Categories
Community Events Video

next stop… Yonge! the sky is the limit!

YouTube video: next stop... Yonge! Colouring Contest

What do you get when you give imaginative minds a box of pencil crayons, paper and creative license to draw their vision of the future of transit? Some pretty amazing masterpieces!

This fall we teamed up with the Town of Newmarket’s Recreation and Culture Department along with the Newmarket Public Library to give kids between the ages of 6-12 a challenge. We wanted to see their vision of what transit on Yonge Street will look like in the future. We received many colourful masterpieces brought to life as part of our Next Stop….Yonge! Colouring Contest.

Check out our latest video for a glimpse of the amazing entries we received. We’re sure you’ll agree that selecting our winners was no easy task. Congratulations to Avery [age 6-8], Sienna [age 9 and 10] and Olga [age 11 and 12]! Visit the contest page to see all the artwork we received.

We can’t wait to see what the future of transit holds for the next generation, the sky is the limit based on their imagination!

To find out what we’ve been up to in your community, check out our community events page.

 

Categories
Construction Video

look way up there!

look way up there!

The installation of hydro poles on Yonge in Newmarket is a major milestone for the bus rapidway project. By the end of construction, about 100 new hydro poles, most of which stand at 100 feet tall, will line the corridor from Savage Road/Sawmill Valley Drive to Davis Drive. Installing these gigantic poles is no small feat, because each one weighs 20,000 pounds. To do this work safely, traffic has to be stopped for a short period of time in all directions while each pole is hoisted high in the air, rotated and then carefully lowered onto concrete foundations.

The pole design has a grey concrete finish and due to their foundations, do not require supportive wires. This helps to reduce the visual impact and contribute to an inviting streetscape once the final boulevards and sidewalks are all in place.

Our latest video goes behind the scenes and gives you an up close look at the hydro pole action. Check it out, we’re sure you’ll agree, there’s nothing small about this part of the Yonge project.

We love hearing from you! So if you have any questions or comments, let us know at contactus@vivanext.com. To stay up to date on construction, sign up for email updates at vivanext.com/subscribe.

 

Categories
Communications Construction Rapidways Stations Uncategorized Video

the ballet of building the VMC canopy

Vaughan Metropolitan Centre – Spadina Subway Station

The giant sections of structural steel canopy were installed this fall in the Vaughan Metropolitan Centre [VMC] area – right in the middle of Highway 7 West – and it was a ballet of precision.

Having a large structure like this arise in the centre of a roadway is an incredibly unique construction event.

That’s why we made sure we were out on the corridor watching and recording the action to share with all of you.

The largest section lifted was 25,000 lbs – over 11,300 kg! You can read more about this new Vivastation, and check out the video to see how this feat was done.

 

Questions or comments? Comment below or email us at contactus@vivanext.com. To stay up-to-date on construction, sign up for email updates at vivanext.com/subscribe.

 

Categories
Announcements Rapidways Video

celebrating the completion of the Davis Drive rapidway

YouTube video: timelapse of Davis Drive

Last week, the Honourable Steven Del Duca, Minister of Transportation; Wayne Emmerson, Chairman and CEO, The Regional Municipality of York; Bruce McCuaig, President and CEO, Metrolinx; the Chairman of the YRRTC Board, Frank Scarpitti, Mayor of the City of Markham and Tony Van Bynen, Mayor of the Town of Newmarket, joined together to celebrate the transformation of Newmarket, with the completion of the bus rapid transit (BRT) rapidway project on Davis Drive.

The Davis Drive rapidway was opened for the new Viva service in November 2015, extending 2.7 kilometres from Yonge Street to Roxborough Road, with service continuing in mixed traffic another 2.3 kilometres with curbside stops and a turn-around at the new park and ride facility at Highway 404. This past spring, crews began work on the finishing touches such as planting trees and installing the last sections of sidewalk.

Rapid transit along Davis Drive promotes growth and development, and supports the priorities of the Town of Newmarket’s Strategic Plan, York Region’s Centres and Corridors plan, Metrolinx’s Regional Transportation Plan for the Greater Toronto and Hamilton Area (GTHA) and Ontario’s Growth Plan for the Greater Golden Horseshoe.

Along with providing a convenient new travel option, the Davis Drive rapidway project helped transform Newmarket with updated utilities, new infrastructure such as a water main and the Keith Bridge, and wider boulevards. These improvements will help support the continued growth and development in Newmarket’s town centre.

The Davis Drive rapidway has been years in the making. We’ve captured the entire transformation on video. Through all the planning, design and construction there’s something special about knowing that you’ve contributed to the future growth and prosperity of entire neighbourhoods, towns and regions by connecting people to the places they work, shop and play.

We would like to sincerely thank the community, businesses and residents that have supported the project from the outset, and endured the disruptions that come with long term construction. Your patience, understanding and feedback have been invaluable. Newmarket now has a rapid transit system we can all be proud of and enjoy for many years to come.

 

Categories
Construction Safety Utilities Video

digging deep >> utilities at a glance

digging deep >> utilities at a glance

Before we can build dedicated rapid transit lanes, wider sidewalks, and plant beautiful greenery above ground, we need to go underground – to the world of utilities.

Our latest video peels back the layers to reveal all the modern conveniences we all depend on and often take for granted. We’ll shed some light on the steps we take to relocate critical infrastructure and explain why you see different crews come back to the same location as work progresses.

The most common things you’ll find are storm and sanitary sewers and pipes, water mains, gas mains, electrical wires, television/internet cables and phone lines.

We also take a look at the latest technology under the median and sidewalk planters , allowing trees and other plants to have deep, healthy root systems, and providing natural storm water management.

We’re just scratching the surface, but you’ll get a glimpse of how we replace and update infrastructure as an important investment that improves everyone’s quality of life.

 

Categories
Rapidways Safety Video

navigating the rapidways

click here to see the video -- rapidway intersections: safe journeys

Safety on the rapidway is everyone’s responsibility, and at vivaNext, we take it seriously. But that doesn’t mean we can’t look at an important topic in a light hearted way. You’ll need to watch our latest safety video to fully understand what we mean, but one thing is certain: you’ll be able to relate to one of our four travellers as they navigate our roads with Viva rapidways.

Motorist Molly, for example, needs to get to her mid-block destination, but gets stuck waiting for a left turn signal. What could be causing the problem?

Cyclist Cedric also has a turning concern while on the move. When travelling on dedicated bike lanes, making a left turn can be tricky business. Must he merge into dangerous traffic to get to the left turn traffic lane? Or is there an easier way?

Pedestrian Percy and his grandfather need to be fully aware of their surroundings when crossing the street, whether it’s to the vivastation in the centre lanes, or continuing to the other side.

However you get around, it’s important to understand what everyone else is doing to make sure your journey is a safe one. Watch the video, get to know the new surroundings, and take care when you’re travelling. Davis Drive and Highway 7 now have new ways to navigate, and there’s more to come!

 

Categories
Video

connecting Vaughan – east and west

connecting Vaughan – east and west

We’re building rapid transit in York Region – Bus Rapid Transit and subways – to connect York Region residents and commuters from north and south, east and west. Markham and Newmarket both have east-west rapidway connections, and next it’s Vaughan’s turn. From Yonge Street to Helen Street west of Highway 400, the new vivaNext rapidways will connect travellers with fast, convenient Bus Rapid Transit.

Vaughan Metropolitan Centre [VMC] is a hub of activity and the rapidway project is moving ahead quickly to open between Jane Street and Bowes Road by the end of 2016. Along the rapidway, Viva will stop at vivastations at Creditstone Road and Keele Street. Once the Toronto-York Spadina Subway Extension [TYSSE] opens in December 2017, Viva riders will also be able to connect at a vivastation west of Jane with direct access to the new subway station below, and a YRT bus terminal a short walk away. To see an overview of the project, check out our latest video.

This spring, construction begins on rapidways that will link vibrant communities in the east and west of Vaughan to the transportation options and development in the VMC, and to the rest of York Region.  We know it helps to be aware of what’s happening and when, so we promise to keep you informed and up-to-date along the way. If you haven’t already, be sure to subscribe to email updates for vivaNext projects, and follow us on Twitter.

Categories
Video

2015 >> Davis Drive – messy to marvelous!

2015 >> Davis Drive – messy to marvelous!

Davis Drive has seen remarkable changes in 2015. New vivastations, sidewalks, intersections and paving signaled a new beginning on Davis, allowing Viva yellow to take people where they need to go quickly, connecting to Highway 404, GO service at the Tannery and to Viva and GO at the Eagle Street bus terminal.

The investment in modernizing our roads and revitalizing Newmarket’s infrastructure will go a long way to making sure Davis Drive is built on a solid foundation that will serve the growing needs of Newmarket for many decades to come.

We’ve captured some of the pivotal moments during the year and compiled them in a video that introduces some of the notable changes to this important street.

Rapid transit is making it easier for people to move about York Region, connecting to the places, people and things that matter. With all the traffic congestion in the Greater Toronto and Hamilton Area [GTHA], rapid transit provides an alternative which is a relaxing and time saving convenience.

So, whether you are travelling across town or across the region, the rapidway is the way to go, and the future is looking bright for Newmarket.

Categories
Video

2015 >> what a year!

click here to see the Year In Review video

This was a landmark year, including opening an operations, maintenance and storage facility, the Davis Drive rapidway, and a park and ride lot in Newmarket. We’re at an important point with our rapid transit projects in York Region. All our funded projects are happening, and the results of the transformation are noticeable.

In November, the Davis Drive rapidway opened, connecting Newmarket east and west. Once sidewalks and landscaping are completed in 2016, Davis will have sidewalks lined with 470 trees and more than 21,000 shrubs and perennial plants.

Vaughan’s vibrant, new downtown is taking shape along Highway 7, with work continuing at a fast pace east of Jane Street on sidewalks, vivastations and landscaping. West of Jane Street, lanes have been shifted to their final configuration and work is being coordinated with the opening of the Toronto-York Spadina Subway Extension. The contract for the remaining rapidway along Highway 7 West in Vaughan was awarded in September, and utility relocations will begin in 2016.

On Yonge Street in Richmond Hill and Newmarket, utility work has begun and major road work will start in 2016.

The Highway 7 East project is now considered 100% complete, and has won multiple awards, including being listed as #2 in Road and Bridges Magazine’s Top 10 Roads list. Commute times are shorter on average, and the street is completely transformed from a highway with gravel shoulders, to a tree-lined street with wide sidewalks and accessible transit, welcoming to everyone.

In Richmond Hill, we opened an Operations, Maintenance and Storage Facility to support the growing fleet of Viva vehicles, and this massive facility was built to LEED Silver standards. A park and ride facility also opened in Newmarket at Highway 404, with the launch of the Davis Drive rapidway.

It’s been a landmark year, and there is more rapid transit and more connections to come, in 2016 and beyond.

 

Categories
Video

what’s behind the numbers on Highway 7 West

click here to see the video: fun facts - vivaNext in Vaughan

It’s been a busy year along Highway 7 in Vaughan. We thought you’d like to see a glimpse at some of what’s been accomplished in 2015 and a few snapshots of what’s to come.

In this video, you can check out some of the stages of work behind road widening, vivastation canopy creation (in case you weren’t driving by while it was happening), the expansion of the CN MacMillan Bridge, a whole host of retaining walls – plus a whole lot of greenery to be planted in the spring.

There are “tonnes” of information and stories behind the fun facts on Highway 7 in Vaughan!

Click here to subscribe to email updates about the progress of the vivaNext project.