Categories
Construction Live-work-play Rapidways

vivaNext – more to come

When it comes to the future of transit in York Region, you don’t have to look far. The first rapidway along Highway 7 east corridor is now up and running smoothly. With it came wide pedestrian-friendly boulevards, lined with trees and other greenery. The transformation taking place along the Viva routes will change how pedestrians, cyclists and motorists not only view the area in general, but get from A to B more easily, more safely and more efficiently.  Check out this 3600 virtual tour for a peak.

This is just the beginning of many miles of rapidway that are under construction or coming soon.  Here is an update of what’s happening.

Construction on Highway 7 East continues and crews are working hard from Highway 404 to Warden Avenue to widen the road, build pedestrian boulevards, plant trees and shrubs as well as installing utilities. This next segment of rapidway is expected to be completed in 2014.

Moving along Highway 7 west to Vaughan, you will see the vivaNext rapidway construction starting to take shape between Edgeley Boulevard and Bowes Road.  Over the last few months, crews have been working to remove signs, test soil and begin utility relocation to prepare for heavier construction.  Throughout the fall and winter, hydro, gas and telecommunications installations and relocations will continue in Vaughan.

Preliminary construction activity will also continue in other parts of Vaughan as vivaNext rapidway construction continues along Highway 7 West.   The Vaughan Metropolitan Centre [VMC] station will be completed in time with the Toronto-York Spadina Subway Extension [TYSSE].  Vaughan’s VMC station will be the northernmost subway station, connecting to Viva and a variety of other transit services, for a convenient and seamless experience.

In Newmarket, as you drive or walk along Davis Drive, you’ll see that construction is in full swing and the transformation is starting to take shape. The relocation and replacement of underground infrastructure in some segments on the south side of Davis Drive is complete. In those sections, road widening and preliminary paving has started preparing the roadway for future rapidways.

Also in Newmarket, crews are working to re-locate the Historic Union Hotel and its adjoining building to their final foundations this fall. Extensive culvert work at eastern and western creek is underway.  Work continues on the north side of the Keith Bridge.  Once completed all this work will help make your travel along Davis Drive smoother and more efficient, especially if you are on transit!

Over the next few years, future rapidways will be added to the Viva routes to better service customers and make travel times shorter by up to 25%.  We know construction is messy, but the end results are marvelous!

Categories
Rapidways Stations

making our stations accessible

Making public infrastructure, such as transit services, accessible is a priority, and the new vivaNext BRT design more than complies with all the requirements.   Formally, accessibility requirements are legally concerned with people with disabilities, but that’s actually only one component of how we’ve made the stations accessible.

The vivaNext commitment is to ensure everyone feels equally welcome on the station platforms and is able to board the viva vehicles, whether they have mobility or other physical limitations, or are pushing a baby stroller, or for any other reasons they might feel uncomfortable accessing transit service.

In addition to meeting the accessibility requirements set out in Provincial and local regulatory frameworks, we’ve gone to great lengths to design the platforms so all users have a comfortable and pleasant customer experience, and obtained advice and input from the CNIB and York Region’s Accessibility Committee during the design process.

Here’s what we’ve built into the new stations to ensure all users feel safe and comfortable.

  • The ramps to the platform have a shallow incline and handrails on either side, and there are no changes of grade or tripping hazards anywhere on the platform.   For people with impaired vision, the platform edge is clearly indicated through the use of domed tactile tiles in a contrasting colour.  At the primary bus stop location there are directional tiles which provide directional grooves going toward the bus, which will be helpful for people using canes for guidance.
  • People using wheelchairs will have no difficulties getting in and out of the heated enclosures, which provide wheelchair-turning radius inside, and have doors at either end to simplify access.  And the enclosures will have barrier free doors which have been designed to meet the highest accessibility standards including their button placement and operations such as door opening speed and how the door responds if it contacts an object.
  • We’ve included benches inside the enclosure and outside, complete with grab bars for people who appreciate a little help getting up and down.  And for anyone who dreads the chilly experience of sitting on a metal bench in a Canadian winter, we’ve planned for that too – the benches are constructed from durable Brazilian Ipe wood which will make sitting a little warmer in the cold weather.
  • The electronic ITS elements are designed to ensure using the equipment is equally successful for all our customers.   Our fare equipment is designed to be functional for people at wheelchair height or with other physical limitations, with angled screens, clear, bright graphics and large push-buttons.  The VMS will provide clearly visible information on buses, routes and the time.  We extensively researched and analyzed our PA system to make sure it’s clearly audible, and provides full coverage along the platform and in the enclosures. The notice holders for system updates are posted at the right height so they’re easily read whether you’re walking or in a wheelchair.  And we’ve installed large map cases at each platform, illuminated to make it easy for everyone to navigate their route.

Overall, our objective has been to provide a comfortable, safe and welcoming experience for all our transit riders with no barriers or restrictions.

Categories
Rapidways Stations

take a tour of the new rapidways on highway 7

Rapidways are now open on Highway 7 and they’re beautiful, they’re functional, and they’re going to make a huge contribution to the transformation of our communities.  Anyone travelling along Highway 7 in Richmond Hill or Markham has seen them from the outside, but here’s a peek of what they’re like on the inside.

The first thing you’ll notice as you cross to a station is how big and airy the canopy is at 28m (92’) long and 5m (16’) high.  The curved glass above the platform also provides both weather protection and a sense of space at the same time and satisfies long-term needs as platforms accommodate two viva vehicles at once and LRT (Light Rail Transit) in the future.  The platform is approached by a gently sloped ramp with handrails on both sides, making it fully accessible to all, whether they’re walking, pushing a stroller, or in a wheelchair or scooter.  Passing by the familiar viva fin and planted planter boxes, you’ll next come to an illuminated wall map of the YRT\Viva system.

Next on the tour is a bank of fare equipment, including a Ticket Vending Machine (TVM), a Ticket Validator (TV), and two Presto machines. Once you’ve paid your fare, you’ll move to the Fare Paid Zone (FPZ), which is clearly shown by being paved with a different coloured tile on the ground, as well as by a curved sign above.  We need to show this area as distinct, as YRT fare rules require passengers to have paid their fare before moving into the FPZ.

Once you’ve paid your fare, you’re free to make yourself comfortable on the platform until the next bus arrives.  We’re making it easy for you to know how long you’ve got to wait, with a large VMS (Variable Message Sign) projected from the canopy.  The VMS scrolls through all the upcoming arrivals, telling you exactly when the next bus will arrive.  Because the VMS system is connected to the GPS in our actual vehicles as well as the central transit scheduling software, it can be constantly updated to provide accurate and real-time information.

But if you decide you want to sit down on a bench, or get comfy out of the elements, we’ve made that easy too.  The fully heated glass enclosure is well lit, and accessed by two push-button automatic doors.  The heaters – which won’t be needed anytime soon, but you’ll like them come later this year, they’re like the infrared heaters in a hockey arena – will automatically turn on if someone enters the enclosure, and if the temperature in the enclosure feels lower than 10 degrees Celsius.  Multiple benches and garbage disposal units will add to your comfort.

The entire platform will be well lit, with lighting inside the canopy as well as on the platform.  And to enhance your feelings of comfort and security, the back of the platform is protected from the Highway 7 traffic by a barrier wall topped with a guardrail, and there are multiple security features including cameras and an emergency call button.

Last but not least, to help you stay oriented, wayfinding signage will show you where the buses will stop, and other features including the way to the crosswalk.

It’s hard to do the stations justice by written descriptions, so we have created a virtual tour to entice you to come out and try viva.

Categories
Construction Rapidways

colour coding the rapidway

As I’ve posted previously, Bus Rapid Transit is an increasingly popular rapid transit technology around the world [Bus Rapid Transit: growing around the world, Bus Rapid Transit: South America leads the way].   One of the ways to make BRT truly rapid, as we’re doing here in York Region, is to provide vehicles with separate lanes so they can move easily through congested areas.  And one way to make those lanes distinct without having an actual grade separation (which would require extra room as well as be much more costly) is to make them a different colour.  This is why the vivaNext rapidways are bright red, as you’ll have seen if you’ve driven along Highway 7 East recently.  These red lanes are for viva transit vehicles only and cars need to be careful not to drive into them for everyone’s safety.

But colouring asphalt anything other than basic black isn’t as easy as you might think.  Here’s what we’ve done to get our rapidways red.

Painting asphalt isn’t an option. Although it’s something we all take for granted, creating a long-lasting, durable asphalt mix for the conditions along a busy roadway like Highway 7 is actually a highly specialized science.  The surface on roadways that carry a lot of heavy traffic, especially traffic that is constantly turning and braking or accelerating at intersections, needs to be exceptionally strong to prevent cracking, rutting and shifting.  Canadian climate conditions including extreme temperature changes, hot sun, frost, and salting over the winter, all impose significant challenges.  Creating an asphalt mix to take these conditions without requiring frequent maintenance is something that specialized pavement designers work long and hard to achieve, with the technology constantly evolving.

So adding in the requirement to make it a distinct colour definitely adds to the complexity.

Using red pavers or bricks would not provide a sufficiently durable driving surface long term, and would be extremely costly to install and maintain.  One approach that is used when the colour is needed in very limited areas, such as crosswalks or bike lanes, is a material called “street print”.  But this material, which is actually a special top layer that’s heated right into the asphalt once it has been imprinted with a brick or paver pattern, would be too complicated to use along the full length of the rapidways (although we are using it for our crosswalks), and again would not be durable enough.

So the best approach is to tint the black asphalt, which we’re accomplishing in a couple of ways.   Asphalt is composed of a mixture of sand, stones and asphalt cement binding it together.  By adding reddish stones rather than grey ones, we can give an underlying red tint to the asphalt, especially as it wears.

The more complex adjustment is to add a special red pigment.  The challenge with the pigment is to be careful in how much we add:  too little and the colour doesn’t come through, but too much and the overall durability of the asphalt might be compromised.  The pavement design team has worked long and hard through a highly technical process to get the balance just right.

We’re delighted with their final results, which will give us what we need: a clearly defined rapidway that stands out from the regular traffic lanes, with a long-lasting and durable surface, at an affordable price.  Drivers need to remember as they make turns from side streets along Highway 7 to follow the white skip lines and not turn onto those red rapidways!  Although beautiful, they are red for safety too!

 

Categories
General Rapidways Stations

we can hear you, loud and clear

As I wrote earlier this summer, our engineers have worked hard to design the optimal public address system for your new vivastations.  Here’s what the system will include, and how good it’s going to sound.

Most PA systems are pretty frustrating in the garbled sound quality they provide.  We knew we wanted to do much better.  There’s nothing worse than knowing something important is being said, but not being able to understand it.

To make sure the new PA system is always audible, we started with an acoustic analysis study using special “Enhanced Acoustic Simulator for Engineers” (EASE) software. This study analyzed the two elements most critical to sound: Sound Pressure Level (SPL) and Speech Transmission Index (STI). The SPL, measured in decibels (dB), is concerned with sound magnitude and takes into account ambient noise levels – it is the relative “loudness” of a sound.  STI predicts how the equipment being used and the surrounding environment will affect the quality of the sound, and therefore how intelligible it is for you as you hear it.

First, the acoustic engineers needed to determine what effects our curved canopies and the beams and angles inside the station would have on the way sound is going to move around.  Secondly, the reflection of sound by the concrete wall, floor and glass was modeled. This analysis helped predict how clear the final sound will be on the platform and in the enclosure, and also helped determine the number and placement of speakers that will be most effective in achieving clear sounds.

Following this sophisticated modeling the engineers determined that the optimal number of speakers to achieve our goals would be 12 speakers located outside of the passenger enclosure, and another 3 speakers inside.

The next challenge was to work on the volume to be used by the speakers.  The problem with PA systems in noisy places is that the ambient noise can overwhelm the volume of the PA system, making it impossible to hear what’s being said.  Our solution is to use a speaker volume system that automatically adjusts when its sensors detect that the ambient noise has increased or decreased.

There are two sensors on each viva platform to measure noise level. This way, announcements should be audible whether there’s a bus idling in the station and trucks are moving past, or it’s nighttime and quiet.

The PA system will be used for recorded and live announcements from transit operations, such as emergency information or service changes, but will not announce bus arrivals although it does have that capability.

Although we’ve tested the system many times, we continue to monitor the sound levels now that operations have started.  We hope you have been out to test drive the first section of rapidways now open on Highway 7 and let us know if you can truly hear us, loud and clear.

 

Categories
General Rapidways Stations

introducing our new and improved fare equipment rolling out along Highway 7

When viva launched its Quickstart service in 2005, our new automated fare equipment used the latest technology. Customers loved the convenience of being able to purchase fares curbside, and drivers loved the way off-board ticket purchases speeded up service.  Well we all know how technology is constantly being improved, and transit fare equipment is no exception.  So as we designed the new rapidway stations, we worked with York Region and YRT to find ways to make our fare equipment even more efficient and user-friendly.

The first seven [7] new rapidway stations are now open on Highway 7 and here’s a virtual tour of the new and improved equipment that you’ll see and how it’s been updated.

The biggest changes are to the completely redesigned Ticket Vending Machine [TVM for short].

The existing equipment uses a touchscreen that works well but can be a bit hard to see when the sunlight is very bright, especially for people with impaired vision.  The new TVM is more like a bank machine, with push buttons rather than a touch screen.

The new machines use a state-of-the-art operating system that makes them faster, with a better printer, and a chip reader to process credit cards and debit cards.  Because our entire system is now connected to the internet through a new fibre optics communications network, credit card and bank transactions will be in real time for improved security. The new TVMs will also take coins for users who prefer to use cash (no change is provided though, so correct change is best).  We’ve also improved the Ticket Validator (TV) for customers who use YRT tickets and passes.

And each station will have two Presto machines to help things move faster.  Just tap and go.

We’re excited about these improvements to the fare equipment, which is all located together at the top of the ramp on the new platforms you can find on Highway 7.  Remember to make sure you have a valid fare before you enter the Fare Paid Zone – and visit YRT\viva and presto for more information.

 

Categories
Rapidways Stations

this is just the beginning

Over the next three years, the vivaNext system is really going to be taking shape, with rapidways on Highway 7 and Davis Drive opening for service, and the Toronto York Spadina Subway Extension [TYSSE] welcoming its first passengers.  But these new transit options are only the beginning of expanding vivaNext network that’s being built for York Region commuters over the next few years.

Funding for the next priority series of rapidways is already lined up, and we hope to be confirming funding soon for a number of other high priority projects.  Here’s the rundown on what’s planned, and how your transit choices are going to be widened over the next few years as vivaNext continues to expand.

Rapidway projects are being built in the order that will create the most connectivity for the greatest number of people and get you past the worst traffic congestion.  Check out the map to see how the phases are rolling out.

The segments that are coloured pink on the map are what we’re currently building and include the rapidway on the East part of Highway 7, from Yonge Street to Warden Avenue, and the rapidway in Newmarket along Davis Drive from Yonge Street to Highway 404.

In the pink project bundle, we’re in the preliminary construction stages for a 36 km stretch of rapidway on Highway 7 West including a station at the Vaughan Metropolitan Centre [VMC].  This station and rapidway will be opening in time to connect viva passengers to the Spadina Subway Extension when it opens for service in 2016.

The blue projects run north on Yonge Street. We’re currently in the procurement phase for the first stage of two rapidway segments between Richmond Hill and Newmarket.  One stretch will whisk passengers north from the Richmond Hill Centre up to 19th Ave / Gamble.  The other stretch starts at Mulock Drive in Newmarket, and will connect to the new rapidway along Davis Drive.  Construction of these rapidways is expected to be completed in 2017.

But that’s not all – look at the orange segments on the map.  These segments are also all designed and funding is committed, with planning well underway for construction to start in 2015.  Orange projects include two rapidway segments on Highway 7 West, which will extend on either side of the VMC rapidway. When it’s complete in 2018 this whole section will run over 15 km from Helen to Yonge Street. Another orange project will extend the Highway 7 East rapidway from the existing Warden Station on Enterprise Boulevard, to Unionville GO Station.

Other projects that will eventually create a full network across the Region and connecting to other transit systems are grey on the map. Since we don’t have funding secured for all of them yet we can’t confirm the actual timing.

Of these unfunded segments, two are the top priority.  The first priority is the Yonge North Subway Extension, which will provide a critical link for passengers transferring between the vivaNext system and the TTC.  Without this connection, vivaNext is missing a critical link that will really make our system a key part of the larger Greater Toronto transit network.

Another key priority is a rapidway along Major Mackenzie Drive, which would provide a major transit artery for all the growth taking place in that area.  The Major Mackenzie rapidway would provide passengers with connections to the TYSSE, GO lines in both the east and west, and the viva Highway 7 rapidway in both the east and west.

Imagine how this wonderful rapid transit network would make your life easier?  We are working hard to bring it to life, so that everyone in York Region will have the choice to leave their car at home and hop on board viva for a fast, reliable and comfortable ride, no matter where they want to go.

 

Categories
General Rapidways Urban Planning

welcoming all cyclists

We’ve been focusing recently on all the features of the new rapidways, which together are going to make transit truly rapid along Highway 7.   But it’s important to remember that many of the design features were developed to ensure that all users of the Highway 7 corridor feel welcome and secure.  This includes transit users, pedestrians, cyclists and drivers – the “complete street” design concept which you can read more about here.  One of the features that have been installed on the rapidways are new dedicated bike lanes and bike boxes, which are painted green.

To provide safety and convenience the new bike lanes will extend 5 kilometres, from Chalmers to South Town Centre Boulevard with lanes on both the north and south sides of Highway 7.  Unlike in many urban settings, York Region cyclists will have these lanes to themselves –our new bike lanes are dedicated, meaning they’re not shared at any point with vehicles.

We’re following the established safety standards, making the lanes 1.4 metres wide, with an additional half metre for a buffer zone between the bike and traffic lanes. Also to give maximum visibility for the bike lanes, they’ll be painted a high-contrast green in the areas around intersections, with special bike-lane markings to clearly identify them in the mid-block.

With the high volume of traffic, the bike lanes will provide a much more comfortable and secure environment for cyclists riding along Highway 7.  But eventually most cyclists will want to turn off of Highway 7, with some needing to make left turns.  Waiting in the left turn lane with vehicles to cross multiple lanes of traffic and the rapidways wouldn’t be safe on a bike, so we’re adding another feature to make the experience better for cyclists.  They’re called bike boxes, and they will make the corridor more welcoming to cyclists.

Here’s how they work.  Cyclists wanting to turn left off Highway 7 will proceed through the signalized east/west intersection in the bike lane into the far side  then stop in a protected area, reserved for cyclists, tucked into the boulevard on the far side of the intersection.  This area, known as a bike box, will offer cyclists a waiting zone while they wait for the light to change.  Once the light changes, they will then cross Highway 7 along with other north/south traffic.

The bike boxes will be clearly marked with green paint like the bike lanes and other markings, so drivers and pedestrians will know they are for cyclists only.  Permanent bike boxes will be put in place this fall and replace the painted ones on the street, so by next spring cyclist will have a great new pathway to follow, with the latest of features.

We’re excited to be providing these new features for York Region cyclists, and know that they’re going to help make this corridor much more welcoming to all travellers, no matter how they choose to get around.

 

Categories
Live-work-play Rapidways Urban Planning

using colour and shape to create welcoming pedestrian spaces

If you’ve walked along the new rapidway on Highway 7, you’ll have seen the vivaNext pavers we’ve installed on the boulevards.  We know from the feedback we’ve gotten that people love the new look.

Most sidewalks in York Region, like pretty much everywhere else, are made of concrete, and the most important consideration is functionality: they need to be safe, accessible, durable and easy to maintain.  But beyond those goals, we also want our new boulevards – which are wider than the Region’s regular sidewalks – to reinforce the complete street concept, the guiding philosophy for our vivaNext streetscape design.  With all the development coming to the Region’s centres and corridors, in the future there will be more pedestrians, whether they live, work, or commute along our rapidway routes.  So we’ve made sure that our boulevard design is going to be visually appealing as well as functional.

The boulevard is made up of the pedestrian zone and the furnishing zone. The pedestrian zone is typically a 2.0m wide sidewalk which is fully paved with light-toned coloured pavers near intersections, and paved with concrete in the mid-block areas. The sidewalk is a continuous system even across driveways to alert motorists that pedestrians have priority.

The furnishing zone is located next to the pedestrian zone. The furnishing zone is an area where pedestrian amenities, furniture and planters are located. It is paved in light coloured unit pavers which reinforce the identity of the vivaNext system.

We’re using a combination of coloured pavers which not only look great but also add to wayfinding for pedestrians.  The main field pavers are light-coloured cool gray with contrasting coloured accent bands which will increase in frequency as pedestrians approach the main intersections. The east-west accent bands are a red; the north-south accent bands are a dark charcoal gray.

Immediately adjacent to the roadway and running along beside the pedestrian zone is a 610mm wide “transition zone”, which will provide an important comfort buffer against bicycle and vehicular traffic. In the winter months, it also provides an area for snow storage and protects the adjacent plantings from salt spray. This zone will be paved in special “eco-pavers”, which allow water to seep through to the storm sewer system.

A charcoal gray coloured textured warning strip will alert visually impaired pedestrians that they are approaching an intersection or driveway. At midblock where the pedestrian zone in paved in concrete, the warning strip will be grooved concrete. Both approaches will provide a tactile clue for visually impaired pedestrians of potential conflicts.

We’ve given special attention to the boulevards near intersections to ensure they reinforce pedestrian priority and add to placemaking. These areas have been designed to function as urban plazas with unit paving and accent pavers. Soft landscaping will define the corners of the intersections and function as gateways to the adjacent areas.

By making the boulevards along the rapidways welcoming and attractive, we’re contributing to the development of York Region’s new urban centres, and adding more walkable places for us all to use.

 

Categories
General Rapidways

enhancing your security and safety

Taking steps to ensure our passengers feel secure and safe using our stations is a top priority for YRT\Viva.  So every detail of our new passenger stations on the Highway 7 rapidway has been designed with a view to make our riders feel comfortable, well protected from the elements and adjacent traffic, and able to access help in an emergency.

Here’s a rundown of the new features we’ve designed into all our stations, so all users can enjoy a personal sense of safety.

With our median platforms located in the middle of a busy roadway, one of our top priorities has been to make the stations feel like a safe haven.  Stations will provide a secure waiting place for passengers with a concrete barrier wall running all along the traffic side, and a glass guardrail beyond the canopy.

To access the new stations in the median, pedestrians must use the crosswalks and cross with the signal.  When crossing the road to or from the new station, you must remember to push your pedestrian button to get the signal to cross safely.  Also, because this is new for everyone, it is important that pedestrians watch for traffic before stepping out to cross the road.  Whenever there are changes, it is important to be aware of all the users to the roadway to ensure your safety at all times.

Our stations reflect the CPTED (Crime Prevention Through Environmental Design) principles of transparency and good lighting, enabling people to see and be seen. We’ve paid careful attention to lighting levels, including along the platform and in the glass enclosure, which is fully visible to the platform and has doors at either end.

Each platform is well equipped with electronic security devices, overseen 24/7 by YRT\Viva staff at transit headquarters.  Stations are monitored constantly by three CCTV (Closed Circuit Television) cameras.  In addition to providing good coverage of the platform at all times, transit staff can maneuver the cameras manually as needed.

To add to passenger’s sense of security, a clearly marked Emergency Call Button is located inside the glass enclosure, and its speaker provides immediate two-way contact between the caller and YRT operators.  The audio of the call is recorded and time-stamped, as is the video that is automatically captured by the closest camera when the button is pushed. When the ECB is pushed, blue strobe lights on the VMS and on the ECB will be triggered to indicate to passing emergency services that assistance is needed, and transit staff will dispatch emergency services if required.

Also adding to these new features is the PA system that will be used to provide live and recorded public announcements from transit operations.

These new features are probably things that most people will never need to know about.  All the same, knowing that we’ve gone to great lengths to maximize our passengers’ sense of safety, and that our transit staff are on duty 24/7 behind the cameras, should give all our riders total peace of mind.  Be safe!