Categories
General

communication is key

VivaNext is committed to providing timely and informative updates on all our construction projects. We have a small team of communicators who work behind the scenes to ensure you get the practical information you need. We strive to keep everyone up-to-date through various print and electronic communication vehicles.

Social media is an important tool that we use to provide information to our vivaNext users/followers. It allows for instant communications and easy access to all of the project news and updates.  It also provides the opportunity to have an engaged conversation in “real-time”. We summarized a number of our communication initiatives and social media channels in a short video for you to see just how dedicated we are to keeping you informed throughout construction.

In this video, you’ll also see a glimpse of the Davis Drive rapidway construction and the progress underway in the Town of Newmarket. While we capture as much as we can on video, it doesn’t always do the work justice. Why not check for yourself and stop by Davis Drive today to see the transformation unfolding and while you’re there Shop Davis to support your local retailers during construction.

Just as we keep the communication flowing to you, we also appreciate your interaction with us. Asking questions, sharing your thoughts, photos and comments, and posting on our social media channels such as Facebook or Twitter not only promotes participation, it also provides us with feedback. We also encourage you to connect with us on LinkedIn, Instagram, and Pinterest.

We really enjoy hearing from you and appreciate your input. Let’s continue to keep the channels open and the communications flowing.

 

Categories
General Rapidways Uncategorized Urban Planning

what’s next for yonge?

 

Did you know that the next phase of rapid transit is coming to Yonge Street? As part of our overall plan to reduce traffic congestion throughout York Region, vivaNext will be building rapidways on one of Canada’s most famous streets, providing fast, reliable, convenient transit and accommodating new intensified development in Richmond Hill and Newmarket.

The Yonge Street rapidway project includes attractive landscaping, wider sidewalks and bike lanes, setting the stage for pedestrian-friendly and mixed-use development and enhancing the area as an attractive destination for residents, businesses and visitors to live, work and visit.

For those of you who joined us at our public meetings in November, you would have seen preliminary project plans and conceptual drawings of the future Yonge Street rapidways.  Here is a brief re-cap of what the plans are:

In Richmond Hill – Yonge Street will be widened to accommodate dedicated rapidway lanes for viva buses in the centre of the road and seven new vivastations. In total the rapidway will extend 6.5 kilometres from Highway 7 to 19th Avenue/Gamble Road. In the heritage area north of Major Mackenzie Drive, viva will continue to drive in mixed traffic as it does today.

In Newmarket – dedicated bus rapid transit lanes will run along 2.4 kilometres of Yonge Street from just south of Mulock Drive to meet up with the vivaNext rapidways already under construction along Davis Drive. The Yonge Street rapidway will be home to three new vivastations at Mulock Drive, Eagle Street and Davis Drive.

While crews are out on site conducting advanced studies and property surveys along this corridor to help prepare for construction, the next step for this project is to award the Design-Build Contract. From there we will be busy working with the contractor to create construction plans, complete preliminary engineering studies, refine the design and establish timelines for various phases of construction for this project. The contract is expected to be awarded soon, so stay tuned for details.

Categories
General Rapidways

join the discussions in vaughan?

Congestion in the GTHA is at an all-time high, with an additional 2.5 million people and one million more cars expected in the next 20 years, the problems will only get worse. We can no longer postpone building the kind of transit network that offers residents and commuters better transportation choices, eases congestion, connects them with jobs and travelling efficiently in all directions.

New transit lines connect most neighbourhoods and business districts, putting commuters within a short walk of rapid transit.  The vivaNext project is a part of this overreaching transit network that will connect not only local but regional service once completed.

York Region Transit [YRT] conventional routes cater to local communities in all York Region municipalities and also include GO Shuttles and Express services.  These routes stop frequently at the curbside of the road. Viva connects Markham, Richmond Hill, Vaughan, Aurora and Newmarket and also links York Region with Toronto and its subway system, GO Transit and the Region of Peel. It operates along major corridors much like an above-ground subway, for faster service.  Once Viva service is running in its own rapidway, service will be even faster.

Transit planning takes time and includes: consultation with the users, route planning, bus scheduling and stop identification.

This year, YRT is holding stakeholder engagement meetings to discuss transit routes and overall service to prepare for the opening of the Toronto-York Spadina Subway Extension [TYSSE] in the City of Vaughan. The Subway is scheduled to open in 2016 and we want to be ready.

YRT\Viva is looking for your input at their public information meetings.   We encourage you to come out to these events and learn how transit development will affect you in your daily commute and provide your input in what service and routes you want.

The vivaNext team will be there also, so join us for an in-depth look at different elements of vivaNext projects, plans, designs and ongoing activities or visit vivanext.com.

Categories
Construction General Rapidways Uncategorized

winter work to make our spring schedule

With its cold temperatures, snow and ice, winter is not the ideal construction season for roadwork in general, which is why most vivaNext construction is focused on other tasks for the next few months.  But to make sure we’re ready to get going on roadwork as soon as it’s warm enough next Spring, our crews and those of various utility companies are keeping busy this winter doing a range of activities.  Here’s what you can expect to see going on out there this winter.

A key task for all the vivaNext corridors is widening the roads so we can keep the existing number of travel lanes, plus make room for the rapidways and stations in the median.  But before we can get going on construction to make the roadways wider, we need to remove and relocate all the utilities that previously ran beside the curb of the existing roadways.  This step, which involves relocating a wide range of services including gas, hydro, telecommunications, water, and sanitary and storm sewer systems, requires painstaking coordination between contractors for our project as well as the utility companies and their crews.  With contractors needing to be spaced from one another by both time and distance, and there being a logical sequence in which the services get relocated, this is a hugely time-consuming process that will be ongoing throughout the winter in various locations.

The specific activities vary from corridor to corridor, involving different utilities and work at different stages of completion. Where hydro service is above ground, hydro relocations involve crews restringing the wires on the new poles once they’ve been installed in their new locations, and then removing the old poles.  Once the service is relocated on the new poles, crews then create the connections from the new service to individual addresses.

There’s also gas work underway in several areas along the vivaNext corridors, which involves relocating gas mains underground, and then attaching individual addresses to the new service.

And working in close coordination with the underground gas work are crews from the telecommunications companies, who are relocating their services into underground joint-use duct banks that the telecoms use. Constructing the duct banks involves much more work than simply stringing wires on poles, but the benefit is that with fewer poles along the side of the road there’s more potential to beautify the streetscape, which is an important objective for our project.

Finally, the last part of this complicated dance of roadside work involves our own crews who are busy relocating sanitary sewers and storm sewer systems and watermains.

All of this work is carefully planned out one step at a time and coordinated between our builder and the utility companies, then carried out in conditions that involve extra challenges due to the need to keep the ground warm enough to work in.  But it will be worth it, since the heavy road widening and construction is best done in the warmer weather.  And once it comes, we’ll be ready to go, widening the roads so that the rapidway stations can be installed.

So watch out for all the crews who are out there working this winter, and know that their work is an important part of the vivaNext schedule.

Categories
Construction General Rapidways Uncategorized

watching the transformation unfold

As you travelled on and around the busy corridor of Davis Drive last year, you undoubtedly noticed the significant construction activities underway. You may also be wondering what has been completed so far.

A lot of progress was made on the project this year and a number of milestones were achieved, all of which clears the way for the 2014 construction season. Nearly all retaining walls have been constructed, the eastern creek culvert has been replaced and extended, and the majority of hydro poles have been relocated. Road widening and base-layer paving has started, while reconstruction of Keith Bridge and the extension of the western creek bridge on the north side continue.

In addition, Parkside Drive was re-aligned with Longford Drive as a full four-way intersection. The re-alignment eliminated one set of traffic lights and improves overall traffic flow in the area.

We captured a number of these accomplishments on video and condensed them into a short clip for your viewing pleasure. The investment in modernizing our roads and revitalizing Newmarket’s infrastructure will go a long way to making sure Davis Drive is built on a solid foundation that will serve the growing needs of Newmarket for many decades to come. We look forward to building on the progress made and advancing the  bus rapid transit project bringing Viva service to Davis Drive. Thank you for your patience as we complete the transformation.

 

Categories
General Rapidways

viva rapid transit vehicles – providing comfort and style

With the opening of the new rapidway on Highway 7 from Bayview Avenue to Highway 404, vivaNext has not only created placemaking structures but has transformed the way public transit is viewed.  The shelters are sleek and beautiful; the roadways are open and faster but most impressive are the buses that travel along these routes.

Nova Bus, based in Quebec, custom made and delivered twenty seven new vehicles in 2013 bringing the viva fleet to 123 vehicles; 40 foot vehicles and 63 foot vehicles.

York Region Rapid Transit (YRRTC) first procured viva vehicles in 2004 through an international request for proposals.  At that time the North American market did not manufacture any new, environmentally, comfortable buses and the contract was awarded to VanHool in Belgium.  In 2009 YRRTC once again put out a request for proposal for new vehicles and we were thrilled to have competitive submissions from North American companies.  After a rigorous process the contract was awarded to Nova Bus to manufacture the new vehicles maintaining the existing look and feel of the viva feet and all the comforts and benefits its customers have come to love.

The new Nova vehicles seat 56 passengers, plus the driver and have 2 mobility device stations, plus standing room.  Large platforms are located at both the front and back door for quick and convenient boarding.  A 32 inch wide electric ramp and a “kneeling/lift” floor system provides roll-on, roll-off access for those in mobility devices or pushing strollers.  This feature combined with the new near level boarding stations makes viva a full accessible transit system.  The new Nova has the accessibility ramp located at the front of the bus so that the driver can quickly activate and assist anyone requiring this feature.

All of the viva fleet comes with green light sensor systems which allow the GPS system to track their movements and allow central dispatch to update arrival times on the variable message boards at each station along the route.  This “smart technology” also has the ability to hold green lights or advance red lights at intersections if the vehicle is running behind schedule.

One of the great features of the viva rapid transit services is the soft, smooth ride which is provided by the state of the art-ride suspension on the vehicles.  The rear mounted engine allows for a quieter ride and helps keeps bumps to a minimum.

Canadians should be proud that our country is able to design, manufacture and deliver such quality transit vehicles and our customers are certainly appreciative of all the comforts they provide to their commute!

Categories
Announcements Community Events Rapidways

you’re invited to our Yonge Street open houses!

The next generation of rapid transit is coming to Yonge Street in Richmond Hill and Newmarket! In both communities, Yonge Street will be widened to accommodate dedicated rapidway lanes in the centre of the road, providing fast, reliable, convenient transit, while enhancing the area as an attractive destination for residents, businesses and visitors alike.

In Richmond Hill, the rapidway will extend 6.5 km and include 7 new vivastations from Highway 7 to 19th Avenue/Gamble Road. In Newmarket, dedicated bus rapid transit lanes will run along 2.4 km and include 3 new vivastations from just south of Mulock Drive to Davis Drive.

This project is moving full steam ahead with work beginning in 2014, and we want you to talk about it with us at our open houses this week! This is your chance to look at information boards and maps, and talk to vivaNext staff about what you can expect during the construction season ahead. You will also learn how a rapidway works and discuss the benefits it will bring to the community.

The same information will be available at both open houses. We hope to see you there, but if you can’t make it, you can subscribe online to receive construction updates and view all of the materials on our website after the meeting.

You’re invited!
Richmond Hill
When: Tuesday, November 19, 4-8 p.m.
Where: Richmond Hill Presbyterian Church
10066 Yonge Street, Richmond Hill

Newmarket
When: Wednesday, November 20, 4-8 p.m.
Where: Ray Twinney Recreation Complex
100 Eagle Street West, Newmarket

Learn more about the Yonge street rapidways ahead of the open houses by reading our Yonge Street project newsletter, and as always, feel free to contact us with any questions you might have at contactus@vivanext.com.

 

Categories
General LRT Rapidways

choosing the right form of transit

In September the Province set up an expert panel to look at how Metrolinx should be expanding transit in the GTHA, and to propose realistic options to pay for it.  The panel has just released their second discussion paper, and it’s well worth a read for anyone interested in getting beyond the rhetoric and really understanding the facts and issues.

Certainly the issue of what transit technology should be funded, and where it should run, is a subject that’s dominated the headlines for months and is of interest to everyone.  It’s understandable that so many have views on this subject, and it’s also reasonable to expect that the people doing the planning should listen to those views.

But in the final analysis, choosing a mode of transit – the main rapid transit options are subway, LRT, BRT and commuter train – shouldn’t be treated like a popularity contest. There’s just too much money involved.  Each mode of transit has its uses, benefits and drawbacks.  Those qualities are well known to transit planners, and need to be thoroughly and objectively analyzed in the context of local circumstances including passenger volumes, current and anticipated densities, employment projections, and present and future land use patterns.

Planners ideally will look at a range of transit modes to meet the needs of users across a region or area, with the primary consideration being a seamless system that enables passengers to make easy, fast connections.  That doesn’t necessarily mean the trip will be non-stop, or use the same technology the entire way.

This is a concept we all already live with, so we shouldn’t expect transit to be any different. Pretend you are taking a trip to a small island in the Caribbean.  You’d probably drive to the airport, then you’d get on a big jet, then most likely transfer to a smaller plane for the last leg, or maybe even a boat if you were going somewhere out of the way. You’d never expect the big jet to swing by your house to pick you up at your door, then whisk you non-stop to the tiny island.  Getting around the GTHA, depending on where you’re travelling from and to, follows the same logic.  Some riders may need to take surface transit, then transfer to one form of rapid transit – and then possibly to another mode to complete their trip.  The key point is to create a system that gets you there as fast as possible.

In a world where there’s only so much new money available for transit, careful decisions are needed to ensure final choices get the greatest number of people into transit, reducing gridlock on the road system.  The most costly option – subways – should be reserved for where it will do the most good, i.e. get the greatest number of cars off the roads.  Given that the need for new transit massively outstrips the money available, every single transit dollar needs to be spent wisely.

Professional analysis of facts has always been the basis for our vivaNext decisions. That’s why we’re installing BRT – the lowest cost form of rapid transit – along Highway 7, with the option to change to LRT when future volumes justify it.  On the other hand, the ridership and future employment projections do justify the cost of extending the subways north to the VMC, and along Yonge Street from Finch to Highway 7, so our plan includes subways too.

We’re proud of the system we’ve planned and are building for York Region, and are looking forward to the day when it will be connected to a system that covers the entire GTHA.  Now that’s something we think everyone will support.

Categories
Construction General Live-work-play Rapidways

bringing vaughan metropolitan centre to life

We recently posted a great blog on planning that talked about the link between transit and new urban communities. Given that tomorrow (November 8), urban planners from towns and cities in over 30 countries worldwide will celebrate World Town Planning Day, we thought we would take a moment to highlight another one of York Region’s amazing communities, and see how vivaNext transit projects fit into York Region’s planning vision.

In the Region’s Centres and Corridors strategy, selected areas in Newmarket, Richmond Hill, Markham and Vaughan are targeted to have new, urban “downtowns.” They will be vibrant, higher density, attractive destinations with a full range of amenities so that people can live, work, shop and play in the same community. These “centres” will be connected by transportation “corridors” that will make it easier for people to get around the region. That’s where we come in. Our vivaNext rapidways will run along the corridors, connecting the centres through transit and safe and efficient travel options for pedestrians, motorists and cyclists alike.

You can see the vision for one of these centres coming to life in the City of Vaughan’s new video about the Vaughan Metropolitan Centre [VMC] . Located in the heart of Vaughan, centered on Highway 7, between Highway 400 and Creditstone Road, VMC will be one of the largest and most ambitious development projects in the area’s history, and is a superb location for Vaughan’s new downtown.

In the VMC, mixed-use transit-oriented development is proposed along a tree-lined main street, including businesses, residences, entertainment and cultural facilities, as well as pedestrian shopping areas. The VMC area will act as a transportation hub, including convenient passenger pick-up and drop-off, a York Region Transit bus terminal, and viva rapidways running in dedicated lanes along Highway 7.

VMC will also be home to the northernmost subway station, as part of the Toronto-York Spadina Subway Extension [TYSSE], an 8.6 km subway extension from Downsview Station, northwest through York University and north to the Vaughan Metropolitan Centre. An entrance to VMC Station will be built on Millway Avenue, between Edgeley Boulevard and Jane Street to provide easy and efficient connections to other transit services.

With approximately 442 acres of development opportunities, VMC also includes:

  • Projected office development: 1.5 million SF
  • Projected retail development: 750,000 SF
  • Minimum of 12,000 residential units
  • Population potential: 25,000 new residents
  • Employment potential: 11,000 jobs of which 5,000 will be office jobs

It’s exciting to visualize how Vaughan will evolve in the years to come. To find out more about other vivaNext projects, visit our projects page.

 

Categories
General

chickens and eggs

Does great planning start with transit?  Or does transit start with great planning?  I was prompted to think about this the other day after reading an interesting newspaper article, Why we’re better off living in hyperdense cities built around mass transit.

The point of the article is that in many ways, we’re better off living in high density cities, as long as they have great transit so that people can live without cars. In particular, this article says the most productive and prosperous cities are those that are planned to have enough density to support a subway system.

Now it’s hard to imagine a time when everyone in York Region would choose to live without a car.  Many of the people in this region have chosen to live here expressly because they love having more room around them, and to have the countryside so nearby.  Cars will always be useful and practical in that kind of setting.

But there are many people – including an increasing number of young people – who like the idea of living and working in a walkable community, where they don’t need to have a car to carry out their daily routines.

The point of good planning is to ensure our communities provide appealing and functional options for both kinds of people.  It ensures that people who want to live in spacious suburban communities have that option without facing gridlock every time they get in their car, while meeting the aspirations of people who want to live in dynamic, urban settings with adjacent, convenient rapid transit.

Planning to make these options possible requires a long-term vision, and a commitment to invest in the infrastructure needed in the future, long before growth happens.  It also requires great transit.  But building a rapid transit system before the density is in place can only be done if there’s a strategic plan that directs densities to transit corridors, so that it all works together.  Rapid transit systems, including BRT like we’re building in York Region, require high volumes of riders to be sustainable.

Which brings me to my original question: what comes first, planning or transit?  The reality in York Region is that they’re intricately linked and interdependent.  Our planners identified many years ago that the future York Region would be bigger and more crowded, and would require more options to house people.  They also identified that those options would only be built and appeal to people if there was great transit nearby.

So the moral of the story is planning and transit need each other, and one can’t happen without the other.  Fortunately, we have both here in York Region – which means we will be able to offer more options for people, no matter what kind of community they want to live in.