countdown to handover

countdown to handover

Taking advantage of every sunny day to advance the work on the Highway 7 rapidway in Markham, our teams are working hard to finish all sorts of little details. With much of the construction complete, we’re now focused on the final stages of construction and testing, and then getting ready for handover, when the system is officially turned over to York Region and YRT, the system owners and operators.

Handover means just what it says – it’s the moment in time when the transit system is handed over to the owner for care and custody. From that time forward, the system – which until then has been the responsibility of the Contractor/Design Builder – becomes the private property of the owner.

Because the formal handover is such a significant development, especially on a major infrastructure project like the vivaNext rapidway, it’s important to ensure everything is in perfect working order. The various steps involved in commissioning, which is the testing period that takes place before handover, vary depending on what is being handed over. For example, with the fare equipment, we make sure the ticket vending machine [TVM] prints properly. With the traffic signals, once they’re programmed the permanent signals are turned on and each phase is tested individually, and all the push buttons are tested to make sure they work.

Streetlights are inspected to ensure all the wiring is according to the drawings; that the bases are level, and the power connections are all correct. The teams go out at night to actually turn on the lights, to ensure all the lamps come on and nothing is flickering. Lighting is an important safety feature for both pedestrians and vehicles.

Every single detail is inspected through a visual walk-down. Then a list of the things that still need to be finished or perfected is created with items graded from most serious to least serious. These items will be fixed either prior to the system opening or post opening under the warranty.

Once handover takes place, legal ownership and responsibility is transferred to the owner, and the Contractor/Design Builder’s warranty period begins, just the way it happens when a homebuyer takes possession of a new house.

Handover in this case means some elements of the rapidway, like the rapidway, stations, boulevards and planters, are transferred to the Region. Others, like the sidewalks and streetlights are transferred to the local municipality to maintain.

Ultimately, vivaNext wants to provide a reliable, efficient rapid transit system and beautiful streetscape. Because, at the end of the day, the ultimate owners are the public of York Region and with every new piece of rapidway delivered, it makes it a better system that we all can be proud of.

Categories
Construction Rapidways

testing, testing, testing

testing, testing, testing

As you will know from driving along Highway 7 East from Highway 404 to Warden, our rapidway construction is really coming along, and this summer another segment will be going into operation. We still have a bit more work ahead of us before service operation can begin, including some work which will be obvious, such as final paving, striping and landscaping. But in addition to that, we’re just getting underway on a less-obvious but highly important part of the job, which is testing – to ensure that all parts of the rapidway project are ready for active service.

This stage – known in the construction world as commissioning – is critically important and planning for commissioning the new section of Highway 7 East rapidway has already been in progress.

So what does commissioning involve, and how do we do it?

First of all, the technical definition of commissioning is: the process of assuring that all systems and components of a system are designed, installed and tested according to the operational requirements that have been established.

In the case of vivaNext, the most visible components of the project include the new roadways, passenger stations and amenities, and streetscape elements such as lighting, sidewalks and landscaping. Ongoing inspections are being done as construction progresses to ensure that these are being built to certain specifications, before they are handed over for use by Viva. Commissioning is a detailed focus on the key systems and components that together make up the overall network.

These components include the fare collection equipment; the station information systems such as the variable message signs, clocks and Public Address systems; passenger security elements such as closed circuit TV systems and emergency call buttons; and the traffic signals at intersections. It also includes the sophisticated Transit Vehicle Detection system, which will provide information to the traffic signals when rapid transit vehicles are approaching intersections, as well as the overall communications system and fibre optic network that links all of these components.

Testing starts at the factory, where the fabricator verifies that the equipment works as it was intended to, and then each component is tested again once it’s installed. Once all the components are installed and each one is confirmed to be working as designed, a series of additional tests are carried out to confirm that the entire system is integrated properly and working together. Don’t forget we have to connect up to the section already open and make sure everything continues to run smoothly.

The final step involves testing the reliability and function of the extended system, including simulating actual operation using buses and staff acting as passengers. This gives the people who will be involved in the future operation, maintenance and service of the rapidway an opportunity to become familiar with the new section.

So you can see that there’s still a lot of work behind the scenes to get to the day we’re all looking forward to – when the Viva bus extends its journey the length of the new rapidway from Bayview Avenue to South Town Centre Boulevard in late August.

Categories
Construction Rapidways

turning on the lights

turning on the lights

Street lights are one of those infrastructure elements that the public may not give a lot of thought to, but in truth their design contributes significantly to the overall streetscape. And because the vivaNext project is being used to transform Highway 7 East from a highway to an urban corridor, all the design components, including the street lights, have been given a lot of thought. But before design considerations can be focused on, safety is the first priority to be achieved with street lighting. VivaNext works with York Region, the local Municipality and the utility companies to develop lighting designs, coordinate and install the lights. Here’s an overview of the role lighting plays in the vivaNext vision, and the street lighting elements you will see installed on all the rapidway corridors.

Designing street lighting, like all the major elements in the vivaNext project, focuses on achieving a combination of practical and design objectives. Lighting is first and foremost a public safety consideration. There are strict national and local standards on how street lighting is designed, including how much lighting is required for different conditions. For example, different measures are used to determine the lighting levels for roadways compared to intersections and sidewalks. Once the levels are known, lighting designers develop a design, which includes variables such as pole height, spacing and “lux,” which is the amount of light to be provided by the fixture.

Once the lighting design is done, streetscape design objectives can come into play in order to marry the technical requirements with the architectural priorities needed to achieve the desired streetscape “look.” In the case of vivaNext, the streetscape objectives are for a modern, stylish and uncluttered look that will contribute to the corridors feeling like urban destinations, and make them distinctive from other Regional roadways.

To achieve all these safety requirements and design objectives, we have selected a special street light pole and luminaire [the light head or fixture], and arm that holds the luminaire, to be used along the Highway 7 rapidway segments. The poles will be a little higher than the ones they’ve replaced [9.9 metres high versus 8.0 metres], and they’re made of metal with a dark grey powder-coat finish for long-wear and less maintenance. Unlike most poles which are octagonal shaped and tapered to the top, these are round and cylindrical for a sleeker, more modern look. And the lighting head or luminaire on top was chosen to complement the sleek, modern look of our canopies.

The street lights also have a photo sensor to automatically turn on and off when it’s dark. And the bulbs – which are little larger than the light bulbs you have in your home – only need to be replaced every 4 years.

So next time you’re sitting at a stop light or at a bus stop and you’re looking at the beautiful new streetscape, you’ll know more about all the decisions that were needed to turn on the lights! Enjoy!!

Categories
Construction Rapidways

bringing the vivaNext long-term plan for the future to life

video - Highway 7 East: summer update 2014

With crews working on the finishing touches on the eastern half of the Highway 7 rapidway, we’re getting closer to the completion of this rapid transit corridor. As much as we’re looking forward to celebrating this milestone, it’s only one [very exciting] step in a long path that started years ago.

There’s a lot of media coverage these days, of transit needs all across the Greater Toronto and Hamilton Area [GTHA], and we’re proud that York Region is actively working to bring rapid transit to our region. In 2002, the Region produced the York Region Transportation Master Plan and the follow-up Rapid Transit Plan, committing the Region to a blueprint of multiple transportation initiatives to be built over the next 30 years.

With approval to the Rapid Transit Plan, we got to work and in 2005 the Viva team launched “QuickStart,” the first phase of Viva service. Viva offered enhanced features that made transit more comfortable and convenient, and put the customer first. With ridership levels increasing steadily, Viva changed the way people in York Region thought of transit and there was appreciation for the higher level of services with enhanced features and frequencies.

But while our new Viva service was a major success and an important first step in encouraging people to try transit, designing the vivaNext rapid transit system was the Region’s long-term vision. Ontario municipalities are mandated to plan sustainable, more intensive land-use as part of the provincial government policy, and rapid transit is a key component in achieving that goal. Anticipating this, the Transportation Master Plan directed that future growth in York Region would be concentrated in new downtowns in Markham, Newmarket, Richmond Hill and Vaughan. By building more intensively in these areas, there would be less pressure for growth in existing neighbourhoods.

These urban centres would be connected by transportation “corridors,” making it easier for people to get around the region and providing transportation options, such as regular transit service. The vivaNext rapidways are being built along the corridors, providing these connections across York Region and into the rest of the GTHA.

Much of the new development being built around vivastations is compact and mixed-use, providing housing, employment, retail, dining, services and recreation, all within walking distance of transit. Developments include more welcoming public spaces, attractive landscaping, and other amenities that contribute to the centres becoming more dynamic destinations.

The plan is well and truly underway, and rapidways are being built on Highway 7 in both the east and west, as well as in Newmarket. The Toronto-York Spadina Subway Extension is under construction, and the designs for rapidways on Yonge Street are being finalized. Great new developments are popping up all over the new urban centres across the Region.

So when the next segment of rapidway on Highway 7 East starts service this summer, we can all celebrate the implementation of the first phase of our transportation and growth management blueprint, not to mention the end of construction! Check out the new video highlighting the Highway 7 East segment.

Categories
Construction Rapidways Uncategorized

check out the Keith Bridge progress

video - Davis Drive: Keith Bridge progress

It’s an exciting time for Newmarket as significant components of the Davis Drive rapidway project are beginning to take shape. Along with road widening and paving, construction of the first vivastation is underway at Parkside/Longford and Davis. As part of the vivaNext rapidway project on Davis Drive, the Keith Bridge is being completely reconstructed. Construction of the north side of the bridge is coming along and recently, the new bridge deck was poured with concrete. We’re excited to have captured part of the transformation!

The deck pour was originally scheduled to be a lengthy 16 hour operation, but to speed up the process our diligent crews brought in additional machines and completed the job in 8 hours – half the time. The pour was completed overnight, with crews working quickly and efficiently to minimize disruption to residents. Over 70 truckloads of concrete were pumped steadily into the form work of the bridge [similar to a mold]. Using what’s called a screed machine, the concrete was leveled out and smoothed to create a flat surface. Because the screed machine didn’t reach the outer edges of the bridge, workers expertly finished off the edges with hand trowels. Finally burlap and tarps were used to cover the poured concrete as part of the curing process. They were removed once the concrete set.

The bridge is on track to be completed by late 2014, and when finished it will include architectural features such as replica period light fixtures and poles, and decorative concrete railings that reflect Newmarket’s heritage. Check out the bridge pour video for yourself – after all, it’s not every day over 70 truckloads of concrete are poured in one continuous operation. Watch for more big moves as the transformation continues to unfold on Davis Drive!

 

Categories
Construction Rapidways

signs of progress

signs of progress

We’re really counting down the days to the next section of the vivaNext rapidway service opening on Highway 7 East from East Beaver Creek Road to South Town Centre Boulevard, and we know you are too! You’ll know we’re really in the final stretches of construction once you see Viva buses out on the new section of rapidway starting next week.

YRT\Viva will be doing driver training and testing on the Highway 7 East new section in the City of Markham, starting July 28 for a few weeks.

Training will be provided for everyone who will need to be familiar with the rapidways, the stations and equipment. There will be vehicles out on the rapidway, taking customer service staff and other YRT\Viva staff along the rapidways to test and familiarize themselves with the new section. Regular transit service will continue to pick-up passengers at the curbside stops, while we do the testing and finish paving the new section. Signs directing passengers will be posted at the stops.

The actual operator training will run from 7am to as late as 9pm some nights, seven days a week. During this time you can expect to see Viva buses running up and down the rapidway, and stopping at stations. The training will focus on entering and exiting the rapidway, and especially entering back into mixed traffic under Highway 404 and past South Town Centre Boulevard.

Training will also focus on the new transit signals at intersections, which will provide a single green arrow for transit operations. This signal will be clearly marked as being for transit only, but YRT\Viva operators will be trained to be cautious and on the lookout to make sure members of the driving public are obeying the signals correctly and not turning into the red rapidway lanes.

The trainees are all experienced Viva operators, so they know the route and the vehicle and have been enjoying the first phase of the rapidway that opened last year on Highway 7; this is just another segment of the system now running in its own dedicated lanes. They’re really excited to get going, knowing that there are just few more weeks of construction ahead of them.

 

Categories
Construction

the challenge of relocating utilities

The Challenge of Relocating Utilities

If we were building our vivaNext rapidways across undeveloped fields, widening the roadway to incorporate the median bus lanes would be a straightforward construction project involving excavation, building the road base and drainage system, boulevard and station construction, installing illumination, and paving. But, in all our projects, there are many existing utilities along the roadways that need to be moved first. Believe it or not, this part of the project – relocating existing utilities – can sometimes result in the greatest amount of complexity and schedule coordination. Here’s a primer on why this least-obvious part of the project can be so time-consuming, but is so critical, yet so complicated.

Utilities – which on our projects include a wide number of companies providing electricity, telecommunications, cable and gas – are typically private entities, which in some cases have connections to local municipalities, and in other cases are private for-profit organizations. In all cases, utilities own their own infrastructure and are responsible for designing, installing, paying for, and maintaining it. Utilities have direct relationships with their own customers, and have to plan for, manage and respond to service interruptions.

With so many users relying on the services along the roadway corridors, we need to work together before we can widen the roadway for the vivaNext project. A first step is to identify existing utilities, to confirm what has to be moved out of the way. To complete this first step, we collect all the information we can, including “as-builts,” which are drawings showing the location of existing utilities. Using the as-builts [and sometimes ground penetrating radar], we then carry out physical locates, where we dig small test pits to confirm that utilities are where we think they are, and what condition they’re in.

Once there is agreement on which utilities need to be moved, each company designs a new alignment for their service, or designs a shared structure such as an underground duct bank, with another company. These relocation designs have to work with our project’s requirements and dimensions [and our project’s design has to provide for a reasonable relocation design for the utilities], as well as with the alignments of all the other utilities. Just completing the design coordination and review alone is a complex and iterative process.

With the utility relocation designs complete, municipalities and other approval bodies such as the Ministries of Environment and Natural Resources and local conservation authorities – and railway companies where rail crossings are involved – review, comment on, and hopefully approve the plans. In many cases, private property owners also need to agree to provide access to the utility companies, adding yet another layer of complexity and coordination.

The final stage is the actual construction of the relocated utilities. Because there are strict construction rules about the separation required between crews, we work carefully to sequence the relocation work.

The roadway widening cannot be completed until utility relocations are finished in any given area. And as in any activity where multiple organizations have operations underway, we all need to work together collaboratively, and coordinating our efforts is critical, so we can get the rapidways built and in service for you. Like I said….complicated!

 

Categories
Construction Stations

building for the future: here comes the first Davis Drive vivastation

vivastation with blue glass canopy

 

If you’ve been travelling along Davis Drive recently, you’ll notice an exciting development taking shape on the vivaNext rapidway construction project: the installation of the first of three vivastations is being installed at the intersection of Parkside and Longford!

Here’s a quick overview of the vivastations, and how they’ll be installed.

Similar to the vivastations on Highway 7, the vivastations along Davis are going to be aesthetically pleasing and very functional. The curved Viva blue glass that makes up the canopy is surprisingly rugged – this glass is curved, tempered and laminated for strength, which prevents it from breaking into sharp pieces if it is cracked or broken. Reliability was our first priority in sourcing the manufacturer: our glass panels are actually being made by the company that makes nearly half of the world’s windshield glass.

Although the canopy is made up of nearly 100 individual panes of glass, each will be connected to its neighbour by small fasteners, referred to as “spiders” – so visually, the glass will look like it’s all one piece.

Supporting the glass underneath is a three-piece structure made of Canadian-fabricated steel, constructed just outside of Paris, Ontario. With durability in mind, the steel will be finished with a high-quality automotive-grade paint to minimize long-term maintenance costs.

Before the station components are delivered, a concrete platform is poured and set, and the connections built into the platform are prepared. Then the canopy’s three steel structural sections are brought in on a wide-load tractor trailer [it’s quite the sight to see them delivered!]. When installed they’re lifted into place. It takes about a week to align the sections perfectly and do some other prep work, in advance of the glass being delivered and installed. Lessons learned from Highway 7 have helped us find ways to modify the work to make the canopies easier and more efficient to install.

Because minimizing traffic impacts as much as we can is so important, our team has focused on finding strategies to install these huge canopies in a very small space with minimal lane closures.

Beyond providing rapid transit users with a comfortable and convenient experience, our vivastations are going to add a unique look and feel to Davis Drive which helps set the stage for future development. We look forward to celebrating this and other milestones as the work progresses!

 

Categories
Community Events Construction

Join us for a construction tour!

Join Us!

Looking for something to do this weekend? Join vivaNext this Saturday, June 21st in Newmarket for construction tours and updates on the progress of the bus rapidway project! From 11am – 2pm, activities for all ages will be taking place at two locations: the vivaNext Project Information Centre [130 Davis Drive] and the corner of Main Street and Davis Drive.

Interested in how retaining walls are built, or curious about the preservation of heritage buildings? Sign up for guided walking tours at Main and Davis, taking place at 11am and 1pm, to get a behind the scenes look at the construction happening along the corridor. Kids receive free construction hats and can follow along with an interactive map. At the vivaNext Project Information Centre, view detailed maps and schedules of the project, and specialists will be on hand to answer any of your questions.

Throughout the day, kids can meet “Construction Guy” and “Explorer Girl” and everyone can cool off with complimentary ice cream. There are also plenty of opportunities to win prizes – enter for a chance to win a ShopDavis prize pack or pick up a scratch ‘n’ win card for additional giveaways.

We know construction is messy. For everyone who has continued to support our shops and businesses on Davis Drive, we truly appreciate it – continue to stop, eat and shop Davis. We‘re excited to meet you all and provide updates on what’s happening in your community. Hope to see you Saturday!

 

 

Categories
Construction General Rapidways Stations

signs, signs, everywhere a sign

It seems anywhere and everywhere you go these days there’s a sign of some type that catches your eye. Whether it’s an advertising, traffic or directional sign, it’s meant to grab your attention. The purpose of all the signs out there is for people to watch and read them every day as they pass by, so that you know what is going on in their neighbourhoods.

With the large number of signs out there you may become desensitized, but the signs in construction zones are there for your safety. A busy season of road work is underway on several vivaNext projects, so we hope drivers and pedestrians pay close attention to construction markers and signs as they may change daily depending on the work.

For pedestrians, crossing between intersections is tempting. But during construction, it’s especially important to cross at crosswalks – lane closures can change frequently and although construction areas are well marked, drivers may not see a pedestrian crossing unexpectedly.  When large equipment and trucks are working in an area, it is especially confusing if workers are not expecting people in their work zones, so please make sure you are in a safe area, which will be well marked with a sign, of course.

We understand the frustration of being a driver stuck in traffic too, and we’re using large digital signs on the street, to let you know ahead of time about lane closures and detours, as well as providing current travel times.   We hope these signs help you plan your route accordingly and help you manage your travel times.  To receive regular updates about our construction projects, subscribe to our email notices. And for on-the-go traffic alerts about our construction, follow us on Twitter.

Whether you’re biking, walking or driving this summer, we hope you’re enjoying the weather, staying alert and following the signs that keep you safe.