navigating the complex world of traffic signals during rapidway construction

rapidway traffic signals in front of vivastation

As you can imagine, we think about traffic signals quite a lot here at vivaNext. They’re a part of everyday life and are essential to get from point A to point B for all users, including transit customers, pedestrians, cyclists and motorists. The stages of rapidway construction have their own traffic signal stages: temporary and permanent.

When construction begins on any of the vivaNext rapidway projects – such as the vivaNext Yonge Street rapidway project in Richmond Hill – traffic patterns and intersections shift to accommodate the new rapidway lanes. Therefore, temporary traffic signals are installed at signalized intersections. Here are some of the changes you’ll notice:

  • Vehicle detection technology – “loops”: Prior to rapidway construction and on completed projects, vehicle detection at signalized intersections is done with induction loops embedded in the road that sense vehicles above them. The loops detect vehicles, resulting in a change in the electrical field. This change is transmitted to activate the traffic signals based on the number of cars waiting.
  • Temp signals and sensors: During construction, however, temporary (“temp”) traffic signals are installed without loops. Since construction activities can damage them, and changing lane configurations can position cars outside of the loops, they can’t be used. So to keep traffic flowing at its best during construction, “Wavetronics Smart Sensor Matrix” technology is installed above the roadway at signalized intersections. This system uses radar sensors designed to detect and manage multiple lanes of traffic. It creates an image which allows the sensors to track the position of each car at the intersection, and activate traffic signals based on the number of cars at any given time. Sometimes, during times of high winds, the sensors can shift – and you may experience longer wait times at these intersections until crews can readjust the sensors.
  • New loops are installed during final paving: During the final paving stage of construction – before the permanent traffic signals are activated on each of the rapidway projects – new induction loops are embedded in the roadway.
  • Signal phases and protected left-turns: Each of the signals that an intersection produces [green, amber and red lights as well as transit signals] are called a phase. One of the new phases that the rapidway project introduced along Yonge is the protected left-turn signal [indicated by the green arrow]. This signal allows drivers to make left-turns and U-turns only while the left-turn signal is displayed, which allows for access to properties that are on the opposite side of the road. This phase also allows for improved traffic flow and fewer collisions, as vehicles no longer have to cross multiple lanes of opposing traffic.
  • Signal cycles: Signal phases together make up a cycle – the total time between the start of a specific display until that display comes up again. Additional time has been added to traffic signal cycles on Yonge, in order to accommodate the phase of a protected left-turn. For instance, if a cycle length at an intersection was previously 130 seconds before construction, it may now be 140 seconds to accommodate for the protected left-turns.
  • Transit signals: When the rapidway opens for service, buses will be traveling down the centre rapidway lanes for a faster and more convenient transit experience. They will have their own bus signals at each intersection that are connected to a GPS within each bus, and work in conjunction with the regular traffic signals.

have a question?

To ensure transit, pedestrians, cyclists and motorists move through intersections safely and efficiently during rapidway construction, the constructor regularly reviews traffic signal timing and makes any necessary adjustments.  If there appears to be traffic signal timing issues, please contact your Community Liaisons and they would be happy to look into your concern.

Categories
Crosswalks Design Intersections Rapidways Traffic signals Uncategorized

how intersections are changing on Yonge Street in Richmond Hill

how intersections are changing to accomodate rapidway on Yonge Street in Richmond Hill

As rapidway construction on Yonge Street in Richmond Hill progresses, dedicated bus lanes and vivastations are being built in the centre lanes.

This means the way that signalized intersections work is changing – especially if you’re a pedestrian, or a driver turning left or wanting to make a U-turn.

Here’s what to watch for:

Dedicated lefts and U-turns now happen at intersections

Signalized intersections will now have a dedicated left-turn traffic signal. This means that drivers can make left turns or U-turns only when the left-turn signal is illuminated. The protected movement through the intersection makes it safe and efficient to get you where you’re going.

To reach driveways mid-block

To get to driveways located mid-block on the other side of the road, drivers will no longer be able to turn left between intersections; instead drivers should make a U-turn at the next signalized intersection.

Making a left at an intersection is safer than cutting across multiple lanes of traffic, and ensures that drivers trying to turn left get their turn, and don’t have to rush through a yellow.

Changes for pedestrians

The new intersections will be wider with more lanes and new traffic signals. At intersections that will have vivastations, pedestrians may cross the road in two stages if unable to get to the other side during the first signal. A countdown signal will indicate how many seconds pedestrians have left to safely cross the street. 

Check out the video, “Rapidway intersections: safe journeys” for safe navigation of the new intersections for pedestrians, cyclists, driver and transit riders.

 For information about ongoing vivaNext projects, be sure to subscribe to email updates, and follow us on Twitter. Questions or comments? Comment below or email us at contactus@vivanext.com.

Categories
Commissioning Construction Design Rapidways Safety Signs and barrels Stations Technical Traffic signals Transit Uncategorized Utilities

why vivaNext staff do ‘walk-downs’ of our construction sites

constructions workers reviewing a roadway construction site for a transit project

Blog post by: Elizabeth Kim

Have you ever seen a group of people with white hard-hats walking along a rapidway construction site, although it seems like there isn’t much construction happening? Have you ever wondered, “How many people does it take to look in a hole?” or, “Why is everyone just standing around and talking?”

Well, we hope to help answer those questions.

getting a closer look

The constructor schedules regular walk-downs of each of our rapidway construction projects – from one end to another – in order to closely review completed, ongoing and upcoming work. Different walks have different purposes, including safety monitoring, the quality of work in progress and the quality of completed elements to ensure everything works as intended once the rapidway opens for service.

That’s not all. As we get closer to a project’s completion and opening for service, the number of walk-downs goes way up to ensure that everything has been built according to plan in order to ensure that projects can be opened for service to the public. Here are some answers to the two biggest questions about walk-downs:

why so many people?

Each team member on a walk-down has a specific job. And depending on the purpose of the walk-down, a variety of people with different expertise may participate.

To review an area before a major work operation, for example, the walk-down team may include a vivaNext Project Engineer, who would ensure that the work plan is accurate to engineering drawings; and the Community Liaison, who communicates the impacts to businesses, residents and other stakeholders.

It may also include an Engineer from York Region’s Transportation Services, who inspects the roadway elements – such as street lighting, sidewalks, boulevards, traffic signals, pavement markings, and signs – and ensures compliance with lane closure permits;

Safety Managers ensure that the work plan is safe. And Supervisors from the Constructor and sub-contractor companies take everyone through the work plan and operation.

In some cases, municipal and regional staff will join us on inspections– for example, with water main connections, vivastation construction, paving, and red asphalt in the rapidways; and for works near Highway 400, provincial Ministry staff may join the walk-down.

what are they looking for during a walk-down?

Participants are looking at a variety of factors based on their role within the project team, and depending on the particular purpose of the walk-down.

Some participants are specifically looking for possible errors in construction – in new pavement, installed signs, storm sewers, and other quality concerns to be addressed.

All items are documented and while some items may need to be fixed immediately, others will be addressed during the contractor’s warranty period. Other participants look for how the operation will unfold and the impact to the community, such as accessibility for pedestrians. Follow-up walk-downs are then scheduled to review progress on documented items.

Each participant on a walk-down plays an important role in order to deliver high-quality rapidway projects throughout York Region.   

STAYING INFORMED

Make sure to connect with us on social media to receive regular construction updates and stay in touch! The best way to stay informed about our construction projects is to sign-up for email notifications at vivanext.com/subscribe, and to follow us on our social media platforms.

Categories
Construction Crosswalks Intersections Safety Traffic signals Uncategorized

heading back to school next week? >> take the steps to stay safe

For students heading back to school next week, it’s an exciting time. We’d like to remind you to make sure you always cross at a designated crosswalk.

check out our latest video with these safety messages

cross at the designated crosswalk

It can be tempting to cross between blocks, but it’s simply too dangerous. Drivers are not anticipating pedestrians crossing in the middle of the road and with lane closures in construction zones, it means extra caution is necessary.

be aware and alert

Students, always take the extra bit of time to go to the nearest crosswalk, put away distractions like earbuds and phones – and be aware of your surroundings, especially when walking near construction areas. Follow sidewalk detours and safely get on your way.

drivers, slow down

For drivers, during the back-to-school rush, it’s very important to be aware of the increased volume of pedestrians out and about.

safety is a shared responsibility

Because construction can change as work progresses, it’s important for everyone – pedestrians, cyclists and drivers – to pay attention to posted signs in and around construction zones. Watch for signs and traffic barrels that indicate lane shifts and closures, as well as relocated sidewalks and bus stops. Remember, safety is a shared responsibility!

 

For information about ongoing vivaNext projects, be sure to subscribe to email updates, and follow us on Twitter. You can also follow us on Instagram, YouTube and Facebook. Questions or comments? Comment below or email us at contactus@vivanext.com.

Categories
Construction Rapidways Safety Signs and barrels Traffic signals Uncategorized Video

the value of patience – and safety

We know construction can be messy and disruptive at times, and we thank you for your patience and understanding as we work hard to transform the corridor to a complete street with wide pedestrian-friendly sidewalks, shade-giving trees, bike lanes and rapid transit.

check out our latest video with its brief but important safety messages

Because safety during rapidway construction is crucial, everyone must do their part. The important messages are: always cross at the designated crosswalk, pay attention to posted signs in and around construction zones, and obey the posted speed limit.

the reasons for bus rapid transit

Once construction of the rapidway is complete and the vivastations are open for service, Viva commute times will improve. Not only that, Viva buses can take advantage of priority traffic signals to help them stay on schedule.

Bus rapid transit also provides a viable option to get around as the population increases over the decades to come. It’s all part of a rapid transit network that connects the Region’s urban centres.

Your patience is appreciated!

For information about ongoing vivaNext projects, be sure to subscribe to email updates, and follow us on Twitter. Questions or comments? Comment below or email us at contactus@vivanext.com.

Categories
Construction Rapidways Safety Signs and barrels Traffic signals Uncategorized

school’s out for the summer

Blogpost by: Katherine Yasinska

With the rising temperatures, it’s clear that summer is here! Summer brings barbecues, beach days and trips to the zoo. And now that school is over for the summer, kids and their families will be spending more time outside and on our roads.  It also means that the construction of our rapidways – on Highway 7 West in Woodbridge, Bathurst & Centre in Thornhill, and on Yonge Street in Richmond Hill and Newmarket – is in full swing.

Summer is our favourite season, not only because of the beautiful weather, but also because it means our vision of efficient and reliable transportation is becoming closer to completion every day.

safety in construction areas is key

Children of all ages are trading in their backpacks and pencils for bikes and basketballs. With school over for the summer, kids and their families will be spending more time outside and on our roads. That’s why we’d like to remind motorists to drive carefully and exercise caution in order to keep kids safe and sound!  In construction areas, safety should be even more top of mind – for everyone.

have fun and keep safe this summer

It’s inevitable that drivers can get distracted from time-to-time. The warmer weather and busy summer schedules may create even more distractions, which is why it’s so important to remember to be alert and cautious.

safety is a shared responsibility

When you’re driving through a construction zone or driving through a neighborhood filled with kids playing outside, it’s important to give your undivided attention to the road, pay attention to construction signage, and be alert for pedestrians, construction workers, and cyclists.

Summer brings many fun activities, but it also requires more attention to help everyone enjoy their summer. Remember, safety is a shared responsibility.

 

For information about ongoing vivaNext projects, be sure to subscribe to email updates, and follow us on Twitter. Questions or comments? Comment below or email us at contactus@vivanext.com.

Categories
Construction Intersections Rapidways Traffic signals Uncategorized

a new phase of rapidway construction means intersections are changing

As rapidway construction on Highway 7 West and Bathurst & Centre progresses, dedicated bus lanes and vivastations are being built in the centre lanes.

This means the way that signalized intersections work is changing – especially if you’re a pedestrian, or a driver turning left or wanting to make a U-turn.

Here’s what to watch for:

Dedicated lefts and U-turns now happen at intersections

Signalized intersections will now have a dedicated left-turn traffic signal. This means that drivers can make left turns or U-turns only when the left-turn signal is illuminated. The protected movement through the intersection makes it safe and efficient to get where you’re going quickly.

To reach driveways mid-block

To get to driveways located mid-block on the other side of the road, drivers will no longer be able to turn left between intersections; instead drivers should make a U-turn at the next signalized intersection.

Making a left at an intersection is safer than cutting across multiple lanes of traffic, and ensures that drivers trying to turn left get their turn, and don’t have to rush through a yellow.

Changes for pedestrians

The new intersections will be wider with more lanes and new traffic signals. At intersections that will have vivastations, pedestrians may cross the road in two stages if unable to get to the other side during the first signal. To assist with two-stage crossing, there will be a pedestrian waiting area in the middle of the crosswalk where pedestrians can stop, push the “walk” button, and wait for the next walk signal to safely cross the second half of the street.

Check out the video, “Rapidway intersections: safe journeys” for safe navigation of the new intersections for pedestrians, cyclists, driver and transit riders.

 

For information about ongoing vivaNext projects, be sure to subscribe to email updates, and follow us on Twitter. Questions or comments? Comment below or email us at contactus@vivanext.com.

Categories
Commissioning Construction Facilities and terminals General Rapidways Stations Technical Traffic signals

proof of performance

The days are counting down and the excitement is growing. The launch of our extraordinary new vivastation at Vaughan Metropolitan Centre, along with the ground-breaking TTC Line 1 subway extension and our rapidway, is only four days away. Now we have one last crucial task to complete before our gorgeous new station joins the transit mega-hub at the VMC: we need to carry out commissioning.

testing, one, two, three

Commissioning of the new bus rapid transit station is similar to the process we do for all our new stations, rapidways and facilities. Very simply, it means confirming everything we installed, from the heaters and automatic doors in the passenger enclosures, to the cameras, speakers and variable message signs [VMS] on the platforms, works the way it’s supposed to.

Before their work is done, our builders have to test every single device and piece of equipment to demonstrate they met all their obligations. The station has complex equipment for fares and security, and all the general building components like lights, plumbing, and electrical connections. Systems connect to the central York Region control room, enabling them to see the platforms, hear the speakers, run messages on the VMS and communicate through emergency call buttons. During commissioning, every light switch, outlet and connection is tested. Our builder also works with the new station owners, YRT/Viva, to help them assume operation.

smart systems

The new station is part of a highly sophisticated system which includes the broader rapidway network and its whole range of intelligent transportation system [ITS] features. ITS is really the reason Viva is able to operate as a rapid transit service, keeping our system running on time with supervision from YRT/Viva’s central control room.

trial run

A critical part of commissioning is testing the newly finished components in the new VMC station and the surrounding rapidway, to make sure they’re all connected properly to the control room and the rest of the system. Testing for full integration requires that we run buses through the new rapidway for a day. During that process, we’ll make sure that all the traffic-related components are communicating properly to the buses and to the general system, and ensure the traffic signal timing is set for optimal travel times.

This station has one more layer of complexity beyond the other stations we’ve built, because of its connections to the TTC. We need to check every interface with the TTC system, which includes electrical connections running between our station and their panels below.

Commissioning is the final step, and you can see why it’s so important to do it carefully and methodically. Because of that complexity, some work will continue on the station in 2018. But once it’s finished, get ready to celebrate and enjoy faster transit with us!

Categories
Construction Rapidways Safety Traffic signals

changing lights

Most people look at traffic signals every day, but don’t notice how they’re configured, or why they’re installed the way they are. Traffic signals change quite a bit with our construction projects, and not just from green to yellow to red.

Once a project is underway, each intersection in the construction area receives a new, temporary traffic signal pole on each corner, set farther back from the road. Then temporary traffic signals are strung on wires across the intersection from these temporary poles.

Once the temporary poles are in place, the old poles and signals are removed, including any poles in the centre median in each direction.

Having the temporary poles farther back from the road allows access for relocating utilities and widening the road. As lanes are shifted and the road is widened, the temporary signals are adjusted along the wires to ensure they’re in the correct place for traffic and pedestrians.

Later in the project, new poles are installed in their final location, and permanent traffic signals are added, along with a dedicated left/U-turn signal.

Each time the traffic signals are changed, paid-duty police officers are on hand at each intersection for a few hours to ensure traffic flows safely through the intersection. If you’re on Yonge Street in Newmarket or Bathurst and Centre Streets in Vaughan, you’ve seen this firsthand recently.

For a peek at the final outcome, check out the sections of rapidway on Highway 7 East in Markham and Davis Drive in Newmarket.

Despite the cold weather, the vivaNext team continues to work out on the corridors and behind the scenes – making progress as seamlessly as possible.