Categories
General Uncategorized

tis the season to support your local businesses

It’s that time of year again, holiday decorations adorn windows and doors, festive music fills the air and it seems everyone’s in a rush to go somewhere.  With the holidays fast approaching, you may be feeling a little overwhelmed with what to get that special someone.  Don’t fret the businesses along the vivaNext corridors are here to help you find the perfect gift.

The shops and services on Highway 7 and Davis Drive will take the stress and worry out of your holiday shopping. Your local merchants will help you find that perfect treasure for those nearest and dearest and will help you cross everything off your holiday shopping list. While you’re out and about, take a break from shopping with a stop at one of your favourite restaurants. Why not hop aboard yrt/viva to get you to and from your destinations?

Once you’re done shopping and you’ve checked your list twice, pour a glass of eggnog and congratulate yourself on a job well done!  You got all your shopping done with a little help from your local businesses.

Support your local businesses this holiday season. Your neighbours look forward to seeing you!

 

    [poll id=”45″]

 

Categories
Construction General Uncategorized

getting ready for winter

If you have a property with a garden, you’ll be familiar with the list of things you do every year to get things tidy and safe before it freezes up out there. We face the same kind of to-do list along our construction zones on Highway 7 and Davis Drive, although the key difference is we’ll still be actively working throughout the winter (I’ll tell you more about what we’ve got planned for the winter months in an upcoming post).

But in terms of getting things all tidied up, here’s what you’ll see us doing over the next couple of weeks to get ready for the snow and ice.

Our top priority, as always, is making the construction zones as safe as possible for pedestrians and drivers.  For that reason much of our pre-winter activity involves ensuring that sidewalks and boulevards are free of hazards, and hazards that cannot be removed are carefully fenced off.  In some cases we’re finishing the grading and construction of some boulevards, and in others installing temporary walkways and ramps where work isn’t scheduled to be finished until next year.

Snow fences are being installed behind sidewalks in areas where work is continuing, to help mark the safe route for pedestrians.  And because of ongoing roadwork and other activities, some sidewalks will remain closed.  We’ll make sure there’s a clear route for pedestrians through work zones, although it may require crossing from one side of the street to the other. Look for directional signage to know where it’s safe to walk, and how to access bus stops – for your own safety it’s critical that pedestrians stay out of work zones.

During construction, road and sidewalk maintenance is the responsibility of the construction contractor within the project areas.  But during the winter, the Region and local municipalities are responsible for ensuring the roads and sidewalks are kept clear. For that reason, another top priority before winter is to ensure every aspect of the construction zones is compatible with the requirements for winter maintenance operations.

This means making sure the snow-clearing equipment can manoeuver through the construction zones, boulevards and platforms.  Our design work and construction staging plans have always had those requirements top of mind, but we walk through the sites with Regional and municipal staff again before winter to identify any little details that might impede their operations.

And to keep traffic moving throughout the winter, we’ll be taking steps to make travel lanes as straight as possible through the construction zones, and ensure markings are clear.

Just like at your home, we like to get everything tidied up and in order before winter, so we’re going to keep working steadily at it until we’re forced to stop by severe winter weather.  Once that happens, we have a long list of other activities we will continue with, so stay tuned.

 

Categories
Announcements General

‘Holey’ ‘Moley’ tunnelling is complete!

photograph provided by The Toronto Transit Commission [TTC]

Here at vivaNext, we’re excited to announce that the Toronto-York Spadina Subway Extension (TYSSE) project has achieved another significant milestone – tunnelling for the project is 100% complete!

In the summer of 2011, the first Tunnel boring machine (TBM) “Holey” began boring from a launch shaft at the Downsview Park Station site. Since then, rain or shine, TBMs “Holey”, “Moley”, “Yorkie” and “Torkie” have been working hard and have collectively bored 6.4 kilometres of twin tunnels for the TYSSE project.

The final segment of tunnelling was finished when “Torkie” broke through the headwall at the Vaughan Metropolitan Centre (VMC) Station site, finishing the tenth and final tunnel drive for the project. This sets the stage for the next phase of work in the tunnels including installation of inverts and walkways, track, traction power, signals and communications systems.

With help from our friends at Toronto Transit Commission (TTC) we have some pretty cool photos and videos of the breakthrough to share with you on our website – see them here!

The TYSSE is an 8.6-kilometre extension of the TTC’s Yonge-University-Spadina subway line from Downsview Station to the VMC Station at Highway 7 in York Region.

Vaughan’s VMC station will be the northernmost station, connecting to a variety of other transit services. Situated in the future VMC development area, this station will act as a transportation hub, including convenient passenger pick-up and drop-off, a York Region Transit bus terminal, and connection to the viva rapidway running in dedicated lanes east and west along Highway 7.

Residents and visitors alike will enjoy the variety of transit options and mixed-use development offered in the VMC area. It will be a great place to work, shop or relax, and getting there will be easy whether you walk or ride transit.

Construction work for the TYSSE project is expected to be completed by fall 2016. Once the subway extension is completed, it will have 6 new subway stations (check out the TYSSE guide to station names) and 3 new commuter parking lots.

To learn more about the TYSSE project and sign up for construction notices, visit vivanext.com.

Categories
General Uncategorized

wouldn’t you like an extra 32 minutes a day?

Did you know that a recent American study showed that people, who live in areas with good access to transit, are more satisfied with their quality of life than people who don’t have easy access to transit?* This is one of the reasons cited by an intriguing new public awareness campaign, arguing that more and better access to transit is good for communities, families and individuals.

The new campaign – dubbed Your32 – is an initiative spearheaded by the Greater Toronto CivicAction Alliance, a not-for-profit advocacy organization that promotes the economic, social, and environmental benefits of building transit infrastructure across the Greater Toronto and Hamilton Area.  The campaign is being done in partnership with a wide range of leaders representing key sectors across our communities and economy, including business, academia, labour and financial.

The big-picture benefits of transit are well known: it’s better for the environment; it will reduce the gridlock that’s choking our roads; and it will help our economy and productivity.  All of which are reason enough that we need more transit in the GTHA, and we need it now.

But ultimately we all live our lives at a personal level, and this is what the Your32 Campaign does that’s so interesting: it brings the benefits closer to home for each of us.  Your32 refers to the estimated 32 minutes per day that people would save on their commute once the Metrolinx transit plan for the GTHA (The Big Move) is fully funded and built.  32 minutes is the difference between the projected future average commute time if no comprehensive transit system is built, and the average future commute time with the big move.

32 minutes a day: that’s a lot of time over the course of a year – 8 full days – that you could be doing something better with.  And over the course of your life it adds up to about two years of found time.   There are a lot of ways most of us could imagine spending 2 extra years, beyond spending it sitting in gridlock.

The Your32 website has a lot of really interesting facts and figures about commuting and how better transit will benefit all of us, and its aim is to encourage people to become more knowledgeable about the issues and possible solutions.  The campaign is asking people to “pledge” their support for new funding sources that are “dedicated, efficient, transparent & accountable, regional, fair, and sustainable”.  And ultimately, its objective is to continue to build support from people and governments at all levels for more funding for transit in the GTHA.

We’re proud that vivaNext and York Region are already helping lead the move for more transit, and we’re pleased that such a useful campaign is underway to help reach more people and get out the true facts about transit.  I recommend this initiative to anyone interested in learning more, and to add their voice calling for senior levels of government to fund the transit we all need.

 

Categories
General Rapidways

viva rapid transit vehicles – providing comfort and style

With the opening of the new rapidway on Highway 7 from Bayview Avenue to Highway 404, vivaNext has not only created placemaking structures but has transformed the way public transit is viewed.  The shelters are sleek and beautiful; the roadways are open and faster but most impressive are the buses that travel along these routes.

Nova Bus, based in Quebec, custom made and delivered twenty seven new vehicles in 2013 bringing the viva fleet to 123 vehicles; 40 foot vehicles and 63 foot vehicles.

York Region Rapid Transit (YRRTC) first procured viva vehicles in 2004 through an international request for proposals.  At that time the North American market did not manufacture any new, environmentally, comfortable buses and the contract was awarded to VanHool in Belgium.  In 2009 YRRTC once again put out a request for proposal for new vehicles and we were thrilled to have competitive submissions from North American companies.  After a rigorous process the contract was awarded to Nova Bus to manufacture the new vehicles maintaining the existing look and feel of the viva feet and all the comforts and benefits its customers have come to love.

The new Nova vehicles seat 56 passengers, plus the driver and have 2 mobility device stations, plus standing room.  Large platforms are located at both the front and back door for quick and convenient boarding.  A 32 inch wide electric ramp and a “kneeling/lift” floor system provides roll-on, roll-off access for those in mobility devices or pushing strollers.  This feature combined with the new near level boarding stations makes viva a full accessible transit system.  The new Nova has the accessibility ramp located at the front of the bus so that the driver can quickly activate and assist anyone requiring this feature.

All of the viva fleet comes with green light sensor systems which allow the GPS system to track their movements and allow central dispatch to update arrival times on the variable message boards at each station along the route.  This “smart technology” also has the ability to hold green lights or advance red lights at intersections if the vehicle is running behind schedule.

One of the great features of the viva rapid transit services is the soft, smooth ride which is provided by the state of the art-ride suspension on the vehicles.  The rear mounted engine allows for a quieter ride and helps keeps bumps to a minimum.

Canadians should be proud that our country is able to design, manufacture and deliver such quality transit vehicles and our customers are certainly appreciative of all the comforts they provide to their commute!

Categories
Construction General Rapidways

happy national housing day

Having a home is probably one of the most important and basic needs people have, and National Housing Day was introduced to remind us we should never take this fundamental need for granted.  This year National Housing Day is Friday November 22, and it’s being marked by special initiatives all across the country including here in York Region, where the Region is hosting a special social media and web-based campaign to raise awareness about the importance of affordable housing.

One of the biggest challenges facing our Region is that people have limited choice when it comes to affordable housing.  Traditionally a suburban region, many York Region residents have chosen to live in low-density single-family homes. As wonderful as that choice is for many, many families, there are some people who want – or need – other options.  And until recently, people who wanted to live in other forms of housing had very limited choices within the Region.

York has the lowest percentage of rental accommodation in the entire GTA. In some cases, that has meant people who want to live in York Region to stay near their families, or their jobs, have had to move away.  Whether it’s a young professional in their first job who has had to leave York Region to find affordable housing, or an older person who can’t manage a larger home on their own any more, too many people have found it hard to stay here at home.

Fortunately that’s changing, and VivaNext is a key driver that’s helping to expand the housing choices available here in York Region.

All along the viva routes, we’re seeing more and more housing being developed or proposed, including higher density developments near our new urban centres. Taking the direction from Regional Council, 35% of new housing in the centres and key development areas along the corridors have to meet affordability criteria, which is going to meet a key need here in York Region.

Building residential units along transit can help to reduce housing costs, since developments don’t have to include as much underground parking spaces.  This can reduce costs per unit significantly.  Another benefit of building near transit means people can get around without needing a car.  Whether you’re a young person moving out for the first time, or an older person who is happy to give up the keys to the car, that’s a significant advantage.

The best thing is that people who want to stay in York Region are now more able to, because rapid transit and long-term planning together are resulting in more choices, and more affordability.

So on November 22, give a thought to how much it would mean to you to be able to stay in the community you love, and to have a variety of affordable options to choose from.  We’re really pleased to be helping make that more possible, and wish you a Happy National Housing Day.

 

Categories
Announcements Community Events Rapidways

you’re invited to our Yonge Street open houses!

The next generation of rapid transit is coming to Yonge Street in Richmond Hill and Newmarket! In both communities, Yonge Street will be widened to accommodate dedicated rapidway lanes in the centre of the road, providing fast, reliable, convenient transit, while enhancing the area as an attractive destination for residents, businesses and visitors alike.

In Richmond Hill, the rapidway will extend 6.5 km and include 7 new vivastations from Highway 7 to 19th Avenue/Gamble Road. In Newmarket, dedicated bus rapid transit lanes will run along 2.4 km and include 3 new vivastations from just south of Mulock Drive to Davis Drive.

This project is moving full steam ahead with work beginning in 2014, and we want you to talk about it with us at our open houses this week! This is your chance to look at information boards and maps, and talk to vivaNext staff about what you can expect during the construction season ahead. You will also learn how a rapidway works and discuss the benefits it will bring to the community.

The same information will be available at both open houses. We hope to see you there, but if you can’t make it, you can subscribe online to receive construction updates and view all of the materials on our website after the meeting.

You’re invited!
Richmond Hill
When: Tuesday, November 19, 4-8 p.m.
Where: Richmond Hill Presbyterian Church
10066 Yonge Street, Richmond Hill

Newmarket
When: Wednesday, November 20, 4-8 p.m.
Where: Ray Twinney Recreation Complex
100 Eagle Street West, Newmarket

Learn more about the Yonge street rapidways ahead of the open houses by reading our Yonge Street project newsletter, and as always, feel free to contact us with any questions you might have at contactus@vivanext.com.

 

Categories
General LRT Rapidways

choosing the right form of transit

In September the Province set up an expert panel to look at how Metrolinx should be expanding transit in the GTHA, and to propose realistic options to pay for it.  The panel has just released their second discussion paper, and it’s well worth a read for anyone interested in getting beyond the rhetoric and really understanding the facts and issues.

Certainly the issue of what transit technology should be funded, and where it should run, is a subject that’s dominated the headlines for months and is of interest to everyone.  It’s understandable that so many have views on this subject, and it’s also reasonable to expect that the people doing the planning should listen to those views.

But in the final analysis, choosing a mode of transit – the main rapid transit options are subway, LRT, BRT and commuter train – shouldn’t be treated like a popularity contest. There’s just too much money involved.  Each mode of transit has its uses, benefits and drawbacks.  Those qualities are well known to transit planners, and need to be thoroughly and objectively analyzed in the context of local circumstances including passenger volumes, current and anticipated densities, employment projections, and present and future land use patterns.

Planners ideally will look at a range of transit modes to meet the needs of users across a region or area, with the primary consideration being a seamless system that enables passengers to make easy, fast connections.  That doesn’t necessarily mean the trip will be non-stop, or use the same technology the entire way.

This is a concept we all already live with, so we shouldn’t expect transit to be any different. Pretend you are taking a trip to a small island in the Caribbean.  You’d probably drive to the airport, then you’d get on a big jet, then most likely transfer to a smaller plane for the last leg, or maybe even a boat if you were going somewhere out of the way. You’d never expect the big jet to swing by your house to pick you up at your door, then whisk you non-stop to the tiny island.  Getting around the GTHA, depending on where you’re travelling from and to, follows the same logic.  Some riders may need to take surface transit, then transfer to one form of rapid transit – and then possibly to another mode to complete their trip.  The key point is to create a system that gets you there as fast as possible.

In a world where there’s only so much new money available for transit, careful decisions are needed to ensure final choices get the greatest number of people into transit, reducing gridlock on the road system.  The most costly option – subways – should be reserved for where it will do the most good, i.e. get the greatest number of cars off the roads.  Given that the need for new transit massively outstrips the money available, every single transit dollar needs to be spent wisely.

Professional analysis of facts has always been the basis for our vivaNext decisions. That’s why we’re installing BRT – the lowest cost form of rapid transit – along Highway 7, with the option to change to LRT when future volumes justify it.  On the other hand, the ridership and future employment projections do justify the cost of extending the subways north to the VMC, and along Yonge Street from Finch to Highway 7, so our plan includes subways too.

We’re proud of the system we’ve planned and are building for York Region, and are looking forward to the day when it will be connected to a system that covers the entire GTHA.  Now that’s something we think everyone will support.

Categories
Construction General

clearing the way for construction

If you’ve ever watched a new subdivision get built, you know how fast the work seems to advance.  Crews install utilities, build rough roads, and before you know it there’s an entire subdivision ready for families.  But building a new roadway in a densely built-up area is a completely different challenge: the work seems to go on for a long time, and progress is hard to detect unless you know what you’re looking for.

We’ve been working flat-out on Davis Drive for a year now, with dozens of complex activities underway or completed from Yonge to Leslie.  Even so, most of our effort so far has been about clearing the way, rather than constructing a rapidway and stations.

That’s the predictable reality of modernizing our roads and revitalizing Newmarket’s infrastructure, but it’s worth explaining why we can’t get going on roadway construction until these steps are completed.

A key work priority has been to build retaining walls to enable the road widening along the hilly contours of Davis Drive,  with that work now nearing completion.

And like all major thoroughfares, the foundations of the existing Davis Drive roadway are literally lined along both sides with existing critical infrastructure carrying water, telecommunications, gas, storm sewers and sanitary sewers.  Much of this infrastructure crosses the road at intervals and in many cases the various utilities are stacked up in multiple layers.  In addition, at the sides of the road are hydro poles and lines, transformers for electricity and telecommunications, fire hydrants, and a whole range of privately owned signs for businesses and commercial buildings.

As much as we love getting to the stage of putting down asphalt and constructing the beautiful viva stations, we can’t start this until the right-of-way is completely clear. Once we’ve built the retaining walls, we need to relocate everything else, one element at a time, further back and out of the way of the new wider roadway.  Relocating utilities is a complex task in itself, requiring a highly detailed level of coordination between gas, hydro, telecommunications and other utility companies.

Each type of utility has its own specific requirements about how and where it can be relocated, and which one goes deepest, which has to be installed last, and so on.  Each element requires its own program of design work and approvals.  And lastly, different crews are responsible for specific utility relocations, and there are rules about how closely they can work relative to adjacent work crews.

So the job of getting the roadway clear for construction is a huge, time-consuming and enormously detailed process – without even considering the new bridge and retaining walls that are underway. With multiple activities to be carried out in each block, some people may wonder why we’re not progressing more quickly.  But the reality is that we’ve already completed much of the work needed to clear the roadway, and widening has already started in some segments.  Because so much of the work is underground, there isn’t much to see yet.  But as crews start paving, it will feel and look like progress is starting to take shape.

Even though building a rapidway is a long process, people along Highway 7 in Richmond Hill and Markham can attest that the transformation does come to fruition. Residents and visitors alike are now enjoying the Highway 7 rapidway. We look forward to the day the Davis Drive rapidway is complete and Newmarket can enjoy the finished result too.

Categories
Construction General Live-work-play Rapidways

bringing vaughan metropolitan centre to life

We recently posted a great blog on planning that talked about the link between transit and new urban communities. Given that tomorrow (November 8), urban planners from towns and cities in over 30 countries worldwide will celebrate World Town Planning Day, we thought we would take a moment to highlight another one of York Region’s amazing communities, and see how vivaNext transit projects fit into York Region’s planning vision.

In the Region’s Centres and Corridors strategy, selected areas in Newmarket, Richmond Hill, Markham and Vaughan are targeted to have new, urban “downtowns.” They will be vibrant, higher density, attractive destinations with a full range of amenities so that people can live, work, shop and play in the same community. These “centres” will be connected by transportation “corridors” that will make it easier for people to get around the region. That’s where we come in. Our vivaNext rapidways will run along the corridors, connecting the centres through transit and safe and efficient travel options for pedestrians, motorists and cyclists alike.

You can see the vision for one of these centres coming to life in the City of Vaughan’s new video about the Vaughan Metropolitan Centre [VMC] . Located in the heart of Vaughan, centered on Highway 7, between Highway 400 and Creditstone Road, VMC will be one of the largest and most ambitious development projects in the area’s history, and is a superb location for Vaughan’s new downtown.

In the VMC, mixed-use transit-oriented development is proposed along a tree-lined main street, including businesses, residences, entertainment and cultural facilities, as well as pedestrian shopping areas. The VMC area will act as a transportation hub, including convenient passenger pick-up and drop-off, a York Region Transit bus terminal, and viva rapidways running in dedicated lanes along Highway 7.

VMC will also be home to the northernmost subway station, as part of the Toronto-York Spadina Subway Extension [TYSSE], an 8.6 km subway extension from Downsview Station, northwest through York University and north to the Vaughan Metropolitan Centre. An entrance to VMC Station will be built on Millway Avenue, between Edgeley Boulevard and Jane Street to provide easy and efficient connections to other transit services.

With approximately 442 acres of development opportunities, VMC also includes:

  • Projected office development: 1.5 million SF
  • Projected retail development: 750,000 SF
  • Minimum of 12,000 residential units
  • Population potential: 25,000 new residents
  • Employment potential: 11,000 jobs of which 5,000 will be office jobs

It’s exciting to visualize how Vaughan will evolve in the years to come. To find out more about other vivaNext projects, visit our projects page.