Categories
Rapidways Urban Planning

recognizing great transit

recognizing great transit

As I’ve discussed in a previous blog, huge infrastructure projects involve the cooperation and organization of many parts. Fast, reliable transit systems are not built overnight. Years of design and planning go into a project before construction even begins. You might feel like construction in the vivaNext corridors is never-ending, but remember that these are important transit investments that, in the long term, will drive positive change in our communities.

The plan to promote awareness in the City of Markham was initiated back in the fall of 2001 with the “Great Transportation Debate,” which drew attention to the need for a rapid transit system in York Region. Fast-forward 13 years later to today, where the first section of rapidway is open on Highway 7 and the rest of the ambitious vivaNext projects are well underway.

World renowned environmentalist David Suzuki mentioned our project in a recent article, calling it an “impressive BRT network with rapid transit corridors for a fleet of modern and comfortable fast buses.” He pins the success of the world’s leading cities like New York on government investments in transportation solutions, from light rail and subways to bus rapid transit networks, so it’s exciting to know that cities in York Region are heading in this direction.

VivaNext’s success has been recognized by others as well: earlier this year it was awarded Project of the Year by the Ontario Public Works Association, for a transportation project valued greater than $50 million. The honour is granted to an organization that promotes excellence in the management and administration of public works projects by recognizing the coordination between managing agency, the consultant, architect, engineer, and the contractor.

Also, the York Region Chapter of the Professional Engineers of Ontario chose vivaNext as Engineering Project of the Year. It’s gratifying to have our commitment to excellence and dedication to the vision for York Region recognized by top industry professionals.

With summer construction season well underway, we thank you for your patience as these “impressive” infrastructure projects get built.

 

Categories
Uncategorized

CN Bridge expansion: when transit intersects

Did you know that as part of vivaNext’s rapidway project on Highway 7 West in the City of Vaughan, construction is underway to expand the south side of the Canadian National Railway [CN] MacMillan Bridge? The bridge surface, located west of Keele Street will be widened approximately 8-metres to accommodate dedicated rapidway lanes, sidewalks and bicycle lanes.

Aside from being one of the most widely-used bridges along Highway 7, most drivers may not even realize that each time they cross the bridge, they are driving over the CN MacMillan Rail Yard, the largest rail yard in Canada.

Named after former CN president, Norman John MacMillan, the yard measures approximately 6.5-kilometres in length and 1.6-kilometres in width and was developed in the late 1950s as part of CN’s redesign of the Toronto trackage network. The yard operates 24 hours a day, 7 days a week and handles over 1 million railcars per year to service local businesses in the Vaughan area, as well as the broader North American economy!

As part of the bridge widening, construction activities include:

  • removing the existing walls and sidewalks on the south side
  • backfilling with 8,000 tonnes of earth
  • pouring 4,000 tonnes of concrete to build walls, columns, sidewalks and bridge decks
  • embedding 300 tonnes of reinforcing steel and;
  • completing the surface finish with new light standards and pedestrian hand rails.

Sounds like a lot right? So how do we do this without impacting CN’s business?

During construction, rail yard operations along the 10 sets of tracks will be maintained, and the contractor will work closely with CN to coordinate activities around train schedules. The majority of the construction activity will happen below and underneath the bridge. Motorists will notice large equipment and construction vehicles such as large cranes, transport trucks, drill rigs and concrete pump trucks onsite for certain operations, including sub-surface drilling, pouring concrete and the installation of large pre-cast concrete sections.  With the increase in construction vehicles, safety awareness is important if you are travelling through the area.

In order to maintain traffic flow along Highway 7 during the bridge expansion, the centre median was removed earlier this year and traffic was shifted to the north side of the bridge. To further minimize disruptions, an access road off of Highway 7 is also being constructed for equipment and deliveries. Due to the nature of this work, there will be noise and vibration around the work area. Being mindful of our neighbours, noise and vibration monitoring will be conducted to ensure levels are kept within industry standards.

The first phase of the Highway 7 West rapidway in the City of Vaughan will extend 3.6 kilometres from Interchange Way/Edgeley Boulevard to east of Bowes Road. The project features three new rapidway vivastations, wider sidewalks, landscaped boulevards and transit connections to the Toronto-York Spadina Subway Extension and the York Region Transit Bus Terminal. The CN Bridge expansion work in Vaughan is expected to be complete in 2016.

For more information about vivaNext projects, visit vivanext.com or follow us on Facebook and Twitter.

Categories
Announcements General

rapid transit is coming to yonge street

The next generation of rapid transit is coming to Yonge Street. We’re excited to announce that York RapidLINK Constructors have been awarded the $260.5 million design build contract for the York Viva Bus Rapid Transit [vivaNext] rapidways along Yonge Street in the Towns of Richmond Hill and Newmarket.

The project involves widening Yonge Street within Richmond Hill and Newmarket to accommodate approximately nine kilometres of dedicated rapidway lanes for viva rapid transit vehicles in the centre of the road as well as 10 new vivastations.

In Richmond Hill, the Yonge Street rapidway will extend 6.5 kilometres from Highway 7 to 19th Avenue/Gamble Road, including seven new vivastations. In the heritage area north of Major Mackenzie Drive, viva will continue to drive in mixed traffic as it does today.

In Newmarket, the rapidway will extend 2.4 kilometres on Yonge Street from just south of Mulock Drive to Davis Drive, and will include three new vivastations. Construction is expected to begin later this year, and be completed by the end of 2018.

This is an important project that will benefit the local economy for generations and will support the significant development and growth of these communities by reducing congestion and providing commuters with a better way to get around.

To learn more about the Yonge Street project and sign up for project updates, visit vivanext.com.

 

Categories
Construction General

transforming vaughan

VivaNext is committed to designing and delivering an exceptional rapid transit system – one that will help shape growth in our communities, connect York Region’s urban centres and provide faster, more reliable and congestion-free trips. The vivaNext rapidway in Vaughan is more than just a transit project. It also includes urban design elements such as pedestrian-friendly boulevards, wider sidewalks, attractive landscaping, bicycle lanes and green open spaces for the whole community to enjoy. Check out this video and take a ride with us along the corridor to see what is happening.

As you can see, the transformation along Highway 7 West is well underway. Last year, in the Vaughan Metropolitan Centre [VMC] area (also known as phase one of the vivaNext project in Vaughan) crews were busy removing signs, and relocating utilities in preparation for construction.

This year, you will see significant construction activity in this segment. Traffic lanes will be shifted and bus stops will be relocated in order for crews to continue infrastructure work for hydro, gas, storm drains, watermains and begin road widening. Construction has also started on the south side of the Canadian National Railway [CN] Bridge, located west of Keele Street. The bridge surface will be widened approximately 8-metres to accommodate dedicated rapidway lanes, sidewalks and bicycle lanes.

In the phase 2 area east and west of VMC, crews will be working intermittently along the corridor on preliminary construction activities such as soil sampling and other environmental investigations.

Work on the Toronto-York Spadina Subway Extension [TYSSE] also continues this year.  When completed, this subway line will include six stops, 8.6 kilometres of track. Residents and visitors alike will enjoy the mixed-use, transit-oriented development offered in the VMC area, including convenient passenger pick-up and drop-off, a York Region Transit bus terminal, and connection to the Viva rapidway running in dedicated lanes east and west along Highway 7. It will be a great place to work, shop or relax, and getting there will be easy whether you walk or ride transit.

Throughout construction, we’ll keep everyone informed and minimize disruptions as much as possible for those who live, work and commute in Vaughan. For more information on any of these projects, or to sign up for construction notices so you can stay in the loop, visit vivanext.com.

Categories
Community Events General Going Green Rapidways

earth hour 2014 – celebrating our commitment to the planet

Nelson Mandela – “Let us stand together to make of our world a sustainable source for our future as humanity on this planet”

Earth Hour is an annual global event that is held on the last Saturday of each March to raise awareness of climate change, and to encourage each of us to make choices that will lessen our impact on the environment. This remarkable initiative first began in Sydney, Australia in 2007 with 2.2 million Sydneysiders [A native or inhabitant of Sydney, Australia] and 2,100 businesses taking part. To date it has grown to over 6950 cities and 152 countries worldwide.  In 2012 Vancouver was recognized as the first Global Earth Hour Capital. The City of Vancouver has set green targets of being a global leader on climate-smart urban development. Vancouver aims to have all newly constructed buildings be carbon neutral in their operations by 2020.

In reflecting on the true meaning of Earth Hour it raises the question – why wait until March 29 at 8:30pm to make a difference in saving energy or working to reduce climate change? Why not make small changes throughout the year? Small changes like carpooling or taking public transit will help reduce vehicle emissions and pollution. We are seeing these everyday changes right here in York Region with a 38% increase in ridership and over 22.7 million riders on YRT\Viva since 2005.  With the section of the rapidway that is open on Highway 7, you can hop aboard a Viva bus and cut your commute time by up to 40% during the rush hour commute.

Once vivaNext rapidway construction is completed, the sustainable transformation of this urban corridor will support growth, and reduce congestion to help make York Region an even more inviting place to live, work, shop and play. These benefits extend well beyond York Region. For example, the rapidways will also play an important role in a seamless transit system across the GTHA, helping to reduce traffic congestion, increase productivity and provide sustainable alternatives to car use, which help reduce our environmental impacts.

If we all tried, even for one day, to reduce our environmental footprint it would be a symbolic demonstration of our commitment to reducing climate change.  Don’t forget to power down this Earth Hour, our planet will thank you.

 

Categories
General

communication is key

VivaNext is committed to providing timely and informative updates on all our construction projects. We have a small team of communicators who work behind the scenes to ensure you get the practical information you need. We strive to keep everyone up-to-date through various print and electronic communication vehicles.

Social media is an important tool that we use to provide information to our vivaNext users/followers. It allows for instant communications and easy access to all of the project news and updates.  It also provides the opportunity to have an engaged conversation in “real-time”. We summarized a number of our communication initiatives and social media channels in a short video for you to see just how dedicated we are to keeping you informed throughout construction.

In this video, you’ll also see a glimpse of the Davis Drive rapidway construction and the progress underway in the Town of Newmarket. While we capture as much as we can on video, it doesn’t always do the work justice. Why not check for yourself and stop by Davis Drive today to see the transformation unfolding and while you’re there Shop Davis to support your local retailers during construction.

Just as we keep the communication flowing to you, we also appreciate your interaction with us. Asking questions, sharing your thoughts, photos and comments, and posting on our social media channels such as Facebook or Twitter not only promotes participation, it also provides us with feedback. We also encourage you to connect with us on LinkedIn, Instagram, and Pinterest.

We really enjoy hearing from you and appreciate your input. Let’s continue to keep the channels open and the communications flowing.

 

Categories
General Rapidways Uncategorized Urban Planning

what’s next for yonge?

 

Did you know that the next phase of rapid transit is coming to Yonge Street? As part of our overall plan to reduce traffic congestion throughout York Region, vivaNext will be building rapidways on one of Canada’s most famous streets, providing fast, reliable, convenient transit and accommodating new intensified development in Richmond Hill and Newmarket.

The Yonge Street rapidway project includes attractive landscaping, wider sidewalks and bike lanes, setting the stage for pedestrian-friendly and mixed-use development and enhancing the area as an attractive destination for residents, businesses and visitors to live, work and visit.

For those of you who joined us at our public meetings in November, you would have seen preliminary project plans and conceptual drawings of the future Yonge Street rapidways.  Here is a brief re-cap of what the plans are:

In Richmond Hill – Yonge Street will be widened to accommodate dedicated rapidway lanes for viva buses in the centre of the road and seven new vivastations. In total the rapidway will extend 6.5 kilometres from Highway 7 to 19th Avenue/Gamble Road. In the heritage area north of Major Mackenzie Drive, viva will continue to drive in mixed traffic as it does today.

In Newmarket – dedicated bus rapid transit lanes will run along 2.4 kilometres of Yonge Street from just south of Mulock Drive to meet up with the vivaNext rapidways already under construction along Davis Drive. The Yonge Street rapidway will be home to three new vivastations at Mulock Drive, Eagle Street and Davis Drive.

While crews are out on site conducting advanced studies and property surveys along this corridor to help prepare for construction, the next step for this project is to award the Design-Build Contract. From there we will be busy working with the contractor to create construction plans, complete preliminary engineering studies, refine the design and establish timelines for various phases of construction for this project. The contract is expected to be awarded soon, so stay tuned for details.

Categories
General Rapidways

join the discussions in vaughan?

Congestion in the GTHA is at an all-time high, with an additional 2.5 million people and one million more cars expected in the next 20 years, the problems will only get worse. We can no longer postpone building the kind of transit network that offers residents and commuters better transportation choices, eases congestion, connects them with jobs and travelling efficiently in all directions.

New transit lines connect most neighbourhoods and business districts, putting commuters within a short walk of rapid transit.  The vivaNext project is a part of this overreaching transit network that will connect not only local but regional service once completed.

York Region Transit [YRT] conventional routes cater to local communities in all York Region municipalities and also include GO Shuttles and Express services.  These routes stop frequently at the curbside of the road. Viva connects Markham, Richmond Hill, Vaughan, Aurora and Newmarket and also links York Region with Toronto and its subway system, GO Transit and the Region of Peel. It operates along major corridors much like an above-ground subway, for faster service.  Once Viva service is running in its own rapidway, service will be even faster.

Transit planning takes time and includes: consultation with the users, route planning, bus scheduling and stop identification.

This year, YRT is holding stakeholder engagement meetings to discuss transit routes and overall service to prepare for the opening of the Toronto-York Spadina Subway Extension [TYSSE] in the City of Vaughan. The Subway is scheduled to open in 2016 and we want to be ready.

YRT\Viva is looking for your input at their public information meetings.   We encourage you to come out to these events and learn how transit development will affect you in your daily commute and provide your input in what service and routes you want.

The vivaNext team will be there also, so join us for an in-depth look at different elements of vivaNext projects, plans, designs and ongoing activities or visit vivanext.com.

Categories
Construction General Rapidways Uncategorized

winter work to make our spring schedule

With its cold temperatures, snow and ice, winter is not the ideal construction season for roadwork in general, which is why most vivaNext construction is focused on other tasks for the next few months.  But to make sure we’re ready to get going on roadwork as soon as it’s warm enough next Spring, our crews and those of various utility companies are keeping busy this winter doing a range of activities.  Here’s what you can expect to see going on out there this winter.

A key task for all the vivaNext corridors is widening the roads so we can keep the existing number of travel lanes, plus make room for the rapidways and stations in the median.  But before we can get going on construction to make the roadways wider, we need to remove and relocate all the utilities that previously ran beside the curb of the existing roadways.  This step, which involves relocating a wide range of services including gas, hydro, telecommunications, water, and sanitary and storm sewer systems, requires painstaking coordination between contractors for our project as well as the utility companies and their crews.  With contractors needing to be spaced from one another by both time and distance, and there being a logical sequence in which the services get relocated, this is a hugely time-consuming process that will be ongoing throughout the winter in various locations.

The specific activities vary from corridor to corridor, involving different utilities and work at different stages of completion. Where hydro service is above ground, hydro relocations involve crews restringing the wires on the new poles once they’ve been installed in their new locations, and then removing the old poles.  Once the service is relocated on the new poles, crews then create the connections from the new service to individual addresses.

There’s also gas work underway in several areas along the vivaNext corridors, which involves relocating gas mains underground, and then attaching individual addresses to the new service.

And working in close coordination with the underground gas work are crews from the telecommunications companies, who are relocating their services into underground joint-use duct banks that the telecoms use. Constructing the duct banks involves much more work than simply stringing wires on poles, but the benefit is that with fewer poles along the side of the road there’s more potential to beautify the streetscape, which is an important objective for our project.

Finally, the last part of this complicated dance of roadside work involves our own crews who are busy relocating sanitary sewers and storm sewer systems and watermains.

All of this work is carefully planned out one step at a time and coordinated between our builder and the utility companies, then carried out in conditions that involve extra challenges due to the need to keep the ground warm enough to work in.  But it will be worth it, since the heavy road widening and construction is best done in the warmer weather.  And once it comes, we’ll be ready to go, widening the roads so that the rapidway stations can be installed.

So watch out for all the crews who are out there working this winter, and know that their work is an important part of the vivaNext schedule.

Categories
Construction General Rapidways Uncategorized

watching the transformation unfold

As you travelled on and around the busy corridor of Davis Drive last year, you undoubtedly noticed the significant construction activities underway. You may also be wondering what has been completed so far.

A lot of progress was made on the project this year and a number of milestones were achieved, all of which clears the way for the 2014 construction season. Nearly all retaining walls have been constructed, the eastern creek culvert has been replaced and extended, and the majority of hydro poles have been relocated. Road widening and base-layer paving has started, while reconstruction of Keith Bridge and the extension of the western creek bridge on the north side continue.

In addition, Parkside Drive was re-aligned with Longford Drive as a full four-way intersection. The re-alignment eliminated one set of traffic lights and improves overall traffic flow in the area.

We captured a number of these accomplishments on video and condensed them into a short clip for your viewing pleasure. The investment in modernizing our roads and revitalizing Newmarket’s infrastructure will go a long way to making sure Davis Drive is built on a solid foundation that will serve the growing needs of Newmarket for many decades to come. We look forward to building on the progress made and advancing the  bus rapid transit project bringing Viva service to Davis Drive. Thank you for your patience as we complete the transformation.