Categories
Construction

we’re preparing for spring [despite what groundhogs may say…]

we’re preparing for spring [despite what the groundhog may say…]

The groundhogs seem to be of differing opinions about when spring is coming. Of the big three – Wiarton Willie, Shubenacadie Sam and Punxsutawney Phil – one says winter is over, and two predict six more weeks.

We’re ready for spring to come at vivaNext, with lots of plans afoot to continue the transformation of York Region’s busiest roads to rapidways.

When spring has sprung and the ground has thawed, our crews will be ready to carry out their detailed construction plans.

We carry out construction in all seasons, but there are some things that need warmer temperatures, like road widening, paving and of course, planting! Planters will be installed along Yonge Street in Newmarket this spring. At our newly open Vaughan Metropolitan Centre Station, the planters are ready and waiting for a green touch, soon to be filled with greenery.

We’re paving the way to spring with information, preparing newsletters on our projects, and keeping our Board and local stakeholders updated. Subscribe to sign up for email updates today.

At this time of year, we’re looking forward to ramping up our work. It’s not long now, and whether the groundhogs are right or wrong, we’re ready for spring.

Categories
Construction Rapidways Stations Utilities

viva la winter!

Brr, it’s cold out there, or unseasonably warm, depending on the day. You never know what’s in store. Regardless of the weather, our construction crews continue to expand the Viva rapidway system to improve connections in York Region. The winter season lends itself to certain types of work, especially the kind that happens above ground.

shiny, new canopies

Forget the January blahs! It’s been exciting times on the Bathurst & Centre corridor this past month. The first two vivastation canopies were installed at Bathurst/Hwy 7 Station located on the Bathurst connector road, one for each side of the station. There’s nothing like seeing that crane lift the canopy into place!

The elegant, arched glass canopies evoke traditional European transit infrastructure, transforming the everyday experience of transit into a beautiful one. A third canopy is coming this winter to the vivastation on Bathurst at Atkinson Avenue.

Looking to the west, construction of the first vivastation platform is beginning to take shape at what will be Commerce Street Station on Highway 7 West.

On both Highway 7 West and Bathurst & Centre, road widening and construction of storm sewers, retaining walls and culvert work is underway. Winter is also a great time to relocate hydro lines and install new poles, which is getting close to being completed in this area.

signals, check!

Our Yonge Street projects are not as far along, and the underground utility work they need to do is limited during cold weather. Crews have made some progress on installing underground duct banks and gas mains in Richmond Hill. Traffic signal work, a good above-ground winter activity, and is also underway. In Newmarket, crews are preparing to start work on the east side of Yonge when the weather gets a bit warmer. They’ll be replicating the road widening that was performed on the west side last year.

planning season

Winter is also a great time to make plans, large and small. We’re working together with the TTC on design and engineering for the biggest plan of all – the Yonge Subway Extension. Also, our staff and contractors are carefully planning spring construction schedules for the Viva rapidway projects, coordinating in advance with stakeholders, and procuring contractors for other projects.

Come spring, our crews will be raring to go, full steam ahead. If you’d like to keep on top of what’s going on in your community, we invite you to sign up for updates.

Categories
Commissioning Construction Facilities and terminals Rapidways Stations Technical

the critical role of spiders in building Vaughan Metropolitan Centre Station

Now, before you think we’ve imported some exotic tropical arachnids, what we call “spiders” are actually the stainless steel fittings that hold together the glass pieces on our stations. They’re called spiders due to their shape, and they play a critical role in the architectural and structural design of our stations.

For the new Vaughan Metropolitan Centre [VMC] rapidway station, the main structural support comes from the welded steel superstructure that forms the distinctive curved shape. Over top of that, steel, custom-made spider fittings are bolted to each steel intersection. The spider fittings support the individual glass panels on the station’s sides and skylight.

410 panels of glass

Each triangular-shaped panel of glass is attached by brackets on the legs of the spiders. Because each piece of glass is a unique size and shape, the job of attaching the glass to the spiders is very fiddly. The extra-large 50 by 24 metre VMC canopy has an eye-popping 410 panels, each equally spaced and slightly different due to the station’s curved planes. The tempered glass can’t be cut or drilled on site without shattering, so holes for the brackets were made during the fabrication process.

beautiful precision

We knew if the holes in the glass didn’t line up exactly to the spider brackets, the glass pieces wouldn’t fit. Since glass fabrication is a fairly slow process, we didn’t want to risk having to go back and remake a piece. Rather than making the glass in advance, we installed the spiders, then measured them with a 3-D laser scanner that registered the targets as multiple cloud points; essentially the same process used to make a 3-D model.

The last step was the installation of the glass panels to the station roof, and seeing all this precision and planning come together for beautiful results. Now if you visit the VMC rapidway station, you can take shelter under a strong and stunning glass canopy reminiscent of the great European architectural traditions, right here in York Region.

 

Categories
economic & financial General Innovation Rapidways Stations Subways Urban Planning

great transit knows no borders

The vivaNext mandate is to build a strong bus rapid transit network in York Region, but our responsibility doesn’t end at our Region’s borders. We’re forging transit connections that help people get wherever they want to go, in our Region and beyond. That’s why we partner with organizations like Metrolinx, and engage in big-picture thinking about how people use transit and what customers want. We don’t live our lives constrained by regional borders, why should our transit systems?

crossing borders

A key feature of the Metrolinx Draft 2041 Regional Transportation Plan for the Greater Toronto and Hamilton Area [GTHA] is that it calls for historic levels of transit investment to deliver more – and more frequent – transit service across the region that crosses regional borders more simply and efficiently. Another key strategy is optimizing the system, so we make the most of what we have.

getting ready to meet RER

For example, over the next 10 years, the Metrolinx Regional Express Rail program plans to transform the GO rail network – the backbone of regional rapid transit in the GTHA – providing two-way all day service north-south, east and west. This doesn’t happen in isolation. We’re preparing to offer integrated services with YRT/Viva networks, to serve passengers riding the trains.

one fare system

We’re not there yet, but that’s the direction we’re headed. From a passenger perspective, a transit system with one simplified fare system that transcends regional boundaries across the Greater Toronto and Hamilton Area could make a lot of sense. We’re on our way with the PRESTO card, which you can use to pay for transit at 11 different transit agencies in the GTHA. As digital apps improve and new technology comes on board, we look forward to what comes next.

TTC subway, now running in York Region

The regional transit system took a giant leap forward with the first TTC subway to cross regional borders, connecting with the Viva bus rapid transit network. Now we’re seeing what one subway [and bus rapid transit] connection has done for Vaughan, with all the ground-breaking residential, office and entertainment development at the Vaughan Metropolitan Centre. The next top priority transit project for York Region is the Yonge Subway Extension, which will elevate regional subway connections to an entirely new level.

These are just some of the ways we’re involved in strengthening regional transit connections, a task that comes with challenges and opportunities.

To understand more about the challenges in our region and beyond, the Ryerson City Building Institute hosted Breaking Transit Governance Gridlock, an all-star panel on regional transit governance. Read their blog about the event.

Categories
economic & financial General Studies

StatsCan commuting data highlights need for transit investment

The latest Statistics Canada census numbers on commuting confirm what many of us already know, experiencing it firsthand as we head to work each day. The commute is only getting busier. There are more commuters in Canada than ever, 15.9 million, up 30% from 1996. Not only that, but the journey is taking longer. The average commute now lasts 26.2 minutes, up from 25.4 minutes in 2011.

room to grow

These long-term trends shine a spotlight on why continued investment in bus rapid transit and subway projects is so important. We know growth will continue, and we should do our best to be ready. Here in York Region, we’re expected to have 300,000 more jobs and 590,000 more residents by 2041. Imagine the toll that could take on our already busy roads.

transit commuting on the rise

Over 20 years, transit commuting in Canada increased at a higher rate than driving to work – up 60% compared to a 28% increase. However, before people can ride transit, someone has to build it.

While StatsCan found transit commutes were taking longer as of 2016, the beauty of our rapidway system is that commutes generally won’t get longer. As traffic increases with our Region’s growing population, the buses can bypass congestion in the dedicated rapidway lanes and continue to provide consistent travel times.

the suburban work shift

The Toronto CMA alone, which includes York Region, added 191,450 more commuters over 20 years. As of 2016, a greater proportion of these commuters were working in the municipalities surrounding the City of Toronto. Statistics Canada says this indicates a slow shift of workplace locations from Toronto to outlying communities. Markham with its booming tech sector, and Vaughan with its new developments, are prime examples

With the suburbs attracting more businesses and jobs, investing in transit infrastructure now is the ticket to keeping our economies moving well into the future.

 

Categories
Commissioning Construction Facilities and terminals Rapidways Safety Stations Technical

beautiful curves of glass

If you’ve ever had to replace a window in your house, you know that working with glass is fiddly, exacting work. It needs to fit perfectly or you’ll get drafts and leaks. Glass has no tolerance for being the wrong shape or size. And dropping a pane from a window: well, that means another trip back to the store.

Now, imagine the challenges of installing the glass on the curves of our new Vaughan Metropolitan Centre [VMC] rapidway station. As you can guess, it was a long, multi-stage process, done with great care and precision.

strength and safety

As with all our vivastations, the VMC glass was laminated and tempered for strength and safety. First the glass was cut into panes, and then it went through a special process to make it extra strong. This way, if it breaks, it crumbles into small granular chunks instead of sharp pieces.

To add more strength and make it even safer, we then laminated the tempered glass by sandwiching two glass sheets together around an interlayer. If the glass is broken, the interlayer holds the small pieces together instead of breaking into many little shards, the same way a car windshield stays together in an accident. The interlayer on the blue skylight glass is actually a different, stronger material than the interlayer used for the clear side glass, since the top skylight needs to support heavier loads from snow and maintenance workers.

creating curves

Fitting flat glass to the curved shape of the station was a challenge, because every surface of the steel roof curved over two dimensions, much like the outside of a ball. The first step was to divide the glass into a series of triangles. Three-sided shapes are easier to work with compared to four-sided shapes, the same way a tripod is more stable on uneven ground compared to a four-legged chair.

But this still left the challenge of fitting flat pieces of glass over a curved frame. The solution here was to adjust the bolts on the corners of the spiders [the stainless steel fittings that hold  the glass pieces onto the frame] so they’re each set at a different height. We knew how high each bolt needed to be from 3D scans, so we adjusted them before we installed the glass. By installing each corner of glass at a slightly different height, we recreated the curves of the tubular steel frame.

intricate jigsaw puzzle

The last step was putting the glass panels in place, one by one. Although they were all triangles, every piece was unique like pieces of a jigsaw puzzle, so to avoid mix-ups they were carefully numbered before they were delivered. Once the glass panels were bolted onto the spiders and the final adjustments made to perfect the curve of the glass, we sealed the gaps with caulking to make the structure weather-tight.

Building this strong and beautiful glass-covered station took precision, but look at the stunning results! This landmark station helps set the architectural stage for future development at the VMC and makes the everyday experience of transit a beautiful one for our customers.

Categories
Commissioning Community Events Facilities and terminals General Innovation Rapidways Stations Subways

amazing team, extraordinary results

What a week it has been! The launch of the TTC Line 1 subway extension with the Highway 7 West rapidway and vivastation on Sunday in Vaughan is one of those lifetime moments. We’re going to remember this day for the rest of our lives. This is the day everything became a little closer, and a lot faster for York Region and the City of Vaughan.

unwavering dedication

For everyone involved, including us at York Region Rapid Transit Corporation, it was an exhilarating and emotional weekend, the culmination of years of incredible challenges and unwavering dedication, everything we’ve been working toward for a very long time! Many of us shouted and cheered as the first train pulled into the new subway station.

Then, seeing that Viva bus roll down the red asphalt rapidway into the open, airy Vaughan Metropolitan Centre vivastation and pick up actual passengers who came up the stairs from the subway – well, it’s hard to describe the feeling, except to say that more than a few grew a little misty-eyed! So many people came out to mark this milestone day for transit in the Greater Toronto and Hamilton Area, we know how much these new transit connections matter and we thank you for your patience during the long construction period.

#AnEngineerWasHere

Kudos goes out to the engineers, planners and project team, whose tireless drive moved the VMC station and rapidway project forward every step of the way: from the environmental assessments to the design to breaking ground, from utility relocations to storm sewer work and road widening. Along with the many contractors, they pushed though good and bad weather, scalding heat, freezing cold and everything in between. They worked through paving and bridge reconstructions, to timelines off schedule and on again, to the construction of our vivastations and our landmark Vaughan Metropolitan Centre vivastation. Experts from many agencies, cities and private companies all came together to make this day happen.

Now we have incredible, tangible results with the first subway-BRT connection, a legacy that will keep our Region moving for years to come. Just goes to prove anything is possible with extraordinary teamwork, unwavering dedication and an eye to the future. Again, thank you for supporting this project and we hope you get out and try the new system!

Categories
Announcements Commissioning Community Events Construction Facilities and terminals Rapidways Stations Subways

Subway and new Viva connections NOW OPEN in Vaughan!

This morning, the first subway carrying transit customers arrived in York Region, forging a historic connection between bus rapid transit and subway. Now, everyone can experience seamless transit connections in Vaughan! The vivaNext rapidway and new landmark vivastation also opened for service this morning with an epic celebration at Vaughan Metropolitan Centre [VMC], alongside the TTC Line 1 subway extension opening. Viva la subway!

Read the news release.

even more transit connections

Now the transit connections available to customers simply go further and faster. The rapidway-subway connection marks a tipping point for transit in York Region, amplifying the power of the Viva rapid transit network.

The VMC area is a transit powerhouse, home to two new stations: the landmark Vaughan Metropolitan Centre vivastation and the Vaughan Metropolitan Centre subway station – the new terminus of TTC Line 1. In a few months, the SmartCentres Place Bus Terminal will make the VMC area even better, connecting YRT buses to both stations with a pedestrian tunnel.

true city building

There’s no doubt – your destination has arrived! The new VMC development is true city-building on an epic scale, built on the foundation of strong transit connections. Not only does rapid transit transform how people move in our Region, it changes how we live – for the better. Stronger economies, more jobs, and walkable, livable, desirable communities: it’s the driving force behind York Region’s Transportation Master Plan and the reason we build rapid transit.

On an even larger scale, strong connections like these that cross regional borders are crucial to the Greater Toronto and Hamilton Area [GTHA], and a key strategy of the Metrolinx Draft 2041 Regional Transportation Plan.

Thank you!

Now we can see the network take shape in York Region, with three rapidways running, two more underway and an actual subway connection!

Changes of this magnitude are fueled by the power of collaboration and funding partnerships. Our rapidway projects are funded by the Province of Ontario, and our other projects are funded by a combination of Federal, Provincial and Regional contributions. SmartCentres Place Bus Terminal even includes some private funding for the pedestrian tunnel.

We’ve all come a long way together, and we thank you for your patience during construction. Now, we hope you enjoy the ride!

Categories
Announcements Commissioning economic & financial Facilities and terminals Innovation Rapidways Stations Subways

The ribbon is cut! Trudeau and Wynne came! Now only two days until subway meets BRT!

This historic weekend of transit firsts in Vaughan kicked off in style.

Prime Minister Justin Trudeau joined Premier Kathleen Wynne, Toronto Mayor John Tory and many other dignitaries to officially cut the ribbon on the Line 1 subway extension, at Vaughan Metropolitan Centre [VMC]. Then, they rode the subway from the VMC station to the new York University subway station for a press conference.

“The Toronto-York Spadina Subway Extension will mean a faster commute, less time in traffic and more money in people’s pockets as they trade their cars for a subway ticket,” Prime Minister Trudeau told the crowd at York University station.

That’s music to our ears!

The crowd included partners from all three levels of government, who worked together to make this project a reality. Also on hand were many members of our vivaNext team, who played a key role in this project, working with the TTC on the York Region stations. Joining the crowd were the many partners who helped make this happen.

three subway stations in York Region!

In just two days, York Region will have three shiny, new subway stations open for service: Pioneer Village, Highway 407 and the end of the line, Vaughan Metropolitan Centre. On opening day and Monday, members of our team will be on hand to answer your questions and help you find your way.

Our brand new, flagship bus rapid transit station will greet riders at the VMC, forging the connection between our rapid transit network in York Region and the new subway.

Also coming later this month is the GO train connection at the new Downsview Park station, where commuters on the Barrie GO train can connect to the Line 1 subway extension.

“If we build it, they will come”

Now, with the 8.6-kilometre subway extension, downtown is a mere 42 minutes away, but we expect subway traffic to flow both ways. Wayne Emmerson, York Region Chairman and CEO, said, “If we build it, they will come.” He called the subway a “once in a lifetime opportunity,” saying it “will help further develop an urban community that is transit-oriented, forward-thinking and has economic development opportunities to benefit current and future generations.”

“Big transit takes time”

Premier Wynne acknowledged the time and effort of all levels of government that came together to connect the heart of York Region to downtown. She also gave a nod to our new Highway 7 West rapidway, saying that downtown foodies can hop the vivaNext rapid transit system to restaurants in Richmond Hill.

But she summed it up best with: “What an amazing day this is!”

We agree, Premier Wynne! And this Sunday will be even better, when the subway and our rapidway open for service, and you can experience the ride firsthand. It’s going to be a rush! We hope to see you there.

Categories
Commissioning Construction Facilities and terminals General Rapidways Stations Technical Traffic signals

proof of performance

The days are counting down and the excitement is growing. The launch of our extraordinary new vivastation at Vaughan Metropolitan Centre, along with the ground-breaking TTC Line 1 subway extension and our rapidway, is only four days away. Now we have one last crucial task to complete before our gorgeous new station joins the transit mega-hub at the VMC: we need to carry out commissioning.

testing, one, two, three

Commissioning of the new bus rapid transit station is similar to the process we do for all our new stations, rapidways and facilities. Very simply, it means confirming everything we installed, from the heaters and automatic doors in the passenger enclosures, to the cameras, speakers and variable message signs [VMS] on the platforms, works the way it’s supposed to.

Before their work is done, our builders have to test every single device and piece of equipment to demonstrate they met all their obligations. The station has complex equipment for fares and security, and all the general building components like lights, plumbing, and electrical connections. Systems connect to the central York Region control room, enabling them to see the platforms, hear the speakers, run messages on the VMS and communicate through emergency call buttons. During commissioning, every light switch, outlet and connection is tested. Our builder also works with the new station owners, YRT/Viva, to help them assume operation.

smart systems

The new station is part of a highly sophisticated system which includes the broader rapidway network and its whole range of intelligent transportation system [ITS] features. ITS is really the reason Viva is able to operate as a rapid transit service, keeping our system running on time with supervision from YRT/Viva’s central control room.

trial run

A critical part of commissioning is testing the newly finished components in the new VMC station and the surrounding rapidway, to make sure they’re all connected properly to the control room and the rest of the system. Testing for full integration requires that we run buses through the new rapidway for a day. During that process, we’ll make sure that all the traffic-related components are communicating properly to the buses and to the general system, and ensure the traffic signal timing is set for optimal travel times.

This station has one more layer of complexity beyond the other stations we’ve built, because of its connections to the TTC. We need to check every interface with the TTC system, which includes electrical connections running between our station and their panels below.

Commissioning is the final step, and you can see why it’s so important to do it carefully and methodically. Because of that complexity, some work will continue on the station in 2018. But once it’s finished, get ready to celebrate and enjoy faster transit with us!