Davis Drive will be widened to create two dedicated lanes for rapidways in the centre of the road between Yonge Street and Roxborough Road. In 2010, we began testing soil, relocating utilities and removing buildings (and recycling building materials) to prepare for road construction. We’ve scheduled road construction to begin in fall 2011, but before we start working on the road we have more utilities to relocate, retaining walls to build, and we need to widen the Keith Bridge.
So we have lots of work to do this year. With the project continuing to move forward, we’re inviting you to drop in to our open house next Thursday. If you missed all the previous meetings or didn’t catch us at various community events, this is your opportunity to come and look at maps and information boards, and talk to us. You’ll learn about how the rapidways will work and how they’ll benefit Newmarket, and also about what you can expect during construction and how you can stay informed throughout the project.
If you can’t come to the meeting be sure to sign up for project updates, and check out the Past Meetings page on our website, where we’ll also post all the materials from this open house.
Join Us
Date: Thursday, January 27, 2011
Time: Drop in between 2 p.m. and 8 p.m.
Location: Bethel Christian Reform Church
333 Davis Drive, Newmarket