vivastations will be raised so they are about the same height as the floor of our Viva vehicles. This, in turn, will speed up the boarding process by eliminating the need for riders to climb steps or lift objects, and for Viva drivers to lower ramps for easier accessibility.

Level boarding is already successfully used throughout the world by other BRT, LRT and subway systems to enhance service efficiency. It only made sense to make it a feature of our new vivastations so that we can get you where you want to go faster and easier, and like never before.

Can you think of other things that might make your rapid transit experience even better?

Categories
Announcements Press Subways

Big step toward starting construction on the Spadina subway extension

Chair Fisch and the other dignitaries pose for cameras in front of a scale model of a tunnel boring machine.
Chair Fisch and the other dignitaries pose for cameras in front of a scale model of a tunnel boring machine.

Lovat, an Ontario-based company that makes tunnel boring equipment, has been awarded a $58-million contract to build four machines that will be used in the construction of the Spadina subway extension.

The announcement was made last Friday, August 7, at the Lovat plant by Ontario Transportation Minister Jim Bradley, joined by MP Bob Dechert, York Regional Chair and CEO Bill Fisch, TTC Chair Adam Giambrone and Lovat President Dick Cooper. Not only does this mean the creation of some 200 jobs in the GTA and a boost to the economy, it signals continued progress on the project as it’s scheduled to open in 2015.

Prior to the announcement, I had the pleasure of joining the group for a bit of a tour of Lovat. We met at one end of their Mississauga plant and walked through to the other end while learning about what’s involved in making tunnel boring equipment. Cameras and reporters were waiting at the end of the tour to hear each dignitary deliver a short speech about the announcement.

It was awe-inspiring to watch the dignitaries being interviewed in front of a massive tunnel boring machine. They’re HUGE. Just take a look at the picture below to see how big they are compared to the people near them.

Lovat has built similar and even larger machines for projects all around the world, from Algeria to Venezuela. “We are pleased to be a part of this significant mass-transit project, as it not only generates jobs and strengthens infrastructure locally, but also highlights Canada’s technological capabilities on a global scale,” said Cooper.

The first two machines are expected to be delivered in the fall of 2010, with tunnel boring to begin shortly after.

York Regional Chairman Bill Fisch speaks to the audience and TV cameras in front of an actual tunnel boring machine last Friday.
York Regional Chair and CEO Bill Fisch speaks to the audience and TV cameras in front of an actual tunnel boring machine last Friday.
Categories
Studies Subways

Metrolinx’s interim report recommends subway over BRT on Yonge

What a transit sign may look like at the Richmond Hill Centre with connections to a subway, YRT and Viva busses, and GO trains.
What a transit sign may look like at the Richmond Hill Centre with connections to a subway, YRT and Viva busses, and GO trains.

Last Friday, Metrolinx released its interim Benefits Case Analysis (BCA) for the Yonge North Subway extension.

The BCA was developed by Metrolinx in collaboration with the City of Toronto, the Regional Municipality of York and the Toronto Transit Commission. The analysis looked at two subway options, and a bus rapid transit option.

Here are the key findings:

  • The subway options have a far greater positive impact on the environment, economy, land development and community than the BRT.
  • The economic impacts of the subway options are considerable – creating 21,800 person-years of employment.
  • Both subway options provide better service and reliability than the BRT. The BRT is not as reliable as the subway and would likely experience substantial overcrowding in peak hours.
  • The BRT is not considered a long term solution.
  • The BRT is likely limited by technology, and would not have sufficient capacity for the long-term needs of the corridor.

The proposed subway extension will meet up with the rapidways along Hwy. 7, which will soon get under construction. The combination of the rapidways and a connecting subway on Yonge St. creates a viable alternative to driving and will make it much easier for people to travel between York Region and Toronto.

While we would like to see the Yonge Subway extension proceed immediately, we know that projects of this magnitude can’t happen overnight. We will continue to work with all stakeholders and analyze the overall network elements, such as GO electrification impacts, the TTC capacity study at Yonge/Bloor, as well as the Downtown Relief Line.

The benefits of this project are significant and long-term. We will continue to work with all levels of government to ensure the funding is in place to keep this project moving forward.

The executive summary of the interim BCA is available here.

Categories
Community Events

Team vivaNext will be at the Woodbridge Italian Festival this weekend

Soccer teams of every description will be out in full force this Saturday, August 1 and Sunday, August 2 at the annual Woodbridge Italian Festival, taking place at the Ontario Soccer Centre, 7601 Martin Grove Road, just south of Highway 7.

The vivaNext team will also be there from 3 to 11:30 p.m. each day to cheer participants on and talk to residents about vivaNext projects, including the Highway 7 rapidway, which will make it so much faster and easier to take transit to events like this one in the future.

In addition to such soccer highlights such as the “VIP Soccer Challenge” between Vaughan City Council and members of the media, festival attendees of all ages can look forward to two spectacular days filled with food, entertainment, fashion, music, games and much more. Plus, if you are there Saturday evening, you will get to see the Miss Woodbridge Italia Pageant. Best of all, admission for everything is free.

We look forward to seeing you there!

Categories
Community Events Ways to win

Thanks to all our visitors for a winning four days at the malls.

A young girl fishes at our Markville Mall Pond last Friday hoping to win one of our cool summer prizes.
A young girl fishes at our Markville Mall pond last Friday hoping to win one of our cool summer prizes.

This past Thursday through Sunday, vivaNext teams were out in full force at various York Region malls including Markville, Upper Canada and Vaughan Mills. Thousands of visitors stopped by our booths to putt golf balls and fish in our ponds for instant prizes like beach balls, flying discs and magnetic puzzles.

Of course, there was also plenty of great chitchat about vivaNext. People were really excited to learn that we’ll soon be breaking ground on the rapidways, which will make it up to 40% faster to get around York Region’s busiest corridors when completed.

If you missed us at the malls, not to worry because you could still win with vivaNext. If you haven’t entered our Next Best Thing To Summer Contest, you have until this Friday, July 31, 2009, to do so.

You could win cool summer gear in one of our daily prize draws plus our Grand Prize of a handy iPod touch® so you can get up-to-date vivaNext construction and project information wirelessly. Good luck to all our entrants!

Categories
Rapidways Stations

Where do you think we should place the bicycle racks?

One possible location for the bike racks is on the platforms as you can see in this rendering.
One possible location for the bike racks is on the platforms, as you can see in this 3D model.

As part of the vivaNext plan, beautiful new vivastations will be built in the centre of the roadway along the rapidways on Davis Drive, Yonge Street and Highway 7, as well as the proposed LRT lines on Don Mills Road/Leslie Street and Jane Street in York Region. From the top down, these vivastations have been designed around you. Among their many features and benefits, they will include bicycle racks for quick and easy transit connections.

Right now, we’re examining where to place these bicycle racks and would like to hear your thoughts. There are basically three options to consider.

Option 1 – Place them right on the platforms. This would allow you to conveniently lock your bicycle up right at your point of departure and simply board the next Viva vehicle. On your return Viva trip, you’ll arrive at the same station, but on a different platform. To get your bicycle, all you’d have to do is go back to the original departure platform.

Option 2 – Place the bicycle racks on the sidewalks at the intersections adjacent to the vivastations.  This option would make it more convenient for you to shop, run errands and meet up with friends after your return Viva trip before picking-up your bicycle.

Option 3 – Distribute the bicycle racks evenly on both the platforms and the sidewalks.

So which option do you prefer? Please take a moment to let us know because here at vivaNext, we value your opinion – even when it comes to bicycle racks!

Categories
Press Rapidways Urban Planning

Metrolinx committed to breaking ground on vivaNext rapidways this fall.

Metrolinx President and CEO Rob Prichard takes questions from reporters after the public session of the July 13 meeting
Metrolinx President and CEO Robert Prichard takes questions from reporters after the public session of the July 13 meeting.

Metrolinx, the body created by the Government of Ontario to develop and implement an integrated transportation plan for the Greater Toronto and Hamilton Area, is committed to working with Viva toward a fall 2009 construction start date for the rapidways project. During their July 13th public board meeting, Metrolinx President and CEO Robert Prichard said, “Progress is going very well indeed. We want to break ground this fall and we are working hard to do so.” During the meeting, Metrolinx General Manager of Investment Strategy and Projects John Howe presented our renderings of the Davis Drive rapidway to show how it will look in the future. They generated a lot of excitement amongst those in attendance.

If you would like to see the renderings presented at the meeting for yourself click here or visit vivaNext.com, where you’ll also find a link to the Metrolinx website in case you are also interested in viewing the meeting agenda.